9·1免费观看完整版高清,scp166胸下面污,老司机污污福利院,国产免费人做人爱,jlzzjlzz亚洲

公共危機管理目的模板(10篇)

時間(jian):2023-09-08 16:59:15

導言:作為寫(xie)作愛好者,不(bu)可錯過為您(nin)精心(xin)挑選(xuan)的(de)10篇(pian)公共危(wei)機管理(li)目的(de),它們將為您(nin)的(de)寫(xie)作提供全新的(de)視角,我們衷心(xin)期(qi)待(dai)您(nin)的(de)閱讀,并希望這些內容能為您(nin)提供靈感和(he)參(can)考。

公共危機管理目的

篇1

Abstract: The construction industry is one of the pillars of China's national economic construction, and thus the quality of the pros and cons, and closely related to people's lives. However, due to the construction of the environment is more complex, and its long production cycle, high cost, and therefore its construction risk is also greater compared with the general merchandise. Therefore, the construction process of the construction project should be carried out rigorous risk management, to ensure the smooth construction effectively carried out.Keywords: construction project; construction; crisis

中圖(tu)分(fen)類號:TU74 文獻標(biao)識(shi)碼: A 文章編號:

建(jian)筑(zhu)施(shi)工(gong)(gong)(gong)項(xiang)(xiang)(xiang)(xiang)目(mu)(mu)的危(wei)(wei)機(ji)(ji)管理(li)主要(yao)分(fen)(fen)為對施(shi)工(gong)(gong)(gong)前期的成本預測誤差管理(li),施(shi)工(gong)(gong)(gong)過程的成本、質(zhi)量(liang)危(wei)(wei)機(ji)(ji)管理(li)以及工(gong)(gong)(gong)程完(wan)工(gong)(gong)(gong)后(hou)的總核算核查(cha)危(wei)(wei)機(ji)(ji)三個部分(fen)(fen)。因(yin)此,如(ru)何有(you)效(xiao)的在項(xiang)(xiang)(xiang)(xiang)目(mu)(mu)上馬之前就進行(xing)(xing)好項(xiang)(xiang)(xiang)(xiang)目(mu)(mu)可行(xing)(xing)性(xing)分(fen)(fen)析(xi),在施(shi)工(gong)(gong)(gong)中及時(shi)發(fa)現隱藏的質(zhi)量(liang)危(wei)(wei)機(ji)(ji)、管理(li)危(wei)(wei)機(ji)(ji),在施(shi)工(gong)(gong)(gong)完(wan)工(gong)(gong)(gong)后(hou)對其核算進行(xing)(xing)分(fen)(fen)析(xi),是擺在建(jian)筑(zhu)單(dan)位面前的一項(xiang)(xiang)(xiang)(xiang)十分(fen)(fen)重(zhong)要(yao)的任務。本文主要(yao)從施(shi)工(gong)(gong)(gong)中所存(cun)在的問題入手,對建(jian)筑(zhu)工(gong)(gong)(gong)程項(xiang)(xiang)(xiang)(xiang)目(mu)(mu)的危(wei)(wei)機(ji)(ji)的產生進行(xing)(xing)分(fen)(fen)析(xi),最后(hou)提出危(wei)(wei)機(ji)(ji)的解決措(cuo)施(shi),以增(zeng)強其管理(li)能力,使得建(jian)筑(zhu)企業能夠更加切實有(you)效(xiao)的獲得最大的利益。

一、建筑項(xiang)目危(wei)機的內涵

危機(ji)管理(li),有許多學者對其涵義進行(xing)過詮釋,比較得到大家認同的(de)是危機(ji)管理(li)大師 Robert?Heath[5]給(gei)出(chu)的(de)定義,即(ji):“危機(ji)管理(li)包含(han)對危機(ji)事前、事中、事后(hou)所(suo)有方面的(de)管理(li)。”我國(guo)著(zhu)名(ming)學者賈(jia)斌昌[4]也給(gei)出(chu)了(le)解(jie)釋,他(ta)認為“危機(ji)管理(li)就是政府組織相關力量(liang)對可(ke)能發生(sheng)或(huo)已經發生(sheng)的(de)危機(ji)事件進行(xing)預測、監督、控制和協調處理(li)以期有效(xiao)地(di)預防、處理(li)和消(xiao)除(chu)危機(ji)、減少損失(shi)的(de)過程。”

而(er)針對我國國情,建筑施工項目(mu)(mu)(mu)的(de)危機(ji)管理就是力(li)求在項目(mu)(mu)(mu)施工過程中(zhong)消除隱藏的(de)危機(ji)因素,從根(gen)源上杜絕危機(ji)的(de)產生;若項目(mu)(mu)(mu)危機(ji)已(yi)然爆發,能(neng)在第一時間給予(yu)的(de)回應,并通過備(bei)用計劃(hua)將損失降到最(zui)低;在危機(ji)消除后,能(neng)夠(gou)通過總結(jie)和學習,不(bu)斷完善項目(mu)(mu)(mu)的(de)危機(ji)管理體系。

二、建(jian)設項目存在的危機

1、管理不善

由于(yu)施工(gong)單位缺乏基本(ben)建設的(de)專業管(guan)(guan)理(li)(li)人才,以至于(yu)對工(gong)期、工(gong)量、工(gong)款評(ping)(ping)估不足(zu),而(er)臨時成立的(de)管(guan)(guan)理(li)(li)機構對工(gong)程(cheng)的(de)了(le)解不足(zu),因(yin)而(er)雙方(fang)之間缺乏有(you)效的(de)溝(gou)通(tong)與科學管(guan)(guan)理(li)(li),使得有(you)關(guan)單位在(zai)項(xiang)目評(ping)(ping)估、招(zhao)投標(biao)、施工(gong)等重(zhong)(zhong)要階(jie)段有(you)了(le)抬高(gao)造(zao)價的(de)機會,最終導致了(le)投資總額嚴重(zhong)(zhong)超(chao)過預(yu)算標(biao)準,從而(er)造(zao)成施工(gong)單位的(de)投資沒法發揮最大(da)的(de)經濟效益(yi)。這不僅(jin)體現在(zai)前(qian)期可(ke)行性分析所(suo)做出(chu)的(de)成本(ben)預(yu)測(ce)不夠準確上(shang),還體現在(zai)項(xiang)目實(shi)施過程(cheng)中諸多人為因(yin)素的(de)干預(yu)上(shang)。

2、建設(she)項目附加(jia)功能過(guo)多

參與建(jian)筑(zhu)建(jian)設(she)的相關單(dan)位(wei)普遍會出(chu)于提高(gao)(gao)各(ge)方(fang)(fang)(fang)自身利益的考慮,想方(fang)(fang)(fang)設(she)法(fa)提高(gao)(gao)不必要的標準(zhun)、增加一些附屬功能等(deng)方(fang)(fang)(fang)式來抬高(gao)(gao)造價(jia)。這(zhe)就(jiu)使(shi)得施工方(fang)(fang)(fang)無法(fa)合理使(shi)用每(mei)一筆(bi)資金,使(shi)其物有所用,物盡其值。這(zhe)樣的高(gao)(gao)標準(zhun)、多功能造成了施工的極(ji)大浪費。此外,由于施工方(fang)(fang)(fang)缺乏基本建(jian)設(she)的專(zhuan)業(ye)管理經驗,還比較容(rong)易出(chu)現工程質量差,工期過長,甚至“爛尾”等(deng)問題。

3、管理人(ren)員(yuan)責任心不強

管(guan)理人(ren)(ren)(ren)員(yuan)不僅(jin)僅(jin)包括企業(ye)的(de)(de)決策者,好(hao)包括項目的(de)(de)總負責人(ren)(ren)(ren)、工程師、監(jian)理人(ren)(ren)(ren)員(yuan)、會計人(ren)(ren)(ren)員(yuan)等(deng)等(deng)。由于決策者對(dui)(dui)于項目施工危(wei)機(ji)(ji)控(kong)制(zhi)(zhi)的(de)(de)認識度(du)不足(zu),導(dao)致了其對(dui)(dui)于項目危(wei)機(ji)(ji)控(kong)制(zhi)(zhi)相對(dui)(dui)放松的(de)(de)局(ju)面。造成(cheng)(cheng)了下屬管(guan)理人(ren)(ren)(ren)員(yuan)利(li)用職務之便,私自(zi)購置自(zi)身(shen)福利(li)用品,而相關會計人(ren)(ren)(ren)員(yuan)也對(dui)(dui)此持有默許的(de)(de)態(tai)度(du),這就導(dao)致了危(wei)機(ji)(ji)控(kong)制(zhi)(zhi)成(cheng)(cheng)為了一(yi)紙空談(tan),而沒法在施工中落(luo)到實處。

4、缺乏完(wan)備(bei)的危機(ji)管理制(zhi)度和體(ti)系

即使大多(duo)數企(qi)業都比(bi)較重視危(wei)(wei)機(ji)控制管理(li),但他們都缺乏專門(men)的部門(men)或個人負(fu)責發(fa)現、監控、處理(li)項目危(wei)(wei)機(ji),也未建立完善(shan)的、規(gui)范(fan)的、可行性(xing)的危(wei)(wei)機(ji)管理(li)體(ti)系,這導(dao)致(zhi)絕大多(duo)數工程施(shi)工中都無法在項目開發(fa)的過程中及時了解到最(zui)新(xin)的動態隱藏危(wei)(wei)機(ji)的情況。

5、技術設(she)備(bei)更新不夠(gou)。

雖然危(wei)機控(kong)(kong)制(zhi)的理念已經(jing)深(shen)入到了(le)許(xu)多(duo)施工單位(wei)的文件中(zhong),可是(shi)其(qi)應用還(huan)處于初期,因為可以對(dui)危(wei)機控(kong)(kong)制(zhi)中(zhong)收集到的數據(ju)進行全(quan)面(mian)分析的配套的軟(ruan)件開(kai)發相對(dui)還(huan)是(shi)不(bu)足的,所以導致了(le)許(xu)多(duo)危(wei)機控(kong)(kong)制(zhi)信息(xi),即(ji)使收集到位(wei),也(ye)沒(mei)法更加便捷(jie)的輸出成決策者可使用的形式(shi)。

三、建設項目危機的產生原因

施工(gong)組織的(de)管理對整個施工(gong)有直接的(de)影響,危(wei)機(ji)(ji)的(de)產生大多數情況是由于施工(gong)單(dan)位對潛在(zai)的(de)危(wei)機(ji)(ji)因素的(de)忽略,導(dao)致了錯(cuo)過、預(yu)防和(he)控制危(wei)機(ji)(ji)的(de)最佳時機(ji)(ji),問(wen)題主要集中在(zai):

1、外部事(shi)件對項目造成的危機

例如自然災害、來自社會政治領域經濟領域、公共衛生領域的社會災難等。“覆巢之下,焉有完卵”,尤其是自然災害比較常見,施工項目受其影響也較大。微觀上,還表現在由于企業采辦材料的質量不合格等方面。事故對外部造成重大負面影響也會危及到項目本身如果項目實施過程中發生了重大事故在社會上造成了重大負面影響,同樣也會反過來危機項目本身值得一(yi)提(ti)的(de)是(shi)一(yi)些不是(shi)很(hen)嚴重的(de)事(shi)故,如果(guo)沒有處理好(hao),同(tong)樣也會轉變成(cheng)大的(de)事(shi)故。如人員傷亡、拖欠(qian)民工工資、對周圍居(ju)民生活產生影(ying)響等。

2、企業自身的(de)問題

如企業資金鏈斷裂,投資超出預算導致后期資金不足,或者管理人(ren)員責(ze)任(ren)心不強、決(jue)策(ce)者的(de)(de)決(jue)策(ce)錯誤(wu),招標工(gong)程中的(de)(de)不正(zheng)之風與(yu)不正(zheng)當行為,對地(di)質環境勘(kan)測的(de)(de)失誤(wu)以及施工(gong)過程的(de)(de)技術手(shou)段(duan)不足等都會導致危機的(de)(de)產生。

四(si)、建設項目危機管理過(guo)程(cheng)探討

1、在工程建設中調整可行性研究報(bao)告

在工程施工中,請相關部門抱著真實、審慎的態度,根據實際施工中所面臨的時間、財務、質量的危機,對施工可行性研究進行及時調整,以控制好項目的管理(li)進程和科學成本,以達(da)到項(xiang)目資源的(de)合(he)理(li)配置、提(ti)高建設投(tou)資效益的(de)目的(de)。這(zhe)樣便能保證(zheng)項(xiang)目決策的(de)正確性,避(bi)免決策失誤(wu)。

2、科學設置管理(li)機(ji)構和監督機(ji)構。

設立專門(men)(men)的管理和監(jian)督機(ji)構,對于不同的部(bu)門(men)(men),分層建立平行監(jian)督機(ji)制,各部(bu)門(men)(men)彼此監(jian)督,定期公布(bu)工程的進(jin)度、資(zi)金(jin)使(shi)用(yong)等情(qing)況,以求降低管理費用(yong)等軟化費用(yong)的使(shi)用(yong),創建廉(lian)潔、高效和優質工程。其(qi)次,要(yao)求工程管理、財務、審計等部(bu)門(men)(men)各司其(qi)職,從(cong)而(er)能夠(gou)使(shi)單位領(ling)導對建設的全(quan)過程進(jin)行宏觀管理和監(jian)督。

3、抓好設計環節,做好危機控制。

項(xiang)(xiang)(xiang)目(mu)危(wei)機控制(zhi)貫(guan)穿于項(xiang)(xiang)(xiang)目(mu)建設的(de)(de)始終, 危(wei)機控制(zhi)的(de)(de)關鍵(jian)在(zai)于投資的(de)(de)決策和設計(ji)。這就要求施(shi)工(gong)(gong)單位應該(gai)聘請專業的(de)(de)項(xiang)(xiang)(xiang)目(mu)可行性分析(xi)公司,對(dui)項(xiang)(xiang)(xiang)目(mu)的(de)(de)投資回收進(jin)行分析(xi)。這不僅包括(kuo)施(shi)工(gong)(gong)項(xiang)(xiang)(xiang)目(mu)的(de)(de)進(jin)程設計(ji),還有資金投入的(de)(de)時間、數量設計(ji)等。這樣才能更(geng)有效地控制(zhi)建筑工(gong)(gong)程造(zao)價,避免超(chao)標(biao),功能過剩。

4、實行全過程控制

施(shi)工(gong)項目(mu)成(cheng)(cheng)本(ben)(ben)(ben)的發生涉及(ji)到項目(mu)的整(zheng)個(ge)周(zhou)期(qi)。因(yin)此(ci),要(yao)從項目(mu)上馬前就對項目(mu)成(cheng)(cheng)本(ben)(ben)(ben)進行合(he)理規劃(hua)做好(hao)成(cheng)(cheng)本(ben)(ben)(ben)預測,制(zhi)定好(hao)成(cheng)(cheng)本(ben)(ben)(ben)計(ji)劃(hua)和成(cheng)(cheng)本(ben)(ben)(ben)目(mu)標(biao);在投標(biao)開始至中(zhong)標(biao)后的實(shi)施(shi)及(ji)竣(jun)工(gong)驗交過程(cheng)中(zhong),實(shi)行全過程(cheng)危機控(kong)制(zhi),優(you)化施(shi)工(gong)組(zu)織設(she)計(ji)和施(shi)工(gong)方案,提高勞(lao)動(dong)生產效率,采取技(ji)術和組(zu)織管理相結(jie)合(he)的手段,控(kong)制(zhi)好(hao)事中(zhong)成(cheng)(cheng)本(ben)(ben)(ben);在竣(jun)工(gong)驗收階段,要(yao)及(ji)時辦(ban)理工(gong)程(cheng)結(jie)算及(ji)追加的合(he)同價款,做好(hao)成(cheng)(cheng)本(ben)(ben)(ben)的核算和分析,并在竣(jun)工(gong)結(jie)算包括中(zhong)對項目(mu)成(cheng)(cheng)本(ben)(ben)(ben)如實(shi)進行反(fan)應。

5、建立(li)危機管理預案(an)

危(wei)(wei)機(ji)(ji)管(guan)理預(yu)案(an)的建立,有(you)利于(yu)在(zai)危(wei)(wei)機(ji)(ji)發生(sheng)前,及時(shi)發現(xian)并且重視潛在(zai)的隱患因素,使(shi)其杜絕危(wei)(wei)機(ji)(ji)的發生(sheng)。若危(wei)(wei)機(ji)(ji)已然產(chan)生(sheng),那么可以根據(ju)檔案(an)查閱以往此類(lei)危(wei)(wei)機(ji)(ji)的處理措施,以求在(zai)第一(yi)時(shi)間有(you)序、有(you)效的解決危(wei)(wei)機(ji)(ji)。在(zai)危(wei)(wei)機(ji)(ji)解決后,也可以將該危(wei)(wei)機(ji)(ji)的成因、解決措施記(ji)入(ru)檔案(an),以為其他企業(ye)提供資(zi)料。施工項目中的危(wei)(wei)機(ji)(ji)管(guan)理預(yu)案(an)應該包(bao)括(kuo)以下因素:預(yu)警系(xi)統(tong)、通訊系(xi)統(tong)、危(wei)(wei)機(ji)(ji)管(guan)理程序。

五、結束語

篇2

中圖分類號TV5 文(wen)獻標(biao)識碼A 文(wen)章編(bian)號 1674-6708(2014)121-0193-02

1 帷幕灌(guan)漿技術的應用(yong)原理

作為一(yi)種極為有(you)效(xiao)的(de)(de)防滲技(ji)術,帷幕灌漿技(ji)術中運(yun)用(yong)地(di)質鉆(zhan)(zhan)機設備,通過對地(di)層的(de)(de)處(chu)理實(shi)(shi)施鉆(zhan)(zhan)孔,從而(er)構成一(yi)道帷幕形(xing)鉆(zhan)(zhan)孔。運(yun)用(yong)水(shui)(shui)泥(ni)漿向被(bei)處(chu)理的(de)(de)鉆(zhan)(zhan)孔內(nei)實(shi)(shi)施高壓灌注,水(shui)(shui)泥(ni)漿沿著(zhu)地(di)層分析向實(shi)(shi)施深入(ru)滲透(tou)(tou),當(dang)水(shui)(shui)泥(ni)漿有(you)凝(ning)固出現(xian)滯(zhi)后,鉆(zhan)(zhan)孔內(nei)的(de)(de)水(shui)(shui)泥(ni)漿柱和(he)周(zhou)圍(wei)會被(bei)水(shui)(shui)泥(ni)漿滲透(tou)(tou)并(bing)有(you)土體凝(ning)結(jie),從而(er)形(xing)成一(yi)道密實(shi)(shi)的(de)(de)防水(shui)(shui)帷幕,使水(shui)(shui)流向灌漿地(di)層處(chu)的(de)(de)滲透(tou)(tou)現(xian)象得到有(you)效(xiao)防止。

2 帷幕(mu)灌(guan)漿(jiang)技術(shu)的施工工藝

2.1施工測量

從帷幕灌漿技術進(jin)行(xing)分析(xi),最重(zhong)要(yao)的是對(dui)鉆孔的進(jin)度進(jin)行(xing)控制(zhi),與相應(ying)的信息資料相結合進(jin)行(xing)精確(que)測(ce)量(liang)(liang)。在(zai)測(ce)量(liang)(liang)過程中,應(ying)詳細檢查相關數據(ju)(ju),促使數據(ju)(ju)的精確(que)性得到(dao)保障,開展(zhan)測(ce)量(liang)(liang)工(gong)作時,還需要(yao)將鉆孔進(jin)行(xing)布設。

2.2設置灌漿孔

與(yu)(yu)設(she)計要求相結合,設(she)置(zhi)(zhi)防滲(shen)軸線上的灌漿(jiang)孔時,應(ying)分序列進行(xing),使(shi)(shi)其孔間距(ju)保(bao)持在(zai)2m左(zuo)右,在(zai)對灌漿(jiang)孔進行(xing)布(bu)置(zhi)(zhi)時,應(ying)與(yu)(yu)多項要求相滿(man)足(zu),在(zai)處(chu)理孔洞間距(ju)之外時,應(ying)保(bao)持孔間軸線,使(shi)(shi)其偏(pian)差(cha)處(chu)于10cm以(yi)下,在(zai)防滲(shen)墻混凝土(tu)底(di)部(bu)20m~30m左(zuo)右對孔洞深度進行(xing)設(she)置(zhi)(zhi),使(shi)(shi)其控(kong)制在(zai)設(she)計帷幕灌漿(jiang)底(di)線以(yi)上即可。

2.3開挖成孔

作(zuo)為帷幕灌漿(jiang)技術工(gong)(gong)藝中(zhong)的(de)(de)一(yi)個極為重要的(de)(de)環(huan)節,開挖成孔的(de)(de)主要工(gong)(gong)作(zuo)包括:

1)場地清理。與現場情況相結合,對地板實(shi)施鋪(pu)設(she),并(bing)(bing)采用方形(xing)木材對鉆(zhan)孔平臺(tai)進行搭設(she),接著對樁(zhuang)架進行安裝,并(bing)(bing)在合理的位(wei)置對鉆(zhan)機實(shi)施擺(bai)放。當鉆(zhan)機處于端(duan)正且溫度控制好之后,應確保灌漿孔、鉆(zhan)桿以及鉆(zhan)機平臺(tai)三(san)個中(zhong)心點都在同一(yi)條支線(xian)上。

2)當(dang)安放完鉆機之后,應開展試機和(he)試鉆,當(dang)完全掌(zhang)握鉆機供水、動力(li)以及供電等系統和(he)設(she)備后,即可實施鉆進施工。

3)對所(suo)有鉆(zhan)(zhan)具、鉆(zhan)(zhan)桿以(yi)及其它相(xiang)關鉆(zhan)(zhan)進零部件等(deng)進行(xing)仔細認真檢查(cha),禁止鉆(zhan)(zhan)桿和(he)鉆(zhan)(zhan)具有彎曲變形等(deng)情況出現,必須將各個部位接(jie)頭都保(bao)持在(zai)牢固狀態,且(qie)存在(zai)良好的同(tong)心度,接(jie)著進行(xing)鉆(zhan)(zhan)孔處理(li)。

2.4沖洗縫隙及(ji)壓水試(shi)驗

當完成(cheng)(cheng)帷幕灌(guan)漿技術(shu)成(cheng)(cheng)孔(kong)(kong)之(zhi)后(hou),應采用導(dao)管,使(shi)孔(kong)(kong)外有大(da)流量高壓(ya)的(de)水(shui)流沖(chong)(chong)孔(kong)(kong)底,并保持(chi)持(chi)續沖(chong)(chong)洗(xi)(xi)狀態(tai),不斷沖(chong)(chong)洗(xi)(xi)孔(kong)(kong)壁(bi),這(zhe)樣單孔(kong)(kong)的(de)沖(chong)(chong)洗(xi)(xi)能夠使(shi)回流的(de)水(shui)出現澄清(qing)后(hou)還(huan)要(yao)進行10min的(de)繼續沖(chong)(chong)洗(xi)(xi),使(shi)總的(de)沖(chong)(chong)洗(xi)(xi)時間保持(chi)在30min以上(shang),對于串通的(de)孔(kong)(kong)而言,應處于2h以上(shang)的(de)時間,沉渣(zha)的(de)厚度保持(chi)在小于20cm,一般,在該(gai)段(duan)灌(guan)漿的(de)壓(ya)力值8成(cheng)(cheng)左右(you)為分析沖(chong)(chong)洗(xi)(xi)的(de)壓(ya)力值設(she)置。當縫隙沖(chong)(chong)洗(xi)(xi)完成(cheng)(cheng)之(zhi)后(hou),還(huan)應對壓(ya)水(shui)試驗進行操(cao)作,一般對單點方法(fa)進行運用,同時將壓(ya)力設(she)置為該(gai)段(duan)灌(guan)漿壓(ya)力的(de)8成(cheng)(cheng)作用,使(shi)其(qi)小于1MPa即可(ke)。

2.5灌漿施工

通(tong)過(guo)試(shi)驗,當與規定(ding)要求相符之后(hou),即可對關鍵性環節是時(shi)(shi)候灌(guan)漿(jiang)(jiang)(jiang)(jiang)施工,一(yi)般,帷幕灌(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)運(yun)用是自下(xia)(xia)而(er)上分段開展的(de)(de),通(tong)過(guo)施加規定(ding)的(de)(de)壓力,當注(zhu)入率處于1L/min以(yi)下(xia)(xia)時(shi)(shi),一(yi)個(ge)持續進(jin)行(xing)1h的(de)(de)灌(guan)注(zhu),該(gai)方(fang)法(fa)的(de)(de)運(yun)用能(neng)夠(gou)將灌(guan)漿(jiang)(jiang)(jiang)(jiang)得(de)以(yi)完成。工程應(ying)用中也會有自上而(er)下(xia)(xia)的(de)(de)灌(guan)漿(jiang)(jiang)(jiang)(jiang)施工存(cun)在(zai),在(zai)該(gai)狀況下(xia)(xia),需要相應(ying)對灌(guan)漿(jiang)(jiang)(jiang)(jiang)時(shi)(shi)間進(jin)行(xing)0.5h~1h的(de)(de)灌(guan)注(zhu)。在(zai)灌(guan)漿(jiang)(jiang)(jiang)(jiang)施工過(guo)程中,應(ying)對進(jin)漿(jiang)(jiang)(jiang)(jiang)和(he)回漿(jiang)(jiang)(jiang)(jiang)比值進(jin)行(xing)實時(shi)(shi)測量,若有回漿(jiang)(jiang)(jiang)(jiang)變濃出(chu)現,則應(ying)采(cai)用和(he)進(jin)漿(jiang)(jiang)(jiang)(jiang)配合比材料一(yi)致的(de)(de)新(xin)漿(jiang)(jiang)(jiang)(jiang)進(jin)行(xing)灌(guan)注(zhu)施工,當存(cun)在(zai)不好的(de)(de)灌(guan)漿(jiang)(jiang)(jiang)(jiang)效果時(shi)(shi),通(tong)過(guo)半個(ge)小(xiao)時(shi)(shi)的(de)(de)灌(guan)注(zhu),直至灌(guan)注(zhu)停止即可。

2.6孔洞密封

當(dang)灌漿(jiang)完(wan)成之(zhi)后(hou),應運用壓(ya)力灌漿(jiang)及置(zhi)換等方法進(jin)(jin)行孔(kong)洞密封。當(dang)完(wan)成全孔(kong)灌漿(jiang)后(hou),采(cai)用水泥(ni)(ni)漿(jiang)5:1的(de)配合比置(zhi)換孔(kong)洞內漿(jiang)液,去(qu)除孔(kong)洞灌漿(jiang)管,運用更大(da)的(de)灌漿(jiang)壓(ya)力及相(xiang)同配合比的(de)水泥(ni)(ni)漿(jiang)進(jin)(jin)行0.5h純(chun)壓(ya)的(de)操作,認真記錄整個換漿(jiang)過程的(de)實(shi)際(ji)狀(zhuang)況。

3 帷幕灌漿施(shi)(shi)工技術(shu)中存在的(de)問題(ti)和措施(shi)(shi)

3.1灌漿中斷

在灌(guan)(guan)漿(jiang)施(shi)工(gong)中(zhong),由于堵塞(sai)、機械故障、輸(shu)漿(jiang)管(guan)破裂以(yi)(yi)及(ji)停(ting)電(dian)等(deng)因素導致灌(guan)(guan)漿(jiang)過程(cheng)中(zhong)出現(xian)的(de)(de)(de)中(zhong)斷現(xian)象(xiang)。其預防措施(shi)主要(yao)包括以(yi)(yi)下幾種:對(dui)滿(man)足(zu)(zu)施(shi)工(gong)標準要(yao)求(qiu)的(de)(de)(de)輸(shu)漿(jiang)管(guan)材進行使(shi)用(yong),且(qie)在施(shi)工(gong)過程(cheng)中(zhong),應對(dui)連(lian)接牢固、堵塞(sai)現(xian)象(xiang)以(yi)(yi)及(ji)無破損問題(ti)實(shi)(shi)施(shi)經(jing)常檢(jian)查。促(cu)使(shi)灌(guan)(guan)漿(jiang)泵的(de)(de)(de)性能(neng)和施(shi)工(gong)需(xu)要(yao)得(de)到(dao)滿(man)足(zu)(zu),最最大灌(guan)(guan)漿(jiang)壓(ya)力(li)作(zuo)用(yong)下,進行長時(shi)間(jian)(jian)的(de)(de)(de)持續操作(zuo),并落實(shi)(shi)施(shi)工(gong)中(zhong)的(de)(de)(de)保養,在完成每次灌(guan)(guan)漿(jiang)之后,對(dui)灌(guan)(guan)漿(jiang)泵的(de)(de)(de)清(qing)洗(xi)做到(dao)詳細操作(zuo),及(ji)時(shi)校正壓(ya)力(li)表,從而將施(shi)工(gong)的(de)(de)(de)預期(qi)目標得(de)以(yi)(yi)實(shi)(shi)現(xian)。另外,同樣應對(dui)高壓(ya)灌(guan)(guan)漿(jiang)閥(fa)門和隔(ge)江塞(sai)等(deng)部件進行清(qing)洗(xi),定期(qi)對(dui)水電(dian)系統實(shi)(shi)施(shi)檢(jian)查和保養。一旦有灌(guan)(guan)漿(jiang)中(zhong)斷出現(xian),應運用(yong)必要(yao)的(de)(de)(de)措施(shi),盡可能(neng)將中(zhong)斷的(de)(de)(de)時(shi)間(jian)(jian)縮短,確(que)保盡早復灌(guan)(guan)。

3.2串漿

在(zai)灌漿(jiang)施(shi)工中,有時(shi)會產(chan)(chan)生漿(jiang)液從其他鉆孔(kong)(kong)或地下(xia)裂(lie)縫(feng)內流出的(de)現(xian)(xian)象,并流向帷(wei)幕設計范(fan)圍以外,引發串(chuan)(chuan)漿(jiang)問(wen)(wen)(wen)題出現(xian)(xian)。導致該問(wen)(wen)(wen)題產(chan)(chan)生的(de)主要原因是在(zai)灌注(zhu)孔(kong)(kong)間巖層時(shi),由(you)于有較(jiao)多縫(feng)隙相互串(chuan)(chuan)聯存在(zai),引發灌漿(jiang)連通(tong)問(wen)(wen)(wen)題形成,從而造成串(chuan)(chuan)漿(jiang)通(tong)路(lu)。在(zai)治理(li)串(chuan)(chuan)漿(jiang)問(wen)(wen)(wen)題時(shi),應(ying)運用(yong)以下(xia)內容進(jin)(jin)行(xing)(xing)操作:同時(shi)對(dui)串(chuan)(chuan)漿(jiang)孔(kong)(kong)和灌漿(jiang)孔(kong)(kong)進(jin)(jin)行(xing)(xing)灌注(zhu);運用(yong)灌漿(jiang)泵在(zai)每個孔(kong)(kong)洞位置(zhi)進(jin)(jin)行(xing)(xing)設置(zhi),開展灌注(zhu)施(shi)工;在(zai)串(chuan)(chuan)漿(jiang)孔(kong)(kong)漏漿(jiang)的(de)上(shang)方位置(zhi)對(dui)灌漿(jiang)塞實(shi)施(shi)安裝,從而實(shi)現(xian)(xian)封堵嚴密。

3.3漏漿

在灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)施工(gong)過(guo)程(cheng)中(zhong),由于(yu)有(you)(you)較多縫隙及較大灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)壓(ya)力存在,從(cong)而導(dao)致過(guo)大的(de)(de)漿(jiang)(jiang)(jiang)液(ye)(ye)注(zhu)入率現(xian)象發生(sheng),往往會(hui)有(you)(you)大量(liang)(liang)漏漿(jiang)(jiang)(jiang)出現(xian)。漏漿(jiang)(jiang)(jiang)治理的(de)(de)主要措(cuo)施包括(kuo)以下內容:運用(yong)低壓(ya)甚至(zhi)自流(liu)式的(de)(de)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)方式對灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)壓(ya)力降(jiang)低,直(zhi)至(zhi)逐漸填滿縫隙,并使(shi)流(liu)動性(xing)降(jiang)低后(hou),再(zai)(zai)(zai)使(shi)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)的(de)(de)壓(ya)力得到慢(man)慢(man)提(ti)(ti)升;限制進漿(jiang)(jiang)(jiang)量(liang)(liang),使(shi)其控制在小(xiao)于(yu)30L/min~40L/min,并運用(yong)濃漿(jiang)(jiang)(jiang)實施關(guan)注(zhu),直(zhi)到有(you)(you)明顯減少(shao)的(de)(de)進漿(jiang)(jiang)(jiang)量(liang)(liang)出現(xian)后(hou)再(zai)(zai)(zai)使(shi)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)的(de)(de)壓(ya)力實施慢(man)慢(man)提(ti)(ti)升。濃漿(jiang)(jiang)(jiang)的(de)(de)運用(yong)甚至(zhi)可以在灌(guan)(guan)(guan)(guan)注(zhu)漿(jiang)(jiang)(jiang)液(ye)(ye)中(zhong)對砂料實施摻入,通過(guo)漿(jiang)(jiang)(jiang)液(ye)(ye)流(liu)動性(xing)的(de)(de)降(jiang)低,對漿(jiang)(jiang)(jiang)液(ye)(ye)流(liu)動的(de)(de)范圍產生(sheng)限制,使(shi)得泥漿(jiang)(jiang)(jiang)不會(hui)有(you)(you)較遠流(liu)失現(xian)象產生(sheng),直(zhi)到單位(wei)吸漿(jiang)(jiang)(jiang)量(liang)(liang)降(jiang)低至(zhi)一(yi)定(ding)程(cheng)度后(hou),再(zai)(zai)(zai)運用(yong)不摻粗料的(de)(de)正常漿(jiang)(jiang)(jiang)液(ye)(ye)進行(xing)持(chi)續(xu)灌(guan)(guan)(guan)(guan)注(zhu),進一(yi)步提(ti)(ti)升灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)的(de)(de)壓(ya)力。在長(chang)時間(jian)(jian)內,當巖層出現(xian)大量(liang)(liang)進漿(jiang)(jiang)(jiang)現(xian)象時,還可采用(yong)間(jian)(jian)歇灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)的(de)(de)方法,開展一(yi)段(duan)時間(jian)(jian)的(de)(de)關(guan)注(zhu)后(hou)即停(ting)止灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)。當漿(jiang)(jiang)(jiang)液(ye)(ye)有(you)(you)一(yi)段(duan)時間(jian)(jian)凝結(jie)形成(cheng)后(hou)即可進行(xing)灌(guan)(guan)(guan)(guan)注(zhu)施工(gong)。

3.4固管

在(zai)(zai)泥(ni)漿(jiang)(jiang)(jiang)灌注(zhu)的(de)(de)過(guo)程中(zhong),當漿(jiang)(jiang)(jiang)液(ye)與(yu)凝(ning)結(jie)(jie)條件相(xiang)滿足時,則會(hui)導(dao)致孔壁與(yu)射(she)漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)形成(cheng)膠(jiao)結(jie)(jie),從而(er)產生固管(guan)(guan)(guan)問題(ti)。導(dao)致固管(guan)(guan)(guan)出現(xian)的(de)(de)原因主(zhu)要(yao)包括:在(zai)(zai)壓力作用下(xia)(xia)(xia),由(you)于漿(jiang)(jiang)(jiang)液(ye)會(hui)損失一(yi)部(bu)分(fen)水(shui)分(fen),并通(tong)過(guo)循環(huan),在(zai)(zai)水(shui)泥(ni)水(shui)化放熱和壓力的(de)(de)共(gong)同作用下(xia)(xia)(xia),溫度(du)會(hui)持續(xu)攀升,導(dao)致凝(ning)結(jie)(jie)時間大(da)幅度(du)減小。在(zai)(zai)孔內(nei)的(de)(de)環(huan)狀間隙位(wei)置、閥門以及灌漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)部(bu)位(wei)會(hui)出現(xian)水(shui)泥(ni)顆粒沉積。由(you)于射(she)漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)下(xia)(xia)(xia)端貼近孔壁,造成(cheng)漿(jiang)(jiang)(jiang)液(ye)循環(huan)過(guo)程中(zhong),射(she)漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)阻塞,引發(fa)沉淀現(xian)象更為嚴峻。固管(guan)(guan)(guan)的(de)(de)防治主(zhu)要(yao)有以下(xia)(xia)(xia)幾方面內(nei)容:在(zai)(zai)灌漿(jiang)(jiang)(jiang)施(shi)工中(zhong),運用回旋式孔口封閉器,會(hui)有經(jing)常上下(xia)(xia)(xia)活動和灌漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)轉(zhuan)動出現(xian);對回漿(jiang)(jiang)(jiang)濃度(du)和回漿(jiang)(jiang)(jiang)量進行經(jing)常觀察(cha),確保回漿(jiang)(jiang)(jiang)管(guan)(guan)(guan)內(nei)一(yi)直(zhi)存在(zai)(zai)15L/min的(de)(de)回漿(jiang)(jiang)(jiang)量存在(zai)(zai),并當具(ju)有過(guo)多回漿(jiang)(jiang)(jiang)失水(shui)現(xian)象時,應及時稀(xi)釋漿(jiang)(jiang)(jiang)液(ye)。

4水利工(gong)程灌漿施工(gong)技(ji)術的質量(liang)控制

4.1提升隊(dui)伍的(de)堆置和(he)能(neng)力

基礎灌漿的(de)(de)參數(shu)是持續變化(hua)的(de)(de),在人員(yuan)(yuan)安(an)排(pai)(pai)上(shang)應對(dui)具有地質經驗(yan)及相(xiang)應工(gong)程能力的(de)(de)工(gong)程師進行(xing)使(shi)用(yong),使(shi)其發揮工(gong)作(zuo)監督的(de)(de)作(zuo)用(yong),落實工(gong)作(zuo)人員(yuan)(yuan)的(de)(de)工(gong)作(zuo)安(an)排(pai)(pai),與工(gong)作(zuo)的(de)(de)強(qiang)度(du)相(xiang)結(jie)合對(dui)適(shi)合的(de)(de)監督者進行(xing)確定。

4.2細致控(kong)制準(zhun)則的編制

控制準則的內容主要包括以下幾方面:要求組織應有較強的控制能力(li);分配(pei)監理(li)人員(yuan)的工(gong)作、手段(duan)和(he)工(gong)作流程;設(she)置各項工(gong)作點;質量相關的事(shi)前事(shi)后處(chu)理(li)以及相關工(gong)作檢查方法和(he)評價標準等。

4.3核查施工方的能力和條件,與建(jian)設方相配合,理性(xing)地(di)對施工團隊(dui)進(jin)行(xing)選擇(ze)。

由于基礎灌(guan)漿(jiang)有(you)自身的(de)特(te)征存在,工(gong)(gong)程承包方(fang)會對專(zhuan)業(ye)能(neng)(neng)力(li)的(de)團隊進行(xing)組織安排,此時則應(ying)對分(fen)包方(fang)的(de)工(gong)(gong)作能(neng)(neng)力(li)的(de)整(zheng)體(ti)素(su)質進行(xing)考(kao)察,看其是否滿足工(gong)(gong)作要求(qiu)。分(fen)析類似工(gong)(gong)程的(de)實際經驗,使企業(ye)的(de)基本條件、工(gong)(gong)作能(neng)(neng)力(li)以及完(wan)工(gong)(gong)時的(de)工(gong)(gong)程質量得到(dao)有(you)效掌握。

5結論

綜上所述,本文(wen)結(jie)合水(shui)利(li)工(gong)程基(ji)礎(chu)(chu)灌(guan)漿施(shi)工(gong)技(ji)術的(de)實際應用、技(ji)術措施(shi)以(yi)及(ji)質(zhi)量控制方法,全面分析和探討(tao)了基(ji)礎(chu)(chu)灌(guan)漿施(shi)工(gong)技(ji)術。水(shui)利(li)施(shi)工(gong)企業在新(xin)時(shi)期(qi)背景下,與(yu)時(shi)展的(de)需(xu)要相滿足,重點是增強自身核心競爭力(li)和市場適應力(li)。在水(shui)利(li)工(gong)程項目建設中,應對基(ji)礎(chu)(chu)灌(guan)漿施(shi)工(gong)技(ji)術水(shui)平得到改善,更好的(de)提(ti)升水(shui)利(li)工(gong)程的(de)質(zhi)量,從(cong)而(er)實現企業經濟效(xiao)率的(de)最大化。

參考文獻

篇3

建(jian)筑施(shi)工(gong)(gong)過程中,常常會(hui)發生(sheng)一些意(yi)想不到的(de)(de)情況,影(ying)響到工(gong)(gong)程的(de)(de)施(shi)工(gong)(gong)進度(du)或是(shi)(shi)施(shi)工(gong)(gong)質(zhi)量。雖然(ran)科技(ji)進步的(de)(de)速度(du)越來(lai)越快,建(jian)筑施(shi)工(gong)(gong)的(de)(de)技(ji)術(shu)也是(shi)(shi)不斷(duan)提高,但是(shi)(shi)建(jian)筑危(wei)機卻從來(lai)沒(mei)有杜絕過。一旦疏忽大(da)意(yi),就會(hui)對(dui)財(cai)產(chan),乃至生(sheng)命造成(cheng)重(zhong)大(da)損(sun)失。所在(zai),要(yao)在(zai)施(shi)工(gong)(gong)建(jian)設(she)工(gong)(gong)作中提高危(wei)機意(yi)識(shi),做好(hao)危(wei)機項目管理(li)工(gong)(gong)作,保證(zheng)施(shi)工(gong)(gong)安(an)全(quan)有序的(de)(de)進行。

1 建筑施工項目危機管理的(de)主(zhu)要內容

從一(yi)般情況來(lai)看,建(jian)(jian)筑施工(gong)項目實在一(yi)定(ding)的(de)環境和條件的(de)約(yue)束下,進行的(de)建(jian)(jian)筑施工(gong)過(guo)程。建(jian)(jian)筑施工(gong)項目一(yi)般有建(jian)(jian)設方(fang)發起,并對(dui)目的(de)、資源進行整合(he),再交給施工(gong)單位按(an)照設計(ji)好的(de)方(fang)案進行建(jian)(jian)設。

在施(shi)工(gong)(gong)(gong)建(jian)設(she)過程中(zhong)(zhong),我們(men)一般把一些(xie)(xie)(xie)不能提前確定(ding)的(de)(de)(de)(de)(de)(de)因(yin)素定(ding)義為(wei)(wei)“風險因(yin)素”。如果(guo)(guo)對(dui)這些(xie)(xie)(xie)因(yin)素缺乏(fa)足夠的(de)(de)(de)(de)(de)(de)重視,任其(qi)繼續(xu)發(fa)展(zhan)下去,并產(chan)(chan)生了(le)一定(ding)的(de)(de)(de)(de)(de)(de)不良后果(guo)(guo),我們(men)就(jiu)把它定(ding)義為(wei)(wei)“風險損失(shi)”。這就(jiu)是說,如果(guo)(guo)對(dui)于工(gong)(gong)(gong)程隱患(huan)缺乏(fa)應對(dui)措(cuo)施(shi),就(jiu)有可能成(cheng)(cheng)為(wei)(wei)發(fa)展(zhan)為(wei)(wei)日后的(de)(de)(de)(de)(de)(de)危機。本文(wen)中(zhong)(zhong)所(suo)指(zhi)的(de)(de)(de)(de)(de)(de)建(jian)筑(zhu)(zhu)施(shi)工(gong)(gong)(gong)項目危機,主要(yao)是指(zhi)建(jian)筑(zhu)(zhu)施(shi)工(gong)(gong)(gong)項目中(zhong)(zhong)出現(xian)的(de)(de)(de)(de)(de)(de)危險未得到及時(shi)和(he)妥(tuo)善(shan)的(de)(de)(de)(de)(de)(de)處理,逐(zhu)步發(fa)展(zhan)成(cheng)(cheng)的(de)(de)(de)(de)(de)(de)危機,其(qi)中(zhong)(zhong)主要(yao)包含兩種情況:1、一些(xie)(xie)(xie)不可抗力對(dui)建(jian)筑(zhu)(zhu)施(shi)工(gong)(gong)(gong)項目所(suo)產(chan)(chan)生的(de)(de)(de)(de)(de)(de)負(fu)面(mian)影(ying)響(xiang),其(qi)主要(yao)包括(kuo)自然(ran)災害、政治(zhi)變動等突況,在事前難(nan)以(yi)預測(ce),且發(fa)生后短(duan)時(shi)間內(nei)難(nan)以(yi)形成(cheng)(cheng)有效的(de)(de)(de)(de)(de)(de)應對(dui)措(cuo)施(shi);2、由于建(jian)筑(zhu)(zhu)施(shi)工(gong)(gong)(gong)本省造成(cheng)(cheng)的(de)(de)(de)(de)(de)(de)重大影(ying)響(xiang),并對(dui)項目的(de)(de)(de)(de)(de)(de)進度、質量產(chan)(chan)生了(le)破壞(huai)(huai)。如重大工(gong)(gong)(gong)程失(shi)誤(wu),不但影(ying)響(xiang)系施(shi)工(gong)(gong)(gong)建(jian)筑(zhu)(zhu)項目本身(shen),也(ye)會(hui)對(dui)周(zhou)圍的(de)(de)(de)(de)(de)(de)事物產(chan)(chan)生較大的(de)(de)(de)(de)(de)(de)破壞(huai)(huai)。

通(tong)過分(fen)析上述定義,我(wo)們(men)不難發(fa)現風(feng)(feng)險與危機(ji)的(de)一些內在(zai)聯系:首先,建(jian)筑施(shi)工項(xiang)目存在(zai)的(de)風(feng)(feng)險是(shi)導致危機(ji)的(de)根源,危機(ji)是(shi)風(feng)(feng)險帶來的(de)嚴(yan)重(zhong)后果;其次,并不是(shi)所有的(de)建(jian)筑施(shi)工項(xiang)目風(feng)(feng)險都會演變成危機(ji),只有一部分(fen)風(feng)(feng)險在(zai)特定的(de)情況下(xia),才(cai)會逐步(bu)惡(e)化,達到危機(ji)的(de)標準,對建(jian)筑施(shi)工項(xiang)目產(chan)生危害,影響項(xiang)目的(de)正(zheng)常進行(xing)。

建筑施(shi)(shi)(shi)工項(xiang)目(mu)危(wei)機的出現(xian)不但會影(ying)響項(xiang)目(mu)進(jin)度和質量(liang),還會產生一系列的負面影(ying)響。建筑施(shi)(shi)(shi)工項(xiang)目(mu)危(wei)機發生都是(shi)由(you)風(feng)險開始,有小到(dao)到(dao),由(you)局部到(dao)整體,慢慢發展(zhan)到(dao)失控狀(zhuang)態。建筑施(shi)(shi)(shi)工項(xiang)目(mu)危(wei)機直接(jie)表現(xian)為造成(cheng)的直接(jie)和間(jian)接(jie)經濟(ji)損失,并影(ying)響了施(shi)(shi)(shi)工方(fang)人(ren)員的工作(zuo)信心及(ji)士氣。

建(jian)筑施(shi)工(gong)(gong)項(xiang)目(mu)(mu)危(wei)(wei)(wei)機(ji)的(de)(de)(de)(de)(de)(de)直接(jie)表(biao)現為資(zi)金、人(ren)力、物(wu)力的(de)(de)(de)(de)(de)(de)浪費,投入的(de)(de)(de)(de)(de)(de)資(zi)源(yuan)沒有得到相應的(de)(de)(de)(de)(de)(de)回報。施(shi)工(gong)(gong)過程中涉及的(de)(de)(de)(de)(de)(de)的(de)(de)(de)(de)(de)(de)因素眾多,建(jian)筑結(jie)構負責,牽(qian)涉的(de)(de)(de)(de)(de)(de)人(ren)員多,并(bing)且一些潛在的(de)(de)(de)(de)(de)(de)危(wei)(wei)(wei)機(ji)得不到相應的(de)(de)(de)(de)(de)(de)重視(shi),容易造成建(jian)筑施(shi)工(gong)(gong)項(xiang)目(mu)(mu)危(wei)(wei)(wei)機(ji);建(jian)筑施(shi)工(gong)(gong)項(xiang)目(mu)(mu)危(wei)(wei)(wei)機(ji)的(de)(de)(de)(de)(de)(de)間接(jie)影(ying)響(xiang)力也(ye)不容忽(hu)視(shi),它會對施(shi)工(gong)(gong)人(ren)員的(de)(de)(de)(de)(de)(de)信心造成嚴重的(de)(de)(de)(de)(de)(de)打(da)擊,并(bing)在心理留下里(li)陰影(ying),嚴重影(ying)響(xiang)接(jie)下來(lai)的(de)(de)(de)(de)(de)(de)工(gong)(gong)作(zuo),這(zhe)部(bu)分損(sun)失是沒法(fa)估量的(de)(de)(de)(de)(de)(de),也(ye)是經(jing)濟(ji)上無法(fa)進行(xing)彌補的(de)(de)(de)(de)(de)(de)。施(shi)工(gong)(gong)人(ren)員會在危(wei)(wei)(wei)機(ji)發生后出現煩(fan)躁、心情低沉等癥狀,并(bing)逐漸降低對于建(jian)筑施(shi)工(gong)(gong)項(xiang)目(mu)(mu)的(de)(de)(de)(de)(de)(de)安全感(gan)和信任感(gan),甚至(zhi)部(bu)分人(ren)員的(de)(de)(de)(de)(de)(de)世界(jie)觀(guan)、價值觀(guan)也(ye)會隨著危(wei)(wei)(wei)機(ji)的(de)(de)(de)(de)(de)(de)產生而發生變化。

2 建筑施(shi)工項目危(wei)機的防范措施(shi)

2.1、建筑(zhu)施工(gong)項目危機意(yi)識(shi)的樹立

由(you)于(yu)建(jian)(jian)筑施工(gong)(gong)(gong)項(xiang)目的(de)(de)(de)(de)不(bu)確定(ding)因(yin)素較(jiao)(jiao)多(duo),產生的(de)(de)(de)(de)影響范圍(wei)較(jiao)(jiao)大,因(yin)此(ci)施工(gong)(gong)(gong)過程中所有(you)(you)人員都應該提高(gao)警惕,樹立起(qi)高(gao)度的(de)(de)(de)(de)危(wei)機意識(shi),尤其是(shi)那些(xie)位置距(ju)離城市較(jiao)(jiao)遠的(de)(de)(de)(de)建(jian)(jian)筑施工(gong)(gong)(gong)項(xiang)目。由(you)于(yu)施工(gong)(gong)(gong)人員的(de)(de)(de)(de)輕視(shi),對建(jian)(jian)筑施工(gong)(gong)(gong)項(xiang)目管(guan)理(li)工(gong)(gong)(gong)作(zuo)的(de)(de)(de)(de)認識(shi)不(bu)深,僅對其危(wei)害性(xing)有(you)(you)一(yi)定(ding)的(de)(de)(de)(de)了(le)解,并具有(you)(you)一(yi)定(ding)的(de)(de)(de)(de)懼怕心理(li)。因(yin)此(ci),要加強建(jian)(jian)筑施工(gong)(gong)(gong)人員的(de)(de)(de)(de)危(wei)機意識(shi),這一(yi)點在一(yi)些(xie)危(wei)險系數較(jiao)(jiao)高(gao)的(de)(de)(de)(de)建(jian)(jian)筑施工(gong)(gong)(gong)中已經得到(dao)了(le)體現。

在(zai)施工單位,可(ke)以(yi)采用一些簡(jian)單有效的(de)(de)(de)形(xing)式,來(lai)提高工人的(de)(de)(de)危機意(yi)(yi)識(shi),如設(she)置簡(jian)單的(de)(de)(de)警告牌、進行(xing)定(ding)期的(de)(de)(de)安(an)全意(yi)(yi)識(shi)培訓,并對一些建筑工程中出現(xian)的(de)(de)(de)危機進行(xing)宣傳,引起人們的(de)(de)(de)注(zhu)意(yi)(yi)。

2.2、建筑(zhu)施工項目危機(ji)預防(fang)措(cuo)施

完善(shan)建(jian)(jian)筑施(shi)(shi)工(gong)項(xiang)目的(de)(de)(de)(de)(de)危(wei)機(ji)管理(li)(li),可(ke)以從以下幾(ji)點出(chu)發(fa):1、建(jian)(jian)立(li)健全組織規(gui)范(fan)。一個良好(hao)(hao)的(de)(de)(de)(de)(de)組織規(gui)范(fan)的(de)(de)(de)(de)(de)重要(yao)性已經得到了施(shi)(shi)工(gong)單位的(de)(de)(de)(de)(de)普遍認可(ke),是對(dui)人員進行管理(li)(li)最為有效的(de)(de)(de)(de)(de)手段之(zhi)一,也是進行危(wei)機(ji)防范(fan)工(gong)作(zuo)的(de)(de)(de)(de)(de)前提條件(jian);2、建(jian)(jian)立(li)有效的(de)(de)(de)(de)(de)溝通機(ji)制(zhi)。一般危(wei)機(ji)的(de)(de)(de)(de)(de)產生,都(dou)(dou)是由于(yu)信(xin)息的(de)(de)(de)(de)(de)傳遞環(huan)節出(chu)現(xian)了問題(ti),信(xin)息傳遞之(zhi)后或(huo)是過(guo)程(cheng)中(zhong)出(chu)現(xian)偏差,都(dou)(dou)會影響(xiang)人們做及時(shi)(shi)、準確的(de)(de)(de)(de)(de)判斷(duan),一個良好(hao)(hao)的(de)(de)(de)(de)(de)溝通機(ji)制(zhi),可(ke)以有效的(de)(de)(de)(de)(de)預(yu)防建(jian)(jian)筑施(shi)(shi)工(gong)項(xiang)目危(wei)機(ji)的(de)(de)(de)(de)(de)出(chu)現(xian);3、及時(shi)(shi)處理(li)(li)項(xiang)目過(guo)程(cheng)中(zhong)出(chu)現(xian)的(de)(de)(de)(de)(de)隱(yin)(yin)患。建(jian)(jian)筑項(xiang)目危(wei)機(ji)的(de)(de)(de)(de)(de)出(chu)現(xian)往(wang)(wang)往(wang)(wang)需要(yao)一個較長(chang)的(de)(de)(de)(de)(de)發(fa)展過(guo)程(cheng),所以應該及時(shi)(shi)采取(qu)措(cuo)施(shi)(shi),消(xiao)除(chu)施(shi)(shi)工(gong)中(zhong)的(de)(de)(de)(de)(de)隱(yin)(yin)患,建(jian)(jian)立(li)其良好(hao)(hao)的(de)(de)(de)(de)(de)應急機(ji)制(zhi),將危(wei)機(ji)消(xiao)除(chu)在萌芽階段。

3 建筑施工項(xiang)目危機的(de)應對(dui)策(ce)略

在施工(gong)過程中(zhong),要做好項(xiang)目的危機管理工(gong)作。當(dang)項(xiang)目危機出(chu)現(xian)時,可以(yi)采(cai)取一(yi)下的措施:

1、建(jian)筑施工項目的危機(ji)應(ying)(ying)急狀(zhuang)態分級(ji)。各種防范手段(duan)可以降低危機(ji)發生(sheng)的概率(lv),但是一(yi)旦由(you)于某些客(ke)觀因素,導致了危機(ji)的發生(sheng),就應(ying)(ying)該采取相(xiang)應(ying)(ying)的補(bu)救措施。當危機(ji)發生(sheng)時,應(ying)(ying)該根據發生(sheng)的規模、影響(xiang)范圍的大小對(dui)其進行(xing)分類,并采取相(xiang)應(ying)(ying)級(ji)別的補(bu)救措施。

2、制定建(jian)筑施(shi)工(gong)(gong)項(xiang)目的(de)危(wei)機(ji)(ji)應對計劃。有備無患,建(jian)筑施(shi)工(gong)(gong)單(dan)位應在(zai)(zai)施(shi)工(gong)(gong)危(wei)機(ji)(ji)發(fa)生(sheng)前,做好發(fa)生(sheng)各種危(wei)機(ji)(ji)的(de)應對計劃,才能(neng)在(zai)(zai)危(wei)機(ji)(ji)來臨(lin)時(shi)及時(shi)的(de)采取有效(xiao)措(cuo)施(shi),防止影響范圍進一步擴大。制定的(de)應急計劃應該(gai)有彈性、實用(yong)性和可操作性,能(neng)夠在(zai)(zai)危(wei)機(ji)(ji)救(jiu)援中(zhong)發(fa)揮(hui)預期作用(yong)。

3、建筑施工(gong)項目危(wei)(wei)(wei)機(ji)(ji)應(ying)對(dui)(dui)的(de)(de)一般管理(li)。為了保(bao)證(zheng)危(wei)(wei)(wei)機(ji)(ji)應(ying)對(dui)(dui)速度和質量(liang),建筑單位(wei)(wei)需(xu)要遵循以下(xia)幾點原則(ze):1、定期(qi)對(dui)(dui)員工(gong)進行工(gong)程危(wei)(wei)(wei)機(ji)(ji)培(pei)訓,可以采取講座或(huo)是演習(xi)的(de)(de)形式;2、必須建立快速有效的(de)(de)應(ying)對(dui)(dui)機(ji)(ji)制,在危(wei)(wei)(wei)機(ji)(ji)發(fa)生的(de)(de)第一時(shi)間進行搶(qiang)(qiang)救(jiu)(jiu)工(gong)作;3、以全(quan)(quan)(quan)局(ju)(ju)為重(zhong),當局(ju)(ju)部利(li)益和全(quan)(quan)(quan)局(ju)(ju)利(li)益發(fa)生沖(chong)突(tu)時(shi),要是全(quan)(quan)(quan)局(ju)(ju)為重(zhong)。公眾的(de)(de)利(li)益要放在首位(wei)(wei),不(bu)能為了自(zi)身企業(ye)的(de)(de)利(li)益,影響(xiang)到周圍群眾的(de)(de)利(li)益;4、堅持以人(ren)為本的(de)(de)原則(ze),在危(wei)(wei)(wei)機(ji)(ji)搶(qiang)(qiang)救(jiu)(jiu)過程中要優先考(kao)慮生命安(an)全(quan)(quan)(quan),而不(bu)是財產安(an)全(quan)(quan)(quan),并且項目組織不(bu)能夠只顧(gu)(gu)及(ji)自(zi)身的(de)(de)利(li)益,棄他人(ren)安(an)危(wei)(wei)(wei)于不(bu)顧(gu)(gu)。

參考文獻

篇4

中(zhong)(zhong)國經(jing)濟的(de)(de)發(fa)展改(gai)變了(le)人(ren)(ren)們(men)對(dui)(dui)于交(jiao)通(tong)(tong)工(gong)(gong)具的(de)(de)認識,之前(qian)人(ren)(ren)們(men)所不(bu)敢奢望(wang)的(de)(de)飛(fei)(fei)機(ji)(ji)(ji)已經(jing)開始步入(ru)到人(ren)(ren)們(men)的(de)(de)生(sheng)活(huo)中(zhong)(zhong),并(bing)成為人(ren)(ren)們(men)主要的(de)(de)交(jiao)通(tong)(tong)工(gong)(gong)具之一(yi),給(gei)人(ren)(ren)們(men)的(de)(de)生(sheng)活(huo)帶來便捷。也(ye)正因為飛(fei)(fei)機(ji)(ji)(ji)在人(ren)(ren)們(men)生(sheng)活(huo)中(zhong)(zhong)重要程度(du)(du)的(de)(de)上升(sheng),使(shi)得其安全性(xing)和(he)舒(shu)(shu)適(shi)性(xing)也(ye)開始被人(ren)(ren)們(men)所關(guan)注。對(dui)(dui)飛(fei)(fei)機(ji)(ji)(ji)進(jin)行維修(xiu)(xiu)(xiu)和(he)護(hu)理(li)(li),能夠讓(rang)飛(fei)(fei)機(ji)(ji)(ji)更(geng)好的(de)(de)飛(fei)(fei)行,保證飛(fei)(fei)機(ji)(ji)(ji)運行過程中(zhong)(zhong)的(de)(de)安全,帶給(gei)人(ren)(ren)們(men)舒(shu)(shu)適(shi)的(de)(de)感受。但是,就目(mu)前(qian)情(qing)況來說,對(dui)(dui)飛(fei)(fei)機(ji)(ji)(ji)進(jin)行維修(xiu)(xiu)(xiu)和(he)護(hu)理(li)(li)是一(yi)項非常復(fu)雜的(de)(de)工(gong)(gong)程,其難度(du)(du)系數大(da)、技(ji)術難度(du)(du)大(da)、維修(xiu)(xiu)(xiu)成本費用高,對(dui)(dui)飛(fei)(fei)機(ji)(ji)(ji)維修(xiu)(xiu)(xiu)質量(liang)的(de)(de)提升(sheng)造成了(le)一(yi)定(ding)的(de)(de)困難。如何(he)實現飛(fei)(fei)機(ji)(ji)(ji)維修(xiu)(xiu)(xiu)的(de)(de)高效率、高質量(liang)、低成本,已經(jing)成為航(hang)天企業發(fa)展的(de)(de)一(yi)個重要探(tan)索的(de)(de)方向。飛(fei)(fei)機(ji)(ji)(ji)維修(xiu)(xiu)(xiu)中(zhong)(zhong)的(de)(de)項目(mu)管(guan)理(li)(li)方式在此背景(jing)下(xia)應運而出,其雖然在實行中(zhong)(zhong)還(huan)存在一(yi)些(xie)問題,但是對(dui)(dui)機(ji)(ji)(ji)的(de)(de)維修(xiu)(xiu)(xiu)發(fa)展來說打(da)開了(le)一(yi)扇窗(chuang)戶(hu),讓(rang)飛(fei)(fei)機(ji)(ji)(ji)的(de)(de)維修(xiu)(xiu)(xiu)能夠獲得更(geng)好的(de)(de)發(fa)展和(he)進(jin)步。

一、飛(fei)機維修企(qi)業(ye)引入項目管理(li)方法的重要意義(yi)

飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)企業(ye)(ye)運用傳統的(de)(de)(de)飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)模式已(yi)經難以(yi)適應當前(qian)的(de)(de)(de)市場需要,難以(yi)應對(dui)形勢的(de)(de)(de)要求(qiu)。而引(yin)(yin)入(ru)項(xiang)(xiang)(xiang)目管(guan)理(li)(li)的(de)(de)(de)方(fang)法進行(xing)飛機(ji)維(wei)(wei)(wei)(wei)修(xiu),能(neng)(neng)夠很好(hao)地(di)對(dui)企業(ye)(ye)管(guan)理(li)(li)模式進行(xing)創(chuang)新,讓企業(ye)(ye)更(geng)加(jia)具(ju)有活力和(he)生命力,也(ye)讓企業(ye)(ye)在(zai)(zai)(zai)(zai)市場發展中(zhong)能(neng)(neng)夠占有一席之(zhi)地(di),提高飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)的(de)(de)(de)質量(liang)和(he)效率(lv)。首先,飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)企業(ye)(ye)引(yin)(yin)入(ru)項(xiang)(xiang)(xiang)目管(guan)理(li)(li)方(fang)法能(neng)(neng)夠很好(hao)地(di)對(dui)每(mei)架飛機(ji)挺長期間(jian)(jian)(jian)的(de)(de)(de)工(gong)(gong)(gong)作(zuo)(zuo)(zuo)流(liu)程(cheng)(cheng)進行(xing)計劃(hua),對(dui)于人力成本予(yu)以(yi)節約,讓維(wei)(wei)(wei)(wei)修(xiu)工(gong)(gong)(gong)作(zuo)(zuo)(zuo)真正做(zuo)到有“針對(dui)性”,讓每(mei)架飛機(ji)在(zai)(zai)(zai)(zai)維(wei)(wei)(wei)(wei)修(xiu)中(zhong)能(neng)(neng)夠獲(huo)得最專(zhuan)業(ye)(ye)的(de)(de)(de)“服務”,從(cong)(cong)而提高飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)的(de)(de)(de)質量(liang),提高工(gong)(gong)(gong)作(zuo)(zuo)(zuo)的(de)(de)(de)進度(du)。其次(ci),飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)企業(ye)(ye)引(yin)(yin)入(ru)項(xiang)(xiang)(xiang)目管(guan)理(li)(li)方(fang)法能(neng)(neng)夠對(dui)于所需要的(de)(de)(de)器材(cai)和(he)配件(jian)進行(xing)提前(qian)訂購,防止在(zai)(zai)(zai)(zai)維(wei)(wei)(wei)(wei)修(xiu)工(gong)(gong)(gong)程(cheng)(cheng)中(zhong)出(chu)現器材(cai)或者配件(jian)不足(zu)的(de)(de)(de)情況(kuang),防止維(wei)(wei)(wei)(wei)修(xiu)工(gong)(gong)(gong)作(zuo)(zuo)(zuo)進度(du)的(de)(de)(de)停滯,也(ye)能(neng)(neng)夠防止很多配件(jian)在(zai)(zai)(zai)(zai)訂購過(guo)程(cheng)(cheng)中(zhong)出(chu)現錯誤。第三,飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)企業(ye)(ye)引(yin)(yin)入(ru)項(xiang)(xiang)(xiang)目管(guan)理(li)(li)的(de)(de)(de)方(fang)法能(neng)(neng)夠促進各個部門之(zhi)間(jian)(jian)(jian)的(de)(de)(de)交(jiao)流(liu)和(he)溝通,督促從(cong)(cong)飛機(ji)拆(chai)件(jian)檢查階段(duan)(duan)到裝件(jian)功能(neng)(neng)試驗稱重試飛階段(duan)(duan)各個不同工(gong)(gong)(gong)種機(ji)械人員(yuan)(yuan)的(de)(de)(de)配合和(he)合作(zuo)(zuo)(zuo),提高工(gong)(gong)(gong)作(zuo)(zuo)(zuo)效率(lv),促進員(yuan)(yuan)工(gong)(gong)(gong)之(zhi)間(jian)(jian)(jian)的(de)(de)(de)協同合作(zuo)(zuo)(zuo)。同時(shi),項(xiang)(xiang)(xiang)目管(guan)理(li)(li)方(fang)法對(dui)于責任(ren)的(de)(de)(de)劃(hua)分更(geng)加(jia)明(ming)晰,可(ke)以(yi)保(bao)證(zheng)責任(ren)人責任(ren)的(de)(de)(de)承(cheng)擔和(he)落實。第四,飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)企業(ye)(ye)引(yin)(yin)入(ru)項(xiang)(xiang)(xiang)目管(guan)理(li)(li)的(de)(de)(de)方(fang)法能(neng)(neng)夠有效控制(zhi)飛機(ji)維(wei)(wei)(wei)(wei)修(xiu)的(de)(de)(de)成本支(zhi)出(chu),能(neng)(neng)夠最大化地(di)提高公司的(de)(de)(de)利潤空間(jian)(jian)(jian),讓公司獲(huo)得更(geng)大的(de)(de)(de)發展空間(jian)(jian)(jian)和(he)機(ji)會。

二(er)、傳統維修(xiu)模式中存(cun)在(zai)的問題

1維修工時的估算不確(que)定性

傳(chuan)統(tong)的(de)飛(fei)機維(wei)(wei)修(xiu)(xiu)方(fang)(fang)法對(dui)(dui)于維(wei)(wei)修(xiu)(xiu)工(gong)時(shi)方(fang)(fang)面(mian)具(ju)有(you)(you)很大的(de)不(bu)確定性(xing)。其(qi)所采用的(de)方(fang)(fang)法被稱為“專家法”,只能(neng)對(dui)(dui)維(wei)(wei)修(xiu)(xiu)工(gong)時(shi)進(jin)行估算。而(er)在(zai)對(dui)(dui)飛(fei)機維(wei)(wei)修(xiu)(xiu)的(de)過程(cheng)中一(yi)旦發現飛(fei)機其(qi)他(ta)的(de)缺陷(xian),或(huo)者其(qi)他(ta)問(wen)題時(shi),則(ze)需要對(dui)(dui)維(wei)(wei)修(xiu)(xiu)工(gong)時(shi)進(jin)行重新計算。傳(chuan)統(tong)維(wei)(wei)修(xiu)(xiu)方(fang)(fang)法的(de)維(wei)(wei)修(xiu)(xiu)工(gong)時(shi)更多的(de)是依靠具(ju)有(you)(you)維(wei)(wei)修(xiu)(xiu)工(gong)藝的(de)員(yuan)工(gong)、質保(bao)人(ren)員(yuan)依據施(shi)工(gong)工(gong)藝或(huo)者圖紙等(deng)技術文件(jian)對(dui)(dui)維(wei)(wei)修(xiu)(xiu)所需要的(de)設備性(xing)能(neng)、航材特性(xing)等(deng)內(nei)容,憑借經驗進(jin)行的(de)估算,本身就具(ju)有(you)(you)很大的(de)伸縮性(xing)。并(bing)且,傳(chuan)統(tong)飛(fei)機維(wei)(wei)修(xiu)(xiu)方(fang)(fang)法因(yin)為人(ren)員(yuan)技能(neng)、經驗等(deng)方(fang)(fang)面(mian)的(de)不(bu)同(tong)也會產生(sheng)不(bu)同(tong)的(de)維(wei)(wei)修(xiu)(xiu)工(gong)時(shi)效果。

2生(sheng)產進度中工(gong)作流(liu)程圖的依賴(lai)性

傳(chuan)統(tong)的(de)飛(fei)機(ji)(ji)維(wei)修模式更多(duo)的(de)是依(yi)靠工(gong)(gong)(gong)(gong)作(zuo)流(liu)程(cheng)圖(tu)(tu)進行維(wei)修,對于維(wei)修進度的(de)把控(kong)也是依(yi)照工(gong)(gong)(gong)(gong)作(zuo)流(liu)程(cheng)圖(tu)(tu),這就(jiu)(jiu)造成(cheng)很多(duo)工(gong)(gong)(gong)(gong)作(zuo)人(ren)(ren)員(yuan)因(yin)為工(gong)(gong)(gong)(gong)作(zuo)流(liu)程(cheng)圖(tu)(tu)的(de)應(ying)用而(er)產生“按部就(jiu)(jiu)班、不思創新、以完成(cheng)工(gong)(gong)(gong)(gong)作(zuo)量(liang)(liang)為主要(yao)工(gong)(gong)(gong)(gong)作(zuo)內(nei)容”的(de)思想。很多(duo)工(gong)(gong)(gong)(gong)作(zuo)人(ren)(ren)員(yuan)在(zai)工(gong)(gong)(gong)(gong)作(zuo)中(zhong)如果沒(mei)有完成(cheng)流(liu)程(cheng)圖(tu)(tu)安排的(de)工(gong)(gong)(gong)(gong)作(zuo),就(jiu)(jiu)會(hui)(hui)進行趕(gan)工(gong)(gong)(gong)(gong),這樣導致(zhi)(zhi)飛(fei)機(ji)(ji)維(wei)修的(de)品質下降,嚴(yan)重的(de)情況下還會(hui)(hui)造成(cheng)飛(fei)機(ji)(ji)運行中(zhong)質量(liang)(liang)問題頻發(fa)(fa),極易導致(zhi)(zhi)飛(fei)機(ji)(ji)事故的(de)發(fa)(fa)生。也正(zheng)因(yin)為維(wei)修中(zhong)對于工(gong)(gong)(gong)(gong)作(zuo)流(liu)程(cheng)圖(tu)(tu)的(de)依(yi)賴(lai),經(jing)常會(hui)(hui)造成(cheng)飛(fei)機(ji)(ji)延(yan)誤的(de)情況,引起人(ren)(ren)們極大不滿。

3生產(chan)作業的控(kong)制缺乏彈性

在飛(fei)機的(de)(de)維(wei)(wei)修(xiu)中,如果飛(fei)機停場(chang)時間(jian)太長就(jiu)會(hui)導(dao)致工作安排過于緊密,這樣給飛(fei)機維(wei)(wei)修(xiu)預(yu)留的(de)(de)彈性時間(jian)就(jiu)會(hui)減少。一(yi)(yi)旦(dan)發生預(yu)期范(fan)圍外的(de)(de)事情(qing),就(jiu)會(hui)造(zao)成(cheng)延(yan)后(hou)的(de)(de)連鎖反應。并且,很(hen)多飛(fei)機公司在機庫的(de)(de)安排中時間(jian)都非常緊張,需要在前一(yi)(yi)飛(fei)機出(chu)(chu)廠(chang)之(zhi)后(hou),后(hou)一(yi)(yi)飛(fei)機就(jiu)進(jin)場(chang)。這樣就(jiu)造(zao)成(cheng)一(yi)(yi)架飛(fei)機維(wei)(wei)修(xiu)出(chu)(chu)現(xian)延(yan)誤,之(zhi)后(hou)的(de)(de)飛(fei)機維(wei)(wei)修(xiu)都會(hui)出(chu)(chu)現(xian)延(yan)誤,不僅給飛(fei)機的(de)(de)機庫使用情(qing)況造(zao)成(cheng)妨礙,也無法保證(zheng)飛(fei)機維(wei)(wei)修(xiu)的(de)(de)質量。

4航材計劃缺(que)乏科學性

對于航(hang)(hang)材所進行(xing)的(de)(de)訂(ding)貨(huo)(huo),一(yi)般都是(shi)由計劃部門(men)從維修基地或者廠家進行(xing)信息收集之后下訂(ding)單進行(xing)訂(ding)貨(huo)(huo)。也(ye)就是(shi)說,航(hang)(hang)材的(de)(de)訂(ding)貨(huo)(huo)并(bing)不是(shi)一(yi)蹴而就的(de)(de),其需要一(yi)定的(de)(de)計劃性,需要一(yi)定時間的(de)(de)延遲。在飛機實際維修中常常會出(chu)(chu)現一(yi)種情況(kuang),那就是(shi)很多(duo)(duo)耗材采購量較大,能夠(gou)使用多(duo)(duo)年,而另一(yi)部分耗材則出(chu)(chu)現“供不應求”現象,無(wu)法滿足維修的(de)(de)需要。一(yi)部分飛機維修企(qi)業甚至(zhi)還出(chu)(chu)現飛機即將(jiang)出(chu)(chu)廠但是(shi)很多(duo)(duo)缺貨(huo)(huo)清單還沒有解(jie)決的(de)(de)情況(kuang)。

三、項目(mu)管理在飛機維修工(gong)程中應用(yong)的改(gai)進措施

1項(xiang)目計劃中維修(xiu)工時的(de)精確計算

維修(xiu)(xiu)(xiu)(xiu)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)決定了維修(xiu)(xiu)(xiu)(xiu)飛機所花費的(de)(de)(de)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)和金錢,是(shi)客(ke)(ke)戶(hu)非(fei)常看重的(de)(de)(de)一個重要方面。因此(ci)(ci),提高維修(xiu)(xiu)(xiu)(xiu)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)的(de)(de)(de)精(jing)準(zhun)度就顯得非(fei)常重要。這不僅成為(wei)(wei)客(ke)(ke)戶(hu)選擇維修(xiu)(xiu)(xiu)(xiu)企(qi)業的(de)(de)(de)一個重要標準(zhun),也是(shi)客(ke)(ke)戶(hu)對(dui)維修(xiu)(xiu)(xiu)(xiu)情況印象(xiang)的(de)(de)(de)一個重要影響因素(su)。筆者(zhe)認(ren)為(wei)(wei),在進(jin)行項目管理方法應用中,可以對(dui)維修(xiu)(xiu)(xiu)(xiu)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)精(jing)確性采用三(san)點時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)估算(suan)法。其所運用的(de)(de)(de)公式(shi)為(wei)(wei)P=M+λ×σ。此(ci)(ci)處(chu)的(de)(de)(de)P代(dai)表(biao)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi),M代(dai)表(biao)平均工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi),λ代(dai)表(biao)比準(zhun)偏(pian)差系數(shu),σ代(dai)表(biao)標準(zhun)偏(pian)差。平均工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)M的(de)(de)(de)計(ji)算(suan)公式(shi)為(wei)(wei)M=(a+4c+b)/6。此(ci)(ci)處(chu)的(de)(de)(de)a代(dai)表(biao)工(gong)(gong)(gong)(gong)作(zuo)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)的(de)(de)(de)樂觀時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian),b代(dai)表(biao)工(gong)(gong)(gong)(gong)作(zuo)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)的(de)(de)(de)悲(bei)觀時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian),c代(dai)表(biao)工(gong)(gong)(gong)(gong)作(zuo)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)的(de)(de)(de)最可能時(shi)(shi)(shi)(shi)(shi)(shi)(shi)間(jian)。σ的(de)(de)(de)計(ji)算(suan)公式(shi)為(wei)(wei)σ2=[(b-a)/6]2。采用此(ci)(ci)公式(shi)能夠很好地對(dui)維修(xiu)(xiu)(xiu)(xiu)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)進(jin)行計(ji)算(suan),保(bao)證維修(xiu)(xiu)(xiu)(xiu)工(gong)(gong)(gong)(gong)時(shi)(shi)(shi)(shi)(shi)(shi)(shi)的(de)(de)(de)準(zhun)確性。

2基于原項目作業計劃的(de)時間優化方案

時間的(de)(de)(de)(de)優(you)化是在現(xian)(xian)有的(de)(de)(de)(de)人(ren)(ren)力、物力、財力基礎上所(suo)(suo)進(jin)行(xing)的(de)(de)(de)(de)工(gong)期(qi)的(de)(de)(de)(de)優(you)化,其(qi)能(neng)(neng)夠滿足維(wei)修(xiu)工(gong)期(qi)對(dui)于客戶的(de)(de)(de)(de)需(xu)要(yao),提高企業(ye)(ye)的(de)(de)(de)(de)競爭力。其(qi)所(suo)(suo)實(shi)現(xian)(xian)的(de)(de)(de)(de)途(tu)徑包括對(dui)作(zuo)(zuo)業(ye)(ye)分解(jie)(jie)和關(guan)(guan)鍵(jian)作(zuo)(zuo)業(ye)(ye)效(xiao)率的(de)(de)(de)(de)提高兩方面(mian)(mian)。針對(dui)作(zuo)(zuo)業(ye)(ye)分解(jie)(jie)來說,需(xu)要(yao)在條件允許的(de)(de)(de)(de)情(qing)況下,對(dui)關(guan)(guan)鍵(jian)作(zuo)(zuo)業(ye)(ye)進(jin)行(xing)進(jin)一(yi)步的(de)(de)(de)(de)劃分,對(dui)相(xiang)關(guan)(guan)的(de)(de)(de)(de)人(ren)(ren)力資源(yuan)進(jin)行(xing)優(you)化配(pei)置,讓分解(jie)(jie)后(hou)的(de)(de)(de)(de)作(zuo)(zuo)業(ye)(ye)既能(neng)(neng)夠平行(xing)進(jin)行(xing),又(you)能(neng)(neng)夠進(jin)行(xing)交叉配(pei)合(he),從而最(zui)大(da)化地節約維(wei)修(xiu)工(gong)期(qi)。對(dui)關(guan)(guan)鍵(jian)作(zuo)(zuo)業(ye)(ye)效(xiao)率提高方面(mian)(mian),則可以(yi)采用專(zhuan)人(ren)(ren)負責(ze)的(de)(de)(de)(de)方式進(jin)行(xing)維(wei)修(xiu)環節的(de)(de)(de)(de)管(guan)控,一(yi)方面(mian)(mian)專(zhuan)人(ren)(ren)負責(ze)能(neng)(neng)夠最(zui)大(da)化地提升工(gong)作(zuo)(zuo)人(ren)(ren)員的(de)(de)(de)(de)技術(shu)嫻熟度,另一(yi)方面(mian)(mian)其(qi)所(suo)(suo)進(jin)行(xing)的(de)(de)(de)(de)標準(zhun)化流程工(gong)藝操作(zuo)(zuo)能(neng)(neng)夠對(dui)維(wei)修(xiu)時間予(yu)以(yi)最(zui)優(you)管(guan)控。

3進行質量改進

對(dui)(dui)(dui)維修質量(liang)(liang)予以(yi)(yi)改進(jin)需(xu)(xu)要(yao)(yao)經(jing)歷八個(ge)步(bu)(bu)驟(zou),依次(ci)(ci)為提出問(wen)題、分析問(wen)題、找出原因、制(zhi)定(ding)對(dui)(dui)(dui)策和(he)措施、進(jin)行(xing)計(ji)劃和(he)安排、對(dui)(dui)(dui)結(jie)果進(jin)行(xing)檢查、對(dui)(dui)(dui)經(jing)驗進(jin)行(xing)總(zong)結(jie)、制(zhi)定(ding)相應的(de)(de)制(zhi)度規章等。此八個(ge)步(bu)(bu)驟(zou)可以(yi)(yi)說是循序(xu)漸進(jin)、依次(ci)(ci)進(jin)行(xing)的(de)(de),每一個(ge)步(bu)(bu)驟(zou)都需(xu)(xu)要(yao)(yao)工(gong)(gong)(gong)作(zuo)人員(yuan)認真對(dui)(dui)(dui)待,以(yi)(yi)保證(zheng)每道工(gong)(gong)(gong)序(xu)的(de)(de)順利進(jin)行(xing)。同時,管理人員(yuan)也需(xu)(xu)要(yao)(yao)切實發揮(hui)出應有(you)的(de)(de)責任,對(dui)(dui)(dui)每個(ge)步(bu)(bu)驟(zou)進(jin)行(xing)有(you)效(xiao)(xiao)(xiao)監督(du)考核,保證(zheng)工(gong)(gong)(gong)作(zuo)人員(yuan)對(dui)(dui)(dui)八個(ge)步(bu)(bu)驟(zou)的(de)(de)有(you)效(xiao)(xiao)(xiao)履(lv)行(xing)。此外,企業也要(yao)(yao)對(dui)(dui)(dui)工(gong)(gong)(gong)作(zuo)人員(yuan)進(jin)行(xing)專業化的(de)(de)培訓(xun),讓工(gong)(gong)(gong)作(zuo)人員(yuan)具有(you)更加專業化的(de)(de)態度來對(dui)(dui)(dui)待維修工(gong)(gong)(gong)作(zuo),從而提高(gao)維修的(de)(de)質量(liang)(liang)和(he)效(xiao)(xiao)(xiao)率(lv)。

4維修系統的改進

飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)需要(yao)專(zhuan)業(ye)的(de)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)系(xi)(xi)(xi)統予以配合,只有對(dui)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)系(xi)(xi)(xi)統進(jin)(jin)行(xing)不(bu)斷的(de)改進(jin)(jin),才能(neng)保(bao)證(zheng)(zheng)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)工(gong)作的(de)高(gao)效、高(gao)質。在維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)過程中,可(ke)以引入ERP系(xi)(xi)(xi)統進(jin)(jin)行(xing)飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)項目的(de)管理,其(qi)(qi)能(neng)夠很好地對(dui)企(qi)業(ye)資源進(jin)(jin)行(xing)規(gui)劃,優化企(qi)業(ye)內部增(zeng)值鏈上的(de)各個功能(neng),保(bao)證(zheng)(zheng)其(qi)(qi)系(xi)(xi)(xi)統的(de)整體性(xing)和高(gao)效性(xing)。其(qi)(qi)次,維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)飛(fei)(fei)機(ji)工(gong)藝具有復雜(za)性(xing),企(qi)業(ye)還可(ke)以針對(dui)飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)的(de)特點以及(ji)系(xi)(xi)(xi)統的(de)交互性(xing),開展(zhan)數學(xue)模(mo)型(xing)的(de)建(jian)立,將模(mo)型(xing)應用到維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)系(xi)(xi)(xi)統建(jian)設(she)中,不(bu)斷對(dui)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)系(xi)(xi)(xi)統進(jin)(jin)行(xing)完善。結(jie)語飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)對(dui)機(ji)的(de)運(yun)行(xing)來說極其(qi)(qi)重(zhong)要(yao),無(wu)論(lun)從(cong)政府部門還是從(cong)飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)企(qi)業(ye)自身來說,都(dou)要(yao)對(dui)此(ci)(ci)引起高(gao)度重(zhong)視。因此(ci)(ci),需要(yao)不(bu)斷學(xue)習其(qi)(qi)他國(guo)家或者(zhe)公(gong)司的(de)先進(jin)(jin)經(jing)驗(yan),并將其(qi)(qi)與(yu)公(gong)司實際情(qing)況(kuang)進(jin)(jin)行(xing)有效結(jie)合,促(cu)進(jin)(jin)飛(fei)(fei)機(ji)維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)工(gong)作的(de)開展(zhan),讓維(wei)(wei)(wei)(wei)修(xiu)(xiu)(xiu)(xiu)(xiu)(xiu)工(gong)作為飛(fei)(fei)機(ji)的(de)安全性(xing)能(neng)保(bao)駕(jia)護航。

參考文獻

[1]盧志剛.淺析風險管理在飛機定檢維修中的應用[J].價值工(gong)程,2014(1):147-148.

[2]楊璞(pu).項目管理在飛機(ji)定檢(jian)維修中的應用[J].中國(guo)民用航空(kong),2014(1):60-62.

[3]周大偉(wei).風(feng)險管(guan)理(li)在飛(fei)機定(ding)檢維修中的應(ying)用[J].通訊世界,2015(1):215-216.

[4]劉輝.淺談(tan)飛機維修工程管理系統優化與(yu)成本控制[J].科技風,2013(18):241.

[5]高婕.飛機維修行業(ye)加強項目(mu)成本控(kong)制的思考[J].內江(jiang)科技,2012(5):162-163.

篇5

中圖分類號:TV54 文獻標識碼:A

水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)建設的(de)(de)(de)施工(gong)(gong)(gong)場地和(he)其他的(de)(de)(de)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)不同,它是(shi)在(zai)(zai)水(shui)(shui)下進(jin)行(xing)同時(shi)也是(shi)在(zai)(zai)水(shui)(shui)下存在(zai)(zai)的(de)(de)(de),那么對(dui)此就(jiu)要求施工(gong)(gong)(gong)的(de)(de)(de)質(zhi)(zhi)(zhi)量要有(you)著(zhu)很(hen)高的(de)(de)(de)標(biao)準(zhun),因為(wei)施工(gong)(gong)(gong)后的(de)(de)(de)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)是(shi)在(zai)(zai)水(shui)(shui)下存在(zai)(zai)的(de)(de)(de),在(zai)(zai)對(dui)后期(qi)的(de)(de)(de)維(wei)護上(shang)具有(you)可視化極低的(de)(de)(de)情況(kuang),不是(shi)很(hen)容易能夠(gou)發(fa)現(xian)使用過(guo)(guo)程(cheng)(cheng)(cheng)中(zhong)出現(xian)的(de)(de)(de)質(zhi)(zhi)(zhi)量問(wen)題(ti)(ti)(ti),所(suo)以在(zai)(zai)施工(gong)(gong)(gong)過(guo)(guo)程(cheng)(cheng)(cheng)中(zhong)一定要對(dui)質(zhi)(zhi)(zhi)量有(you)所(suo)控制,不為(wei)后期(qi)的(de)(de)(de)投入(ru)使用造成(cheng)隱患。水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)主要是(shi)應用在(zai)(zai)水(shui)(shui)中(zhong),所(suo)以在(zai)(zai)防(fang)水(shui)(shui)方面有(you)著(zhu)很(hen)高的(de)(de)(de)要求標(biao)準(zhun),那么如(ru)果(guo)發(fa)生滲水(shui)(shui)的(de)(de)(de)現(xian)象,這項工(gong)(gong)(gong)程(cheng)(cheng)(cheng)的(de)(de)(de)質(zhi)(zhi)(zhi)量問(wen)題(ti)(ti)(ti)就(jiu)出現(xian)了(le)(le)(le)很(hen)大(da)的(de)(de)(de)問(wen)題(ti)(ti)(ti),帷幕灌漿(jiang)(jiang)(jiang)技術(shu)就(jiu)是(shi)為(wei)了(le)(le)(le)防(fang)止(zhi)滲水(shui)(shui)情況(kuang)的(de)(de)(de)發(fa)生而(er)采(cai)用的(de)(de)(de)。帷幕灌漿(jiang)(jiang)(jiang)是(shi)在(zai)(zai)對(dui)水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)的(de)(de)(de)底部進(jin)行(xing)施工(gong)(gong)(gong)的(de)(de)(de)時(shi)候,利(li)用鉆頭在(zai)(zai)底部打孔(kong),然后對(dui)鉆孔(kong)進(jin)行(xing)漿(jiang)(jiang)(jiang)液(ye)的(de)(de)(de)灌注,在(zai)(zai)灌注的(de)(de)(de)過(guo)(guo)程(cheng)(cheng)(cheng)中(zhong),鉆孔(kong)內(nei)的(de)(de)(de)水(shui)(shui)由于受到漿(jiang)(jiang)(jiang)液(ye)的(de)(de)(de)壓力而(er)自動排出孔(kong)外(wai),漿(jiang)(jiang)(jiang)液(ye)占(zhan)據了(le)(le)(le)原有(you)的(de)(de)(de)空間,待漿(jiang)(jiang)(jiang)液(ye)徹(che)底占(zhan)滿鉆孔(kong)的(de)(de)(de)時(shi)候,在(zai)(zai)底部進(jin)行(xing)融合形(xing)成(cheng)固(gu)體狀態,這種固(gu)體可以有(you)效(xiao)的(de)(de)(de)進(jin)行(xing)防(fang)水(shui)(shui)。這種技術(shu)已經在(zai)(zai)水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)行(xing)業實行(xing)了(le)(le)(le)很(hen)多年,得到了(le)(le)(le)有(you)力的(de)(de)(de)推廣(guang),可以對(dui)水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)的(de)(de)(de)防(fang)水(shui)(shui)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)起到很(hen)好的(de)(de)(de)效(xiao)果(guo),確(que)保了(le)(le)(le)水(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)建設的(de)(de)(de)順利(li)實施。

1帷(wei)幕灌漿施工(gong)工(gong)藝流程

1.1施工測量

為了能夠準確的(de)進(jin)行(xing)鉆孔(kong),應(ying)該(gai)按照相(xiang)應(ying)的(de)資料進(jin)行(xing)測量,在測量的(de)過程當中應(ying)該(gai)對相(xiang)應(ying)數據(ju)進(jin)行(xing)檢查,確保數據(ju)的(de)精確,經過測量對鉆孔(kong)分布(bu)進(jin)行(xing)設置。

1.2灌漿孔布置

按設計(ji)(ji)要求在防(fang)(fang)滲(shen)墻軸(zhou)線(xian)上(shang)布置灌漿孔,分(fen)Ⅲ序,孔距2m,孔位軸(zhou)向偏(pian)差不得超(chao)過10cm,孔深為(wei)防(fang)(fang)滲(shen)墻砼底(di)部20~30m 不等(deng),均超(chao)過設計(ji)(ji)帷幕灌漿底(di)線(xian)。

1.3成孔

在(zai)(zai)(zai)(zai)開始帷幕灌漿施(shi)工(gong)(gong)(gong)之(zhi)前(qian)首先要進行鉆(zhan)(zhan)(zhan)(zhan)孔(kong),這是(shi)灌漿的(de)(de)(de)基礎(chu)工(gong)(gong)(gong)作(zuo)(zuo)。整個灌漿施(shi)工(gong)(gong)(gong)能(neng)(neng)否(fou)順(shun)利的(de)(de)(de)完(wan)成(cheng)以及(ji)完(wan)成(cheng)的(de)(de)(de)質量都直(zhi)接(jie)受到鉆(zhan)(zhan)(zhan)(zhan)孔(kong)質量的(de)(de)(de)影響。因此在(zai)(zai)(zai)(zai)進行鉆(zhan)(zhan)(zhan)(zhan)孔(kong)作(zuo)(zuo)業的(de)(de)(de)時候一(yi)定要確保(bao)質量。首先對(dui)工(gong)(gong)(gong)作(zuo)(zuo)的(de)(de)(de)場地進行相應(ying)的(de)(de)(de)平整對(dui)工(gong)(gong)(gong)作(zuo)(zuo)場地上存(cun)在(zai)(zai)(zai)(zai)的(de)(de)(de)雜物進行清(qing)理,從(cong)而保(bao)證(zheng)鉆(zhan)(zhan)(zhan)(zhan)架在(zai)(zai)(zai)(zai)工(gong)(gong)(gong)作(zuo)(zuo)過(guo)程(cheng)中的(de)(de)(de)穩(wen)定,防止在(zai)(zai)(zai)(zai)鉆(zhan)(zhan)(zhan)(zhan)孔(kong)的(de)(de)(de)過(guo)程(cheng)當(dang)(dang)中出現(xian)意外。其次,等到相應(ying)的(de)(de)(de)設備完(wan)成(cheng)安裝之(zhi)后要進行試驗(yan)運(yun)(yun)行,在(zai)(zai)(zai)(zai)運(yun)(yun)行的(de)(de)(de)過(guo)程(cheng)當(dang)(dang)中對(dui)鉆(zhan)(zhan)(zhan)(zhan)機(ji)(ji)(ji)的(de)(de)(de)情況進行檢查,從(cong)而保(bao)證(zheng)鉆(zhan)(zhan)(zhan)(zhan)機(ji)(ji)(ji)能(neng)(neng)夠(gou)以高性能(neng)(neng)運(yun)(yun)行。做好鉆(zhan)(zhan)(zhan)(zhan)孔(kong)過(guo)程(cheng)當(dang)(dang)中的(de)(de)(de)水以及(ji)電源(yuan)的(de)(de)(de)供應(ying)工(gong)(gong)(gong)作(zuo)(zuo)。第三(san),在(zai)(zai)(zai)(zai)鉆(zhan)(zhan)(zhan)(zhan)孔(kong)開始之(zhi)前(qian)對(dui)鉆(zhan)(zhan)(zhan)(zhan)機(ji)(ji)(ji)的(de)(de)(de)各個部件(jian)進行檢查,要重點檢查鉆(zhan)(zhan)(zhan)(zhan)桿是(shi)否(fou)存(cun)在(zai)(zai)(zai)(zai)彎曲。最后,在(zai)(zai)(zai)(zai)進行鉆(zhan)(zhan)(zhan)(zhan)進的(de)(de)(de)過(guo)程(cheng)當(dang)(dang)中應(ying)該時刻的(de)(de)(de)關(guan)注鉆(zhan)(zhan)(zhan)(zhan)機(ji)(ji)(ji)的(de)(de)(de)運(yun)(yun)行狀態(tai),保(bao)證(zheng)鉆(zhan)(zhan)(zhan)(zhan)頭(tou)的(de)(de)(de)冷卻。

1.4縫隙沖洗和壓水試(shi)驗

當鉆(zhan)孔作(zuo)(zuo)業完(wan)成之(zhi)后(hou),需(xu)要對(dui)鉆(zhan)孔進行沖洗(xi)(xi),應(ying)該(gai)(gai)確保(bao)沖洗(xi)(xi)的(de)水(shui)(shui)壓(ya)以及(ji)流(liu)量(liang),沖洗(xi)(xi)的(de)順(shun)序(xu)應(ying)該(gai)(gai)從下往上,沖洗(xi)(xi)的(de)程度應(ying)該(gai)(gai)一直確保(bao)鉆(zhan)孔回水(shui)(shui)變清為止,為了保(bao)證(zheng)沖洗(xi)(xi)的(de)效果,可(ke)以再沖洗(xi)(xi)十幾分(fen)鐘,從而把鉆(zhan)孔中的(de)沉(chen)渣完(wan)全的(de)沖洗(xi)(xi)出(chu)來(lai),最終確保(bao)孔低的(de)沉(chen)渣不超(chao)過相(xiang)應(ying)的(de)標準(zhun)。對(dui)于沖洗(xi)(xi)所使用的(de)水(shui)(shui)壓(ya)應(ying)該(gai)(gai)不小于灌漿壓(ya)力的(de)五分(fen)之(zhi)四(si)。等(deng)到(dao)縫隙沖洗(xi)(xi)工(gong)作(zuo)(zuo)完(wan)成之(zhi)后(hou)需(xu)要進行相(xiang)應(ying)的(de)壓(ya)水(shui)(shui)試驗。

2存(cun)在的問題及對策

2.1灌漿中斷

在(zai)對(dui)(dui)(dui)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)過程(cheng)中(zhong)(zhong)(zhong)應(ying)(ying)該(gai)保(bao)(bao)持灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)連續性(xing),否則會(hui)對(dui)(dui)(dui)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)質(zhi)量(liang)(liang)產生(sheng)一(yi)(yi)(yi)(yi)定的(de)(de)(de)(de)(de)(de)影(ying)(ying)響,所(suo)以(yi)(yi)(yi)期(qi)(qi)間存(cun)在(zai)的(de)(de)(de)(de)(de)(de)問題一(yi)(yi)(yi)(yi)定要(yao)引(yin)起重視。對(dui)(dui)(dui)于(yu)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)過程(cheng)中(zhong)(zhong)(zhong)可(ke)(ke)能會(hui)存(cun)在(zai)很(hen)多種原因導致灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)中(zhong)(zhong)(zhong)斷(duan),比(bi)如(ru)(ru)說(shuo)突然的(de)(de)(de)(de)(de)(de)停電(dian)就(jiu)會(hui)造(zao)成機(ji)器(qi)停止(zhi)(zhi)運轉(zhuan),不(bu)(bu)僅對(dui)(dui)(dui)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)質(zhi)量(liang)(liang)會(hui)有(you)(you)所(suo)影(ying)(ying)響,對(dui)(dui)(dui)于(yu)施(shi)(shi)(shi)工(gong)的(de)(de)(de)(de)(de)(de)設(she)(she)(she)備(bei)也會(hui)造(zao)成一(yi)(yi)(yi)(yi)定的(de)(de)(de)(de)(de)(de)損失。所(suo)以(yi)(yi)(yi)針(zhen)對(dui)(dui)(dui)這種情(qing)況(kuang)的(de)(de)(de)(de)(de)(de)發(fa)生(sheng),可(ke)(ke)以(yi)(yi)(yi)配備(bei)相應(ying)(ying)的(de)(de)(de)(de)(de)(de)發(fa)電(dian)機(ji),在(zai)停電(dian)的(de)(de)(de)(de)(de)(de)時(shi)候,及時(shi)的(de)(de)(de)(de)(de)(de)供電(dian)。再者(zhe)平時(shi)應(ying)(ying)該(gai)加(jia)強(qiang)對(dui)(dui)(dui)于(yu)輸(shu)電(dian)設(she)(she)(she)備(bei)的(de)(de)(de)(de)(de)(de)檢(jian)(jian)查(cha)(cha)與維修(xiu),定期(qi)(qi)的(de)(de)(de)(de)(de)(de)進(jin)(jin)(jin)(jin)行(xing)(xing)檢(jian)(jian)查(cha)(cha)與保(bao)(bao)養,及時(shi)的(de)(de)(de)(de)(de)(de)發(fa)現(xian)問題,對(dui)(dui)(dui)其進(jin)(jin)(jin)(jin)行(xing)(xing)解決(jue),以(yi)(yi)(yi)免(mian)對(dui)(dui)(dui)施(shi)(shi)(shi)工(gong)造(zao)成障(zhang)礙,以(yi)(yi)(yi)保(bao)(bao)證(zheng)施(shi)(shi)(shi)工(gong)程(cheng)序的(de)(de)(de)(de)(de)(de)正(zheng)常進(jin)(jin)(jin)(jin)行(xing)(xing)。還有(you)(you)就(jiu)是(shi)在(zai)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)過程(cheng)中(zhong)(zhong)(zhong)會(hui)利用到輸(shu)漿(jiang)(jiang)(jiang)(jiang)管(guan),如(ru)(ru)果(guo)漿(jiang)(jiang)(jiang)(jiang)液中(zhong)(zhong)(zhong)有(you)(you)一(yi)(yi)(yi)(yi)定的(de)(de)(de)(de)(de)(de)固體存(cun)在(zai)或者(zhe)流動性(xing)不(bu)(bu)好的(de)(de)(de)(de)(de)(de)話,就(jiu)會(hui)導致輸(shu)漿(jiang)(jiang)(jiang)(jiang)管(guan)發(fa)生(sheng)堵塞,造(zao)成灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)中(zhong)(zhong)(zhong)斷(duan),針(zhen)對(dui)(dui)(dui)這樣的(de)(de)(de)(de)(de)(de)情(qing)況(kuang),在(zai)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)之前,要(yao)對(dui)(dui)(dui)灌(guan)(guan)(guan)注的(de)(de)(de)(de)(de)(de)漿(jiang)(jiang)(jiang)(jiang)液進(jin)(jin)(jin)(jin)行(xing)(xing)質(zhi)量(liang)(liang)的(de)(de)(de)(de)(de)(de)檢(jian)(jian)查(cha)(cha),確保(bao)(bao)漿(jiang)(jiang)(jiang)(jiang)液的(de)(de)(de)(de)(de)(de)流動性(xing)符(fu)合標準,施(shi)(shi)(shi)工(gong)后(hou),要(yao)對(dui)(dui)(dui)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)管(guan)及時(shi)的(de)(de)(de)(de)(de)(de)進(jin)(jin)(jin)(jin)行(xing)(xing)清洗(xi),保(bao)(bao)證(zheng)館內沒(mei)有(you)(you)雜物的(de)(de)(de)(de)(de)(de)存(cun)在(zai),定期(qi)(qi)的(de)(de)(de)(de)(de)(de)對(dui)(dui)(dui)輸(shu)漿(jiang)(jiang)(jiang)(jiang)管(guan)進(jin)(jin)(jin)(jin)行(xing)(xing)清洗(xi)維護。在(zai)對(dui)(dui)(dui)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)(de)(de)(de)相應(ying)(ying)設(she)(she)(she)備(bei)上也應(ying)(ying)該(gai)進(jin)(jin)(jin)(jin)行(xing)(xing)仔細的(de)(de)(de)(de)(de)(de)故(gu)障(zhang)排查(cha)(cha),比(bi)如(ru)(ru)壓力(li)表(biao)是(shi)否可(ke)(ke)以(yi)(yi)(yi)正(zheng)常運轉(zhuan),高(gao)壓灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)閥門和(he)隔漿(jiang)(jiang)(jiang)(jiang)塞是(shi)否有(you)(you)失靈的(de)(de)(de)(de)(de)(de)現(xian)象,在(zai)施(shi)(shi)(shi)工(gong)之前都(dou)要(yao)進(jin)(jin)(jin)(jin)行(xing)(xing)一(yi)(yi)(yi)(yi)遍檢(jian)(jian)查(cha)(cha),日(ri)常的(de)(de)(de)(de)(de)(de)維護一(yi)(yi)(yi)(yi)定要(yao)跟緊。所(suo)以(yi)(yi)(yi)說(shuo)對(dui)(dui)(dui)于(yu)施(shi)(shi)(shi)工(gong)前的(de)(de)(de)(de)(de)(de)預防工(gong)作是(shi)非常有(you)(you)必(bi)要(yao)的(de)(de)(de)(de)(de)(de),它可(ke)(ke)以(yi)(yi)(yi)有(you)(you)效的(de)(de)(de)(de)(de)(de)防止(zhi)(zhi)在(zai)施(shi)(shi)(shi)工(gong)過程(cheng)中(zhong)(zhong)(zhong)出現(xian)的(de)(de)(de)(de)(de)(de)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)中(zhong)(zhong)(zhong)斷(duan),減少故(gu)障(zhang)的(de)(de)(de)(de)(de)(de)發(fa)生(sheng)率。那么對(dui)(dui)(dui)于(yu)日(ri)常的(de)(de)(de)(de)(de)(de)保(bao)(bao)養維護也一(yi)(yi)(yi)(yi)定要(yao)提上日(ri)程(cheng),作為平時(shi)的(de)(de)(de)(de)(de)(de)工(gong)作重點,不(bu)(bu)要(yao)等(deng)到對(dui)(dui)(dui)設(she)(she)(she)備(bei)有(you)(you)所(suo)應(ying)(ying)用的(de)(de)(de)(de)(de)(de)時(shi)候才想起來設(she)(she)(she)備(bei)還沒(mei)有(you)(you)進(jin)(jin)(jin)(jin)行(xing)(xing)檢(jian)(jian)修(xiu),那樣不(bu)(bu)僅對(dui)(dui)(dui)工(gong)程(cheng)的(de)(de)(de)(de)(de)(de)進(jin)(jin)(jin)(jin)度有(you)(you)所(suo)影(ying)(ying)響,對(dui)(dui)(dui)設(she)(she)(she)備(bei)在(zai)使(shi)用壽命上也會(hui)有(you)(you)所(suo)降(jiang)低。

2.2串漿

在灌(guan)(guan)漿(jiang)(jiang)施工過程中(zhong)(zhong),有時會發生漿(jiang)(jiang)液從其他鉆孔(kong)(kong)或者地下裂(lie)隙中(zhong)(zhong)流到帷幕的(de)(de)設(she)計(ji)范圍之外,從而(er)造成漿(jiang)(jiang)液流失的(de)(de)現(xian)象,即(ji)為串(chuan)漿(jiang)(jiang)。串(chuan)漿(jiang)(jiang)產(chan)生的(de)(de)主要原(yuan)因是在灌(guan)(guan)漿(jiang)(jiang)孔(kong)(kong)間(jian)的(de)(de)巖層中(zhong)(zhong)由于縫隙較多并(bing)相互串(chuan)連,使得灌(guan)(guan)漿(jiang)(jiang)孔(kong)(kong)之間(jian)產(chan)生連通(tong),并(bing)導致了(le)串(chuan)漿(jiang)(jiang)通(tong)路。對(dui)于串(chuan)漿(jiang)(jiang)現(xian)象的(de)(de)治理措施主要包括:對(dui)串(chuan)漿(jiang)(jiang)孔(kong)(kong)和(he)灌(guan)(guan)漿(jiang)(jiang)孔(kong)(kong)進(jin)行同時灌(guan)(guan)漿(jiang)(jiang),并(bing)且(qie)每個孔(kong)(kong)都設(she)置一臺(tai)灌(guan)(guan)漿(jiang)(jiang)泵進(jin)行灌(guan)(guan)注;在串(chuan)漿(jiang)(jiang)孔(kong)(kong)漏漿(jiang)(jiang)部(bu)位的(de)(de)上(shang)方安裝灌(guan)(guan)漿(jiang)(jiang)塞(sai)來進(jin)行嚴密堵(du)塞(sai)。

2.3漏漿

在(zai)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)施工過(guo)程中(zhong)(zhong),由于縫隙較多、灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)壓力較大,通常會(hui)出(chu)(chu)現(xian)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)注(zhu)入(ru)率過(guo)大的(de)(de)(de)現(xian)象(xiang),其實往往是發生了大量(liang)(liang)的(de)(de)(de)漏漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)。對于大量(liang)(liang)漏漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)治理措施主(zhu)要包括:通過(guo)低(di)(di)(di)壓甚至自流(liu)(liu)(liu)式的(de)(de)(de)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)方式來降(jiang)(jiang)低(di)(di)(di)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)壓力,直(zhi)到(dao)縫隙逐漸(jian)充滿漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)、并降(jiang)(jiang)低(di)(di)(di)流(liu)(liu)(liu)動(dong)(dong)性之后再慢慢提高灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)壓力;將進(jin)(jin)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)量(liang)(liang)限制(zhi)在(zai)30~40L/min 以(yi)(yi)(yi)下,并采(cai)用濃(nong)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)進(jin)(jin)行(xing)灌(guan)(guan)(guan)(guan)注(zhu),直(zhi)到(dao)進(jin)(jin)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)量(liang)(liang)明顯減(jian)少之后再慢慢提高灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)壓力;采(cai)用濃(nong)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)甚至可(ke)以(yi)(yi)(yi)在(zai)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)中(zhong)(zhong)摻加砂料(liao)來進(jin)(jin)行(xing)灌(guan)(guan)(guan)(guan)注(zhu),通過(guo)降(jiang)(jiang)低(di)(di)(di)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)的(de)(de)(de)流(liu)(liu)(liu)動(dong)(dong)性,再加上同時適當(dang)地降(jiang)(jiang)低(di)(di)(di)灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)壓力,以(yi)(yi)(yi)此來限制(zhi)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)流(liu)(liu)(liu)動(dong)(dong)的(de)(de)(de)范圍,保證漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)不至于流(liu)(liu)(liu)失過(guo)遠,直(zhi)到(dao)單位(wei)吸漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)量(liang)(liang)已經降(jiang)(jiang)低(di)(di)(di)到(dao)了一定的(de)(de)(de)程度之后,再采(cai)用不摻粗料(liao)的(de)(de)(de)正(zheng)常漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)繼(ji)續灌(guan)(guan)(guan)(guan)注(zhu)并逐漸(jian)提高灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)壓力;當(dang)出(chu)(chu)現(xian)巖層(ceng)在(zai)長(chang)時間內一直(zhi)大量(liang)(liang)進(jin)(jin)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)現(xian)象(xiang),還可(ke)以(yi)(yi)(yi)采(cai)用間歇灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)的(de)(de)(de)方式,即每連續灌(guan)(guan)(guan)(guan)注(zhu)一段時間就(jiu)停止灌(guan)(guan)(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang),等漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液(ye)(ye)凝結(jie)一段時間再繼(ji)續灌(guan)(guan)(guan)(guan)注(zhu)。

結語

綜上所(suo)(suo)述,帷幕(mu)灌(guan)漿(jiang)技術(shu)在水(shui)利工程中發揮著防水(shui)的(de)重要作(zuo)用,所(suo)(suo)以(yi)要對(dui)這項技術(shu)大力的(de)進(jin)行推廣,使其為(wei)我(wo)國的(de)水(shui)利工程事(shi)業(ye)(ye)做(zuo)出更大的(de)貢獻(xian)。但是帷幕(mu)灌(guan)漿(jiang)技術(shu)在使用中還是會存在相應問題的(de)產(chan)生,這就(jiu)要求我(wo)們的(de)施工企(qi)業(ye)(ye)在實踐(jian)的(de)工作(zuo)中不(bu)斷(duan)的(de)總(zong)結(jie)經驗,制定出完(wan)善的(de)措施,使這項技術(shu)不(bu)斷(duan)的(de)進(jin)步。

參考文獻

篇6

中圖分類號TV5 文獻標識碼(ma)A 文章編號 1674-6708(2013)102-0191-02

0 引言

帷幕灌漿(jiang)技術(shu)屬于(yu)實(shi)用(yong)性非常(chang)強的(de)(de)工(gong)程技術(shu),它的(de)(de)應用(yong)范圍極(ji)其廣泛,在(zai)(zai)整個(ge)水(shui)(shui)利工(gong)程項目(mu)施(shi)工(gong)中,施(shi)工(gong)人(ren)員常(chang)會選用(yong)它來處理基巖底部(bu)的(de)(de)防(fang)滲問題,以確(que)保(bao)整個(ge)水(shui)(shui)利工(gong)程可以正常(chang)運(yun)行(xing)。帷幕灌漿(jiang)技術(shu)可以把水(shui)(shui)泥漿(jiang)和土層有效融(rong)合在(zai)(zai)一起,這樣所形成的(de)(de)帷幕很密實(shi),又能在(zai)(zai)根本上提(ti)高土層的(de)(de)抗滲作用(yong),此外(wai)還可以很好的(de)(de)預(yu)防(fang)水(shui)(shui)流在(zai)(zai)地層里面出現(xian)的(de)(de)內滲透現(xian)象。所以說帷幕灌漿(jiang)技術(shu)在(zai)(zai)確(que)保(bao)水(shui)(shui)利工(gong)程的(de)(de)正常(chang)運(yun)行(xing)發揮著極(ji)其重(zhong)要的(de)(de)作用(yong)。

1帷幕(mu)灌漿的(de)施工(gong)工(gong)藝(yi)

1.1施工前要進行測量(liang)

正式開(kai)展(zhan)施(shi)(shi)工(gong)(gong)作業(ye)前,施(shi)(shi)工(gong)(gong)單位(wei)(wei)會獲取監(jian)理單位(wei)(wei)提供給的基準(zhun)(zhun)(zhun)數據、基準(zhun)(zhun)(zhun)點、以及基準(zhun)(zhun)(zhun)線等各種測(ce)(ce)量(liang)資料(liao),所以施(shi)(shi)工(gong)(gong)作業(ye)人員需要(yao)實(shi)地測(ce)(ce)量(liang),以便對(dui)基準(zhun)(zhun)(zhun)線和點進行校(xiao)準(zhun)(zhun)(zhun),然后(hou)根據所得(de)測(ce)(ce)量(liang)信息(xi),對(dui)帷幕灌漿孔軸線進行嚴格(ge)的實(shi)地測(ce)(ce)量(liang),并且要(yao)多次對(dui)數據和資料(liao)進行核對(dui),以確保其準(zhun)(zhun)(zhun)確性。

1.2成孔

帷(wei)(wei)幕(mu)灌(guan)漿施工(gong)過程中的(de)第一(yi)道(dao)(dao)工(gong)序(xu)(xu)屬(shu)于成孔(kong)(kong),它是決定(ding)灌(guan)漿質(zhi)量(liang)(liang)的(de)最為(wei)重要的(de)一(yi)道(dao)(dao)施工(gong)工(gong)序(xu)(xu)。通(tong)常成孔(kong)(kong)質(zhi)量(liang)(liang)以及進展(zhan)情況會(hui)直接影響到帷(wei)(wei)幕(mu)灌(guan)漿施工(gong)質(zhi)量(liang)(liang)與工(gong)期,所以必(bi)須確保成孔(kong)(kong)又快又好的(de)施工(gong)完。

1)施(shi)(shi)工人(ren)員(yuan)在平(ping)(ping)整清理好(hao)施(shi)(shi)工場地(di)(di)后才可(ke)安裝鉆(zhan)(zhan)架并(bing)將(jiang)鉆(zhan)(zhan)機擺放好(hao),另外施(shi)(shi)工人(ren)員(yuan)需要結合施(shi)(shi)工現場實(shi)際情況(kuang)對地(di)(di)板進行鋪設,然(ran)后采用(yong)方木(mu)將(jiang)鉆(zhan)(zhan)孔(kong)平(ping)(ping)臺(tai)搭設好(hao),鉆(zhan)(zhan)機一定要穩固(gu)、端正(zheng),確保能和鉆(zhan)(zhan)機平(ping)(ping)臺(tai)、鉆(zhan)(zhan)桿以及(ji)灌漿孔(kong)三者(zhe)之間的中心(xin)點(dian)可(ke)以形成(cheng)一條(tiao)線;

2)當鉆(zhan)(zhan)機安放好(hao)以后,需要對(dui)其進(jin)行試(shi)機與(yu)試(shi)鉆(zhan)(zhan),等到確定(ding)鉆(zhan)(zhan)機動力(li)、供(gong)水以及供(gong)電(dian)等諸(zhu)多設備與(yu)系統都可(ke)以正常運行后才可(ke)開始(shi)鉆(zhan)(zhan)進(jin)工作(zuo);

3)每次鉆孔前施工人(ren)員都要認(ren)真檢查一遍鉆桿、鉆具(ju)和其它鉆進的零(ling)部件,不允(yun)許變形或者彎曲的鉆桿與鉆具(ju)投入(ru)到施工中去,另(ling)外每個部位接頭處(chu)一定要牢固并(bing)確保其同心度良好;

4)最(zui)后一(yi)點需注意的是(shi),金剛石鉆進成(cheng)孔(kong)時的間隙通常會比(bi)較小(xiao),加上鉆頭水口也比(bi)較窄,這時就需要采用(yong)大的泵(beng)壓及泵(beng)量才能滿足強制冷卻(que)以及沖洗所需。

1.3沖洗縫隙以(yi)及開展壓水試驗

成孔(kong)之后才可開始帷幕(mu)灌漿的(de)(de)(de)施(shi)工作業(ye),一(yi)般需采用導管把大(da)流(liu)量的(de)(de)(de)高壓(ya)水流(liu)逐步的(de)(de)(de)從孔(kong)底往孔(kong)外緩慢進行沖(chong)(chong)洗(xi),在(zai)這(zhe)個(ge)過程中要對孔(kong)壁進行反復沖(chong)(chong)洗(xi),借助這(zhe)樣單(dan)孔(kong)沖(chong)(chong)洗(xi)的(de)(de)(de)方式一(yi)直到回(hui)水徹底澄清后,還要持續沖(chong)(chong)洗(xi)10分(fen)鐘左(zuo)右(you),一(yi)般沖(chong)(chong)洗(xi)的(de)(de)(de)總(zong)時間不得(de)(de)低于(yu)30分(fen)鐘,而串(chuan)通的(de)(de)(de)時間不得(de)(de)低于(yu)2個(ge)小時,沉渣的(de)(de)(de)厚(hou)度不得(de)(de)大(da)于(yu)20厘米。通常縫隙沖(chong)(chong)洗(xi)壓(ya)力應該為整個(ge)灌漿段(duan)壓(ya)力八成左(zuo)右(you),在(zai)縫隙沖(chong)(chong)洗(xi)干凈后還需開展(zhan)壓(ya)水試(shi)驗,對于(yu)壓(ya)水試(shi)驗施(shi)工人員(yuan)應采取單(dan)點法(fa),而壓(ya)力要設置(zhi)的(de)(de)(de)跟沖(chong)(chong)洗(xi)時的(de)(de)(de)壓(ya)力一(yi)樣,并且不能大(da)于(yu)lMPa。

1.4灌漿施(shi)工作業(ye)

一(yi)般(ban)情況下帷幕灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)施(shi)工(gong)常會采取(qu)自下而上(shang)的方法分段(duan)進行,此(ci)時(shi)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)壓力要(yao)達到施(shi)工(gong)規范的標準,如果注入率(lv)小(xiao)(xiao)于(yu)0.4L/min時(shi),就(jiu)要(yao)持續(xu)灌(guan)(guan)(guan)注30分鐘,當注入率(lv)小(xiao)(xiao)于(yu)1L/min時(shi),就(jiu)要(yao)確保灌(guan)(guan)(guan)注時(shi)間至少1小(xiao)(xiao)時(shi),然后(hou)才可結束灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)。假(jia)如采取(qu)自上(shang)而下的分段(duan)灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)方式,其灌(guan)(guan)(guan)注時(shi)間則需(xu)分別(bie)增加半個小(xiao)(xiao)時(shi)或者一(yi)個小(xiao)(xiao)時(shi)。灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)時(shi)需(xu)要(yao)隨(sui)時(shi)對回(hui)漿(jiang)(jiang)(jiang)以(yi)及進漿(jiang)(jiang)(jiang)比(bi)重進行測量,一(yi)般(ban)回(hui)漿(jiang)(jiang)(jiang)變(bian)得太濃,就(jiu)要(yao)立即換作(zuo)和(he)進漿(jiang)(jiang)(jiang)配比(bi)一(yi)樣的新漿(jiang)(jiang)(jiang)液繼續(xu)灌(guan)(guan)(guan)注。如果這樣灌(guan)(guan)(guan)漿(jiang)(jiang)(jiang)的效果不(bu)明顯,就(jiu)需(xu)要(yao)將灌(guan)(guan)(guan)注時(shi)間延長半個小(xiao)(xiao)時(shi),然后(hou)方可停止(zhi)灌(guan)(guan)(guan)注。

1.5封孔施工作(zuo)業

灌(guan)漿(jiang)完(wan)成后需(xu)要采(cai)用(yong)置換以(yi)(yi)及壓力灌(guan)漿(jiang)封堵(du)的辦法進行(xing)封孔施工作業(ye)。當全控灌(guan)漿(jiang)完(wan)成后,施工人員(yuan)可采(cai)取05:1的水(shui)泥(ni)漿(jiang)把孔里(li)面(mian)的漿(jiang)液(ye)置換掉(diao),另外還需(xu)將孔里(li)面(mian)的灌(guan)漿(jiang)管(guan)取出來,隨后采(cai)用(yong)相(xiang)同(tong)配比的水(shui)泥(ni)漿(jiang)以(yi)(yi)最大灌(guan)漿(jiang)壓力純壓30分鐘(zhong),這期間還需(xu)做好灌(guan)漿(jiang)記(ji)錄。

2帷(wei)幕灌漿施工中常見問題及(ji)防治措施

2.1灌(guan)漿出現中斷(duan)現象

灌漿(jiang)(jiang)(jiang)施(shi)(shi)工(gong)時,由于(yu)停電、漿(jiang)(jiang)(jiang)液堵塞以(yi)及輸漿(jiang)(jiang)(jiang)管破裂(lie)和機械故(gu)障(zhang)等(deng)因素促使灌漿(jiang)(jiang)(jiang)出現中(zhong)斷(duan)現象,所以(yi)說(shuo)灌漿(jiang)(jiang)(jiang)施(shi)(shi)工(gong)前以(yi)及過程(cheng)中(zhong)采取(qu)必要(yao)的防(fang)治措施(shi)(shi)非常重要(yao)。常見的防(fang)治灌漿(jiang)(jiang)(jiang)中(zhong)斷(duan)的措施(shi)(shi)有以(yi)下幾(ji)種(zhong):

1)灌漿(jiang)材料要(yao)選擇(ze)性能滿足施工要(yao)求的輸漿(jiang)觀測(ce),而且施工期間要(yao)隨時對管材質量進行檢查,確保它能牢(lao)固連接在一起,不會出(chu)現(xian)破(po)損和堵塞的情況;

2)灌(guan)漿(jiang)(jiang)泵性能要(yao)達到施(shi)工(gong)(gong)規范要(yao)求的(de)標準,即當其處(chu)于最大灌(guan)漿(jiang)(jiang)壓力時也能保(bao)持長時間連(lian)續的(de)工(gong)(gong)作(zuo),而且施(shi)工(gong)(gong)期間要(yao)做好后期養(yang)護工(gong)(gong)作(zuo),一(yi)(yi)般每次(ci)灌(guan)漿(jiang)(jiang)結(jie)束后都需認(ren)真清洗一(yi)(yi)遍灌(guan)漿(jiang)(jiang)泵;

3)施(shi)工人員(yuan)要(yao)及時校正壓力(li)表,確保其數據達到施(shi)工規范要(yao)求的標準;

4)施工人員要(yao)及時清洗高壓灌漿(jiang)閥門(men)以及漿(jiang)塞等部(bu)件;

5)施工(gong)人員要(yao)定期檢查并保養水(shui)電系統,如果(guo)出(chu)現灌漿(jiang)中(zhong)斷(duan)的現象,就(jiu)需(xu)要(yao)采取(qu)(qu)有效措(cuo)施盡可能(neng)(neng)的縮短(duan)中(zhong)斷(duan)時間,爭取(qu)(qu)能(neng)(neng)夠早日開始復灌。

2.2串漿現象

灌(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)施工(gong)期間(jian),很可能(neng)出(chu)現(xian)(xian)(xian)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液從(cong)其它(ta)的(de)鉆(zhan)孔(kong)或者一些地下裂隙里(li)面流入(ru)帷(wei)幕設計(ji)范圍外地方的(de)現(xian)(xian)(xian)象,進而(er)促使(shi)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)液流失掉,這(zhe)便是所(suo)謂的(de)串(chuan)(chuan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)現(xian)(xian)(xian)象。串(chuan)(chuan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)形(xing)成(cheng)的(de)主要原因在(zai)于灌(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)孔(kong)之(zhi)間(jian)的(de)巖層里(li)面存在(zai)很多的(de)縫(feng)隙,這(zhe)些縫(feng)隙又是相互串(chuan)(chuan)聯的(de),因而(er)使(shi)得灌(guan)(guan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)孔(kong)相互之(zhi)間(jian)出(chu)現(xian)(xian)(xian)連(lian)通,進而(er)導致串(chuan)(chuan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)通路(lu)現(xian)(xian)(xian)象出(chu)現(xian)(xian)(xian)。一般情況下施工(gong)人員會采用以下幾種措施來處理串(chuan)(chuan)漿(jiang)(jiang)(jiang)(jiang)(jiang)(jiang)現(xian)(xian)(xian)象:

1)串漿孔以及灌漿孔需要同時進行灌漿,而且(qie)每個孔都需設置一臺(tai)灌漿泵來(lai)灌注漿液(ye);

2)施工人(ren)員需要將灌(guan)漿塞安裝在串漿孔出現漏漿地方的上部位置,然后將其(qi)嚴密堵塞住(zhu)。

2.3漏漿現象

灌(guan)漿(jiang)(jiang)(jiang)施工(gong)時因為縫隙(xi)比(bi)較多,加上(shang)灌(guan)漿(jiang)(jiang)(jiang)的壓力比(bi)較大(da)(da),便會形(xing)成(cheng)漿(jiang)(jiang)(jiang)液的注入率過大(da)(da)的現(xian)象(xiang),這(zhe)種現(xian)象(xiang)其實就是灌(guan)漿(jiang)(jiang)(jiang)過程中(zhong)出現(xian)了大(da)(da)量的漏(lou)漿(jiang)(jiang)(jiang)。一般(ban)處理大(da)(da)量漏(lou)漿(jiang)(jiang)(jiang)現(xian)象(xiang)的措施主要分為以下幾種:

1)借助低壓(ya)或者直流(liu)式(shi)灌(guan)漿(jiang)方法(fa)將灌(guan)漿(jiang)的(de)壓(ya)力降(jiang)(jiang)低,直到(dao)(dao)所有的(de)縫隙都被漿(jiang)液(ye)填滿,且流(liu)動性也得到(dao)(dao)降(jiang)(jiang)低時才可逐步將灌(guan)漿(jiang)壓(ya)力提(ti)高;

2)進漿量(liang)應該控(kong)制在30到(dao)40L/min下,而且(qie)需(xu)要采取濃(nong)漿來灌注(zhu),當進漿量(liang)明(ming)顯降低后才可把灌漿壓(ya)力提高;

3)施工(gong)人員可(ke)以采(cai)取濃漿(jiang)(jiang)或(huo)者往(wang)拌制好的(de)(de)漿(jiang)(jiang)液里(li)面添(tian)加(jia)適量(liang)的(de)(de)砂料(liao)來灌(guan)(guan)注,這樣可(ke)以將漿(jiang)(jiang)液流(liu)(liu)動性(xing)降低,與(yu)此同時(shi)還(huan)可(ke)把(ba)灌(guan)(guan)漿(jiang)(jiang)壓力(li)降低,進而起到(dao)限(xian)制漿(jiang)(jiang)液流(liu)(liu)動范圍的(de)(de)目的(de)(de),漿(jiang)(jiang)液也不會流(liu)(liu)失的(de)(de)太遠,當(dang)單位吸漿(jiang)(jiang)量(liang)下降到(dao)某種(zhong)程(cheng)度(du)后就(jiu)不需(xu)要再往(wang)正常漿(jiang)(jiang)液里(li)面摻加(jia)粗料(liao)了(le),只需(xu)繼續灌(guan)(guan)漿(jiang)(jiang)逐步將灌(guan)(guan)漿(jiang)(jiang)壓力(li)提高即可(ke);

4)一旦(dan)巖層在較(jiao)長一段時(shi)間(jian)(jian)里有大量進漿(jiang)現(xian)象出(chu)現(xian),就(jiu)需要采取間(jian)(jian)歇灌(guan)漿(jiang)的方法,也就(jiu)是連續(xu)灌(guan)漿(jiang)到一定時(shi)間(jian)(jian)后就(jiu)要停(ting)止(zhi)灌(guan)漿(jiang),等到灌(guan)注好的漿(jiang)液(ye)凝結的一段時(shi)間(jian)(jian)后可以繼續(xu)灌(guan)注。

2.4固管現象

所謂固管現象(xiang)是指灌漿(jiang)(jiang)施工時,射漿(jiang)(jiang)管與孔壁之(zhi)間(jian)的漿(jiang)(jiang)液(ye)由于(yu)滿足(zu)了一定的凝結條(tiao)件而(er)自動膠結在(zai)一起,進而(er)形成了固管現象(xiang)。這種固管現象(xiang)形成的主要原(yuan)因(yin)表現在(zai)以下幾(ji)個方(fang)面(mian):

1)漿液受壓力所致丟(diu)失了(le)一部(bu)分的(de)水分,加(jia)上循環過程(cheng)中水泥(ni)水化放(fang)熱以(yi)及壓力的(de)作用等因(yin)素使得溫(wen)度升高,進而(er)極(ji)大的(de)將(jiang)凝結的(de)時(shi)間縮短了(le);

2)灌漿(jiang)孔里面的(de)環狀間隙位置(zhi)(zhi)或者(zhe)灌漿(jiang)管、閥(fa)門等位置(zhi)(zhi)也會出現水泥顆(ke)粒沉(chen)積現象;

3)如果(guo)射漿管下(xia)端和孔壁貼的過近,便會促使(shi)漿液在循環過程中(zhong)因射漿管口受到(dao)阻礙而出(chu)現沉淀現象。

一般處理(li)固管現象的措施主要分為以下幾種:

1)采取回旋式的(de)孔(kong)口封閉器進行施工,而且(qie)灌漿(jiang)時(shi)要經(jing)常上下活動并(bing)轉動灌漿(jiang)管;

2)施工人員(yuan)要經常觀察回漿(jiang)(jiang)的(de)濃度(du)以及回漿(jiang)(jiang)量(liang),確(que)保(bao)回漿(jiang)(jiang)管里面的(de)回漿(jiang)(jiang)量(liang)高于15L/min,如(ru)果(guo)回漿(jiang)(jiang)過程(cheng)中失水(shui)過多便(bian)需要立(li)刻對(dui)漿(jiang)(jiang)液進行(xing)稀釋。

3 結論

帷幕灌(guan)漿技術(shu)屬于水(shui)(shui)(shui)工建筑物地基在(zai)防(fang)(fang)滲處理時采取的(de)(de)(de)重要手段,該技術(shu)施(shi)工時常會選用水(shui)(shui)(shui)泥漿、水(shui)(shui)(shui)泥粘(zhan)土漿以及化(hua)學漿液(ye)進(jin)行施(shi)工。這(zhe)三種材料性能不(bu)一(yi),因而(er)施(shi)工效果也會不(bu)一(yi)樣,水(shui)(shui)(shui)泥漿的(de)(de)(de)施(shi)工效果比(bi)(bi)較(jiao)可靠(kao),灌(guan)漿設備以及施(shi)工工藝都比(bi)(bi)較(jiao)簡單,加上材料的(de)(de)(de)成本低廉,因而(er)成為普遍采用的(de)(de)(de)灌(guan)漿漿液(ye);水(shui)(shui)(shui)泥粘(zhan)土漿的(de)(de)(de)成本比(bi)(bi)較(jiao)低廉,不(bu)過強度(du)比(bi)(bi)較(jiao)低,一(yi)般會用在(zai)砂礫石層防(fang)(fang)滲灌(guan)漿以及對(dui)強度(du)沒(mei)有太高的(de)(de)(de)巖(yan)基灌(guan)漿施(shi)工中(zhong);化(hua)學漿液(ye)的(de)(de)(de)成本比(bi)(bi)較(jiao)高,通常會應(ying)用在(zai)一(yi)些特殊情況下。總之,帷幕灌(guan)漿技術(shu)現階段已經(jing)取得了較(jiao)為不(bu)錯的(de)(de)(de)施(shi)工效果,當仍存在(zai)著不(bu)足(zu)之處,有待進(jin)一(yi)步的(de)(de)(de)改進(jin)和(he)提(ti)高。

參考文獻

[1]盧振(zhen)偉.淺析水利(li)工(gong)程中(zhong)的防滲處理灌漿(jiang)施工(gong)技術[J].廣東科(ke)技,2012(8).

[2]胡小順.淺談(tan)防滲墻下帷(wei)幕灌漿(jiang)施工技(ji)術[J].科技(ji)傳播,2012(20).

篇7

中圖分類號:TV 文獻標識碼:A 文章編號:

對于(yu)水(shui)(shui)(shui)利(li)工(gong)程(cheng)(cheng)(cheng)內(nei)(nei)帷幕(mu)(mu)灌漿施工(gong)技(ji)術(shu)(shu)來說,需(xu)要(yao)從設備(bei)和(he)(he)技(ji)術(shu)(shu)兩個(ge)方面進行系統的(de)(de)研(yan)究(jiu),主要(yao)原因在(zai)于(yu),水(shui)(shui)(shui)利(li)工(gong)程(cheng)(cheng)(cheng)內(nei)(nei)帷幕(mu)(mu)灌漿施工(gong)技(ji)術(shu)(shu)和(he)(he)其(qi)他的(de)(de)技(ji)術(shu)(shu)有很大的(de)(de)不(bu)同,硬件(jian)設備(bei)和(he)(he)技(ji)術(shu)(shu)需(xu)要(yao)良好的(de)(de)配合,并不(bu)存在(zai)誰(shui)依(yi)靠誰(shui)的(de)(de)關(guan)(guan)系。技(ji)術(shu)(shu)和(he)(he)設備(bei)能夠(gou)相對獨立的(de)(de)存在(zai),也(ye)可以配合使用(yong),同時又能夠(gou)達(da)到(dao)較好的(de)(de)效(xiao)果,對于(yu)水(shui)(shui)(shui)利(li)工(gong)程(cheng)(cheng)(cheng)而言,水(shui)(shui)(shui)利(li)工(gong)程(cheng)(cheng)(cheng)內(nei)(nei)帷幕(mu)(mu)灌漿施工(gong)技(ji)術(shu)(shu)是一(yi)個(ge)新的(de)(de)突破,在(zai)現階段的(de)(de)研(yan)究(jiu)中,各國對此都非常的(de)(de)關(guan)(guan)注(zhu),不(bu)僅僅在(zai)應用(yong)方面加深了研(yan)究(jiu),在(zai)其(qi)他領域(yu)也(ye)進行了一(yi)定(ding)的(de)(de)拓(tuo)展。本文就水(shui)(shui)(shui)利(li)工(gong)程(cheng)(cheng)(cheng)內(nei)(nei)帷幕(mu)(mu)灌漿施工(gong)技(ji)術(shu)(shu)進行一(yi)定(ding)的(de)(de)應用(yong)研(yan)究(jiu)。

一、帷幕灌漿技術(shu)的應用原理

帷(wei)幕(mu)灌(guan)漿技術是(shi)一種非常有(you)效(xiao)的防滲技術。帷(wei)幕(mu)灌(guan)漿采用地(di)質鉆(zhan)(zhan)機對需要處(chu)理(li)的地(di)層進行鉆(zhan)(zhan)孔,形(xing)成一道帷(wei)幕(mu)形(xing)鉆(zhan)(zhan)孔,然后將水(shui)(shui)(shui)(shui)泥(ni)漿用高壓灌(guan)注到被處(chu)理(li)的鉆(zhan)(zhan)孔內(nei),水(shui)(shui)(shui)(shui)泥(ni)漿會沿著(zhu)地(di)層縫隙深入滲透,當水(shui)(shui)(shui)(shui)泥(ni)漿凝固以(yi)后,鉆(zhan)(zhan)孔內(nei)的水(shui)(shui)(shui)(shui)泥(ni)漿柱和周圍被水(shui)(shui)(shui)(shui)泥(ni)漿滲透并凝結的土體(ti)會共(gong)同形(xing)成一道密實的防水(shui)(shui)(shui)(shui)帷(wei)幕(mu),能夠有(you)效(xiao)防止水(shui)(shui)(shui)(shui)流從灌(guan)漿地(di)層處(chu)滲透。

二、帷(wei)幕灌漿(jiang)技術的(de)流程

(一)測量

進行(xing)(xing)帷幕灌漿施(shi)工(gong)之前,需(xu)要(yao)對(dui)鉆孔的(de)(de)(de)準(zhun)確位置(zhi)進行(xing)(xing)測(ce)(ce)(ce)(ce)量(liang)(liang)(liang),測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)時要(yao)嚴格按(an)照(zhao)設計要(yao)求進行(xing)(xing)。測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)可采用(yong)全站(zhan)儀來(lai)對(dui)灌漿的(de)(de)(de)軸線進行(xing)(xing)測(ce)(ce)(ce)(ce)設,如果(guo)出現(xian)轉(zhuan)折點(dian)或者高(gao)程(cheng)(cheng)差(cha)較(jiao)(jiao)大的(de)(de)(de)位置(zhi),則應該(gai)加設控制(zhi)點(dian)。對(dui)于水(shui)利(li)工(gong)程(cheng)(cheng)內(nei)帷幕灌漿施(shi)工(gong)技(ji)術(shu)而(er)言,測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)是(shi)一(yi)(yi)個(ge)非常重要(yao)的(de)(de)(de)環(huan)節,很多(duo)的(de)(de)(de)水(shui)利(li)工(gong)程(cheng)(cheng)之所(suo)以在施(shi)行(xing)(xing)這(zhe)項技(ji)術(shu)的(de)(de)(de)時候,沒有達到較(jiao)(jiao)好的(de)(de)(de)效果(guo),原因(yin)就(jiu)在于,沒有進行(xing)(xing)良好的(de)(de)(de)測(ce)(ce)(ce)(ce)量(liang)(liang)(liang),從而(er)導致(zhi)出現(xian)一(yi)(yi)定的(de)(de)(de)問題。在現(xian)階(jie)段的(de)(de)(de)研究中,技(ji)術(shu)人員在測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)方面投入了(le)大量(liang)(liang)(liang)的(de)(de)(de)時間和精(jing)力,并不是(shi)因(yin)為測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)的(de)(de)(de)技(ji)術(shu)有多(duo)難,也不是(shi)因(yin)為測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)的(de)(de)(de)設備較(jiao)(jiao)為高(gao)端,而(er)是(shi)因(yin)為測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)是(shi)施(shi)行(xing)(xing)水(shui)利(li)工(gong)程(cheng)(cheng)內(nei)帷幕灌漿施(shi)工(gong)技(ji)術(shu)的(de)(de)(de)基礎(chu)環(huan)節,如果(guo)在這(zhe)個(ge)環(huan)節出現(xian)差(cha)錯,將會對(dui)整個(ge)水(shui)利(li)工(gong)程(cheng)(cheng)產生(sheng)很大的(de)(de)(de)消極(ji)影(ying)響。為了(le)避免埋(mai)下隱(yin)患,必(bi)須(xu)謹(jin)慎的(de)(de)(de)進行(xing)(xing)測(ce)(ce)(ce)(ce)量(liang)(liang)(liang)這(zhe)一(yi)(yi)工(gong)作,在任何一(yi)(yi)個(ge)方面都不能馬虎。

(二)成孔

在(zai)(zai)(zai)鉆孔(kong)(kong)(kong)的(de)(de)(de)位置、深度、孔(kong)(kong)(kong)徑以及鉆孔(kong)(kong)(kong)順序等(deng)確(que)定(ding)好以后,便可進(jin)行(xing)成(cheng)(cheng)孔(kong)(kong)(kong)作業。成(cheng)(cheng)孔(kong)(kong)(kong)是(shi)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)的(de)(de)(de)第一(yi)(yi)道工(gong)(gong)(gong)序,也是(shi)非(fei)常關(guan)鍵的(de)(de)(de)一(yi)(yi)道工(gong)(gong)(gong)序。成(cheng)(cheng)孔(kong)(kong)(kong)的(de)(de)(de)質(zhi)(zhi)量對(dui)(dui)(dui)整(zheng)(zheng)個(ge)(ge)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)的(de)(de)(de)質(zhi)(zhi)量和(he)效果影響(xiang)重(zhong)大,因(yin)此(ci)成(cheng)(cheng)孔(kong)(kong)(kong)必須在(zai)(zai)(zai)既(ji)快速(su)又高質(zhi)(zhi)的(de)(de)(de)情(qing)況下完(wan)成(cheng)(cheng)。在(zai)(zai)(zai)現(xian)階段的(de)(de)(de)應用研究中,技術(shu)(shu)人員(yuan)將(jiang)目光投(tou)向了(le)成(cheng)(cheng)孔(kong)(kong)(kong)。原因(yin)在(zai)(zai)(zai)于,成(cheng)(cheng)孔(kong)(kong)(kong)是(shi)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)內(nei)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術(shu)(shu)的(de)(de)(de)一(yi)(yi)個(ge)(ge)核(he)心(xin)(xin)關(guan)節,如(ru)果在(zai)(zai)(zai)成(cheng)(cheng)孔(kong)(kong)(kong)的(de)(de)(de)時候出(chu)現(xian)差錯(cuo),對(dui)(dui)(dui)整(zheng)(zheng)個(ge)(ge)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)內(nei)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術(shu)(shu)的(de)(de)(de)實(shi)施(shi),會造成(cheng)(cheng)較為(wei)嚴重(zhong)的(de)(de)(de)后果。在(zai)(zai)(zai)前幾年的(de)(de)(de)報道中,某一(yi)(yi)地(di)區的(de)(de)(de)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)就(jiu)出(chu)現(xian)了(le)較為(wei)嚴重(zhong)的(de)(de)(de)安全事故,經(jing)過詳細的(de)(de)(de)盤查,就(jiu)是(shi)在(zai)(zai)(zai)成(cheng)(cheng)孔(kong)(kong)(kong)這一(yi)(yi)環節埋(mai)下了(le)隱患。由此(ci)可見,成(cheng)(cheng)孔(kong)(kong)(kong)對(dui)(dui)(dui)于水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)內(nei)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術(shu)(shu)的(de)(de)(de)實(shi)施(shi)是(shi)非(fei)常重(zhong)要(yao)的(de)(de)(de)。另一(yi)(yi)方面,在(zai)(zai)(zai)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)中,成(cheng)(cheng)孔(kong)(kong)(kong)必須在(zai)(zai)(zai)快速(su)和(he)高質(zhi)(zhi)的(de)(de)(de)情(qing)況下完(wan)成(cheng)(cheng),主要(yao)原因(yin)在(zai)(zai)(zai)于,成(cheng)(cheng)孔(kong)(kong)(kong)是(shi)核(he)心(xin)(xin)的(de)(de)(de)作業,不能拖拉,如(ru)果時間過長,就(jiu)會影響(xiang)整(zheng)(zheng)個(ge)(ge)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)的(de)(de)(de)進(jin)度和(he)質(zhi)(zhi)量。快速(su)和(he)高質(zhi)(zhi)的(de)(de)(de)成(cheng)(cheng)孔(kong)(kong)(kong)作業能夠(gou)對(dui)(dui)(dui)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)內(nei)帷(wei)(wei)幕(mu)(mu)灌漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術(shu)(shu)的(de)(de)(de)實(shi)施(shi)起到(dao)(dao)一(yi)(yi)定(ding)的(de)(de)(de)積極(ji)影響(xiang),繼而就(jiu)會使整(zheng)(zheng)個(ge)(ge)水(shui)(shui)(shui)利(li)工(gong)(gong)(gong)程(cheng)達(da)到(dao)(dao)一(yi)(yi)個(ge)(ge)較為(wei)高端的(de)(de)(de)水(shui)(shui)(shui)準。

(三)縫隙沖洗

帷幕(mu)灌漿(jiang)技(ji)(ji)(ji)(ji)術(shu)(shu)在成(cheng)(cheng)孔(kong)(kong)完成(cheng)(cheng)后,需要(yao)(yao)(yao)采用導管對(dui)(dui)鉆孔(kong)(kong)進(jin)(jin)行(xing)(xing)(xing)高(gao)壓水(shui)(shui)沖(chong)(chong)洗(xi)(xi)。沖(chong)(chong)洗(xi)(xi)時(shi)(shi)(shi)要(yao)(yao)(yao)保證水(shui)(shui)壓和流量,沖(chong)(chong)洗(xi)(xi)應(ying)該從下往上進(jin)(jin)行(xing)(xing)(xing),使水(shui)(shui)不斷沖(chong)(chong)洗(xi)(xi)孔(kong)(kong)壁(bi),當觀察(cha)(cha)沖(chong)(chong)洗(xi)(xi)的(de)(de)回(hui)水(shui)(shui)變清以后,可再持續(xu)沖(chong)(chong)洗(xi)(xi)10 min,并(bing)且(qie)要(yao)(yao)(yao)保證總的(de)(de)沖(chong)(chong)洗(xi)(xi)時(shi)(shi)(shi)間(jian)(jian)在半(ban)小(xiao)時(shi)(shi)(shi)以上,總沖(chong)(chong)孔(kong)(kong)的(de)(de)時(shi)(shi)(shi)間(jian)(jian)要(yao)(yao)(yao)> 2 h,沖(chong)(chong)洗(xi)(xi)完成(cheng)(cheng)后孔(kong)(kong)底的(de)(de)沉渣厚度應(ying)該在規定標準之內(nei)。在水(shui)(shui)利(li)工程內(nei)帷幕(mu)灌漿(jiang)施工技(ji)(ji)(ji)(ji)術(shu)(shu)的(de)(de)實施過程中,縫隙沖(chong)(chong)洗(xi)(xi)是一個(ge)(ge)比較(jiao)容(rong)易(yi)出錯的(de)(de)環節,主要(yao)(yao)(yao)原因(yin)在于時(shi)(shi)(shi)間(jian)(jian)上面比較(jiao)容(rong)易(yi)出錯,而(er)且(qie)很(hen)多的(de)(de)工作人(ren)員(yuan)在進(jin)(jin)行(xing)(xing)(xing)操作的(de)(de)時(shi)(shi)(shi)候,由于疏(shu)忽(hu)大(da)意(yi),會(hui)對(dui)(dui)水(shui)(shui)利(li)工程內(nei)帷幕(mu)灌漿(jiang)施工技(ji)(ji)(ji)(ji)術(shu)(shu)造(zao)成(cheng)(cheng)很(hen)大(da)的(de)(de)消極影(ying)響(xiang)。在時(shi)(shi)(shi)間(jian)(jian)方面,最重要(yao)(yao)(yao)的(de)(de)就是保證總沖(chong)(chong)洗(xi)(xi)時(shi)(shi)(shi)間(jian)(jian)在半(ban)小(xiao)時(shi)(shi)(shi)以上,而(er)且(qie)總沖(chong)(chong)孔(kong)(kong)時(shi)(shi)(shi)間(jian)(jian)要(yao)(yao)(yao)大(da)于兩個(ge)(ge)小(xiao)時(shi)(shi)(shi)。工作人(ren)員(yuan)在進(jin)(jin)行(xing)(xing)(xing)沖(chong)(chong)洗(xi)(xi)和沖(chong)(chong)孔(kong)(kong)的(de)(de)時(shi)(shi)(shi)候,并(bing)沒(mei)有(you)完全(quan)的(de)(de)按(an)照規定的(de)(de)時(shi)(shi)(shi)間(jian)(jian)來進(jin)(jin)行(xing)(xing)(xing),往往的(de)(de)情況都是一個(ge)(ge)估值(zhi),這對(dui)(dui)水(shui)(shui)利(li)工程內(nei)帷幕(mu)灌漿(jiang)施工技(ji)(ji)(ji)(ji)術(shu)(shu)來說是非常不利(li)的(de)(de)。另一方面,在沖(chong)(chong)洗(xi)(xi)的(de)(de)時(shi)(shi)(shi)候,需要(yao)(yao)(yao)從下往上進(jin)(jin)行(xing)(xing)(xing),而(er)且(qie)要(yao)(yao)(yao)觀察(cha)(cha)沖(chong)(chong)洗(xi)(xi)的(de)(de)回(hui)水(shui)(shui)變清,有(you)的(de)(de)工作人(ren)員(yuan)甚至從上往下沖(chong)(chong)洗(xi)(xi),也(ye)沒(mei)有(you)對(dui)(dui)沖(chong)(chong)洗(xi)(xi)的(de)(de)回(hui)水(shui)(shui)進(jin)(jin)行(xing)(xing)(xing)觀察(cha)(cha),導致水(shui)(shui)利(li)工程內(nei)帷幕(mu)灌漿(jiang)施工技(ji)(ji)(ji)(ji)術(shu)(shu)沒(mei)有(you)得到良好的(de)(de)實施,對(dui)(dui)整個(ge)(ge)水(shui)(shui)利(li)工程產(chan)生了很(hen)嚴重的(de)(de)后果(guo)。

(四)壓水實驗

縫(feng)隙沖洗完(wan)成以后,還需要(yao)(yao)進(jin)行壓(ya)(ya)水(shui)(shui)(shui)(shui)(shui)試(shi)(shi)驗(yan),壓(ya)(ya)水(shui)(shui)(shui)(shui)(shui)試(shi)(shi)驗(yan)時(shi)(shi)可(ke)采(cai)用(yong)(yong)單(dan)點法進(jin)行,壓(ya)(ya)水(shui)(shui)(shui)(shui)(shui)試(shi)(shi)驗(yan)的(de)(de)(de)(de)(de)壓(ya)(ya)力(li)也應該設置(zhi)在(zai)此(ci)段灌漿(jiang)(jiang)壓(ya)(ya)力(li)的(de)(de)(de)(de)(de)80%以下,且不能超過(guo)1MPa。水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)內帷幕灌漿(jiang)(jiang)施工(gong)(gong)技術之(zhi)所以會在(zai)水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)中得到一(yi)定的(de)(de)(de)(de)(de)應用(yong)(yong)研究,就是因為在(zai)各個(ge)方面的(de)(de)(de)(de)(de)要(yao)(yao)求(qiu)(qiu)都非常的(de)(de)(de)(de)(de)嚴格(ge),只有這(zhe)樣才能保(bao)證水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)內帷幕灌漿(jiang)(jiang)施工(gong)(gong)技術在(zai)實施的(de)(de)(de)(de)(de)時(shi)(shi)候(hou),達到一(yi)個(ge)較(jiao)好(hao)的(de)(de)(de)(de)(de)效果(guo)。在(zai)壓(ya)(ya)水(shui)(shui)(shui)(shui)(shui)實驗(yan)方面,水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)內帷幕灌漿(jiang)(jiang)施工(gong)(gong)技術做到一(yi)個(ge)高端的(de)(de)(de)(de)(de)標(biao)準,要(yao)(yao)求(qiu)(qiu)壓(ya)(ya)力(li)設置(zhi)在(zai)此(ci)段灌漿(jiang)(jiang)壓(ya)(ya)力(li)的(de)(de)(de)(de)(de)百分之(zhi)八十以下,這(zhe)是一(yi)個(ge)國際化(hua)的(de)(de)(de)(de)(de)標(biao)準,同(tong)時(shi)(shi)也符合現階段水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)的(de)(de)(de)(de)(de)要(yao)(yao)求(qiu)(qiu),能夠對水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)產生較(jiao)大(da)的(de)(de)(de)(de)(de)積(ji)極影響。另一(yi)方面,水(shui)(shui)(shui)(shui)(shui)利(li)(li)(li)工(gong)(gong)程(cheng)內帷幕灌漿(jiang)(jiang)施工(gong)(gong)技術的(de)(de)(de)(de)(de)壓(ya)(ya)水(shui)(shui)(shui)(shui)(shui)實驗(yan),還要(yao)(yao)求(qiu)(qiu)壓(ya)(ya)力(li)不能超過(guo)1MPa。

三、水利工程內帷幕灌漿施工技術中(zhong)常見問題(ti)的處理

(一)灌漿中斷問題

為了避(bi)免灌(guan)漿(jiang)(jiang)中(zhong)(zhong)斷(duan)問(wen)題(ti)(ti)的(de)發生(sheng),在帷(wei)幕(mu)(mu)灌(guan)漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)之(zhi)前(qian)和施(shi)工(gong)(gong)(gong)過程(cheng)(cheng)中(zhong)(zhong),施(shi)工(gong)(gong)(gong)單位(wei)應該(gai)做好全面的(de)預防措施(shi)。施(shi)工(gong)(gong)(gong)前(qian)需(xu)要(yao)(yao)對全部(bu)的(de)機(ji)械、設備(bei)進(jin)(jin)行質量檢查,輸(shu)漿(jiang)(jiang)管材要(yao)(yao)按照標準進(jin)(jin)行選擇,灌(guan)漿(jiang)(jiang)過程(cheng)(cheng)中(zhong)(zhong)應該(gai)由專人負責隨時(shi)(shi)(shi)檢查管材是(shi)否存在連接不牢固、破損或(huo)者堵(du)塞問(wen)題(ti)(ti)。對于水利工(gong)(gong)(gong)程(cheng)(cheng)內帷(wei)幕(mu)(mu)灌(guan)漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術而言,在施(shi)行的(de)過程(cheng)(cheng)中(zhong)(zhong),灌(guan)漿(jiang)(jiang)中(zhong)(zhong)斷(duan)是(shi)一(yi)個(ge)比(bi)較主(zhu)要(yao)(yao)的(de)問(wen)題(ti)(ti),需(xu)要(yao)(yao)經(jing)常進(jin)(jin)行檢查,隨時(shi)(shi)(shi)準備(bei)彌補(bu),一(yi)旦出(chu)現(xian)中(zhong)(zhong)斷(duan),必須讓技術人員進(jin)(jin)行處(chu)理(li),避(bi)免長(chang)時(shi)(shi)(shi)間(jian)的(de)停留。灌(guan)漿(jiang)(jiang)中(zhong)(zhong)斷(duan)問(wen)題(ti)(ti)對于水利工(gong)(gong)(gong)程(cheng)(cheng)內帷(wei)幕(mu)(mu)灌(guan)漿(jiang)(jiang)施(shi)工(gong)(gong)(gong)技術而言,可大可小,如果及時(shi)(shi)(shi)處(chu)理(li),就不會出(chu)現(xian)較大的(de)問(wen)題(ti)(ti),但(dan)如果得(de)不到(dao)重視,因為拖拉的(de)時(shi)(shi)(shi)間(jian)過長(chang),就會引起連鎖(suo)效應,對整個(ge)水利工(gong)(gong)(gong)程(cheng)(cheng)產生(sheng)較大的(de)消(xiao)極影響。

(二)串漿問題

為了預防(fang)串(chuan)漿(jiang)現象的發生(sheng)(sheng),可同時(shi)對(dui)串(chuan)漿(jiang)孔(kong)和灌(guan)漿(jiang)孔(kong)進行(xing)灌(guan)漿(jiang),并且要保(bao)證(zheng)每個(ge)孔(kong)都(dou)有(you)一(yi)臺灌(guan)漿(jiang)泵進行(xing)灌(guan)漿(jiang)作業。串(chuan)漿(jiang)問(wen)題(ti)在(zai)現階段的發展(zhan)中,幾乎很少發生(sheng)(sheng),因(yin)為機械化作業高度(du)發達的今天(tian),已經能(neng)夠保(bao)證(zheng)每個(ge)孔(kong)都(dou)能(neng)有(you)一(yi)臺灌(guan)漿(jiang)泵進行(xing)灌(guan)漿(jiang)作業,但是(shi),不能(neng)對(dui)串(chuan)漿(jiang)問(wen)題(ti)疏忽。在(zai)水利工(gong)(gong)程內帷幕灌(guan)漿(jiang)施工(gong)(gong)技術的應(ying)用中,串(chuan)漿(jiang)問(wen)題(ti)也有(you)發生(sheng)(sheng),原因(yin)在(zai)于(yu),有(you)時(shi)候(hou)機械設備由(you)于(yu)一(yi)些原因(yin)會出現事故,或者工(gong)(gong)作人員(yuan)的疏忽,會導致串(chuan)漿(jiang)的問(wen)題(ti)發生(sheng)(sheng),這對(dui)水利工(gong)(gong)程來說是(shi)非常不利的,在(zai)現階段的發展(zhan)中,依然需要對(dui)串(chuan)漿(jiang)問(wen)題(ti)嚴謹的對(dui)待(dai),加(jia)強防(fang)范。

總結:本文對水(shui)(shui)利(li)工程(cheng)內(nei)(nei)帷幕灌漿施工技(ji)術(shu)的(de)(de)(de)應用(yong)進(jin)(jin)行(xing)了一定(ding)的(de)(de)(de)研究,從各個方面來(lai)(lai)說,水(shui)(shui)利(li)工程(cheng)內(nei)(nei)帷幕灌漿施工技(ji)術(shu)經(jing)過技(ji)術(shu)人(ren)員的(de)(de)(de)不懈(xie)努力,終(zhong)于獲(huo)(huo)得(de)了較(jiao)大(da)(da)的(de)(de)(de)發展(zhan)(zhan),對于現(xian)階段而言(yan),已經(jing)能(neng)(neng)夠對水(shui)(shui)利(li)工程(cheng)產生較(jiao)大(da)(da)的(de)(de)(de)積極影響。但在(zai)將來(lai)(lai)的(de)(de)(de)發展(zhan)(zhan)中(zhong)(zhong),面對新(xin)的(de)(de)(de)環境和新(xin)的(de)(de)(de)工程(cheng),技(ji)術(shu)上和設備上的(de)(de)(de)優勢還需要(yao)進(jin)(jin)一步的(de)(de)(de)加強,只有這(zhe)樣才(cai)能(neng)(neng)獲(huo)(huo)得(de)進(jin)(jin)一步的(de)(de)(de)突破。同時,我們需要(yao)與(yu)國際(ji)上的(de)(de)(de)技(ji)術(shu)進(jin)(jin)行(xing)一定(ding)的(de)(de)(de)交流,這(zhe)樣可(ke)以更好的(de)(de)(de)促(cu)進(jin)(jin)國內(nei)(nei)技(ji)術(shu)的(de)(de)(de)發展(zhan)(zhan),相(xiang)信在(zai)將來(lai)(lai)的(de)(de)(de)發展(zhan)(zhan)中(zhong)(zhong),可(ke)以在(zai)水(shui)(shui)利(li)工程(cheng)內(nei)(nei)帷幕灌漿施工技(ji)術(shu)的(de)(de)(de)應用(yong)中(zhong)(zhong),獲(huo)(huo)得(de)更大(da)(da)的(de)(de)(de)建樹(shu)。

參考文獻:

篇8

DOI:10.16640/ki.37-1222/t.2017.14.104

在(zai)水(shui)利(li)工(gong)(gong)(gong)(gong)程(cheng)的(de)(de)(de)(de)建設施工(gong)(gong)(gong)(gong)中,帷幕灌漿(jiang)技術(shu)具(ju)有(you)較(jiao)強(qiang)的(de)(de)(de)(de)實(shi)用性(xing),并且在(zai)實(shi)際的(de)(de)(de)(de)施工(gong)(gong)(gong)(gong)操作中得到了較(jiao)為廣(guang)泛的(de)(de)(de)(de)應(ying)用,可(ke)(ke)有(you)效的(de)(de)(de)(de)防(fang)止在(zai)底部巖石部位出(chu)現(xian)(xian)滲漏(lou)的(de)(de)(de)(de)問題,提高水(shui)利(li)工(gong)(gong)(gong)(gong)程(cheng)的(de)(de)(de)(de)安全(quan)性(xing)能。在(zai)M行(xing)施工(gong)(gong)(gong)(gong)操作的(de)(de)(de)(de)過程(cheng)中,應(ying)根據實(shi)際的(de)(de)(de)(de)情況選取相(xiang)(xiang)應(ying)規格的(de)(de)(de)(de)地質鉆(zhan)機,并在(zai)需要(yao)加固(gu)防(fang)滲處理的(de)(de)(de)(de)部位進(jin)行(xing)帷幕鉆(zhan)的(de)(de)(de)(de)鉆(zhan)進(jin)施工(gong)(gong)(gong)(gong),通(tong)過注(zhu)入水(shui)泥漿(jiang)液,在(zai)水(shui)泥漿(jiang)液固(gu)結(jie)之后(hou)形成相(xiang)(xiang)對(dui)較(jiao)為密實(shi)的(de)(de)(de)(de)帷幕。此外,水(shui)流在(zai)土層之間的(de)(de)(de)(de)流動可(ke)(ke)能會導致內(nei)滲問題的(de)(de)(de)(de)出(chu)現(xian)(xian),通(tong)過帷幕灌漿(jiang)也(ye)可(ke)(ke)以預防(fang)這(zhe)種滲透現(xian)(xian)象。

1 工程案例

某水利樞紐工(gong)(gong)(gong)程(cheng)(cheng)(cheng)建設(she)(she)的(de)(de)(de)(de)(de)過(guo)程(cheng)(cheng)(cheng)中,在(zai)大(da)壩基礎部分(fen)采(cai)用(yong)帷(wei)幕(mu)(mu)灌(guan)漿(jiang)技(ji)術(shu)施(shi)工(gong)(gong)(gong)。經過(guo)技(ji)術(shu)人(ren)員對(dui)現場地質情況(kuang)的(de)(de)(de)(de)(de)勘測和(he)計(ji)算(suan),在(zai)本(ben)(ben)次水利工(gong)(gong)(gong)程(cheng)(cheng)(cheng)施(shi)工(gong)(gong)(gong)中所需(xu)要(yao)帷(wei)幕(mu)(mu)鉆孔(kong)(kong)的(de)(de)(de)(de)(de)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)量為(wei)6752m,共有帷(wei)幕(mu)(mu)灌(guan)漿(jiang)孔(kong)(kong)422個(ge),檢查孔(kong)(kong)43個(ge)。根據規劃的(de)(de)(de)(de)(de)要(yao)求確(que)定出工(gong)(gong)(gong)程(cheng)(cheng)(cheng)的(de)(de)(de)(de)(de)防滲墻軸線,保證防滲帷(wei)幕(mu)(mu)的(de)(de)(de)(de)(de)走向與此保持一(yi)(yi)致,采(cai)用(yong)單排(pai)布置的(de)(de)(de)(de)(de)方式。一(yi)(yi)共分(fen)為(wei)三序來(lai)開展(zhan)施(shi)工(gong)(gong)(gong)作業,最(zui)終(zhong)的(de)(de)(de)(de)(de)孔(kong)(kong)洞間距設(she)(she)計(ji)為(wei)2.5m,為(wei)了達到(dao)良好(hao)的(de)(de)(de)(de)(de)防滲效果,帷(wei)幕(mu)(mu)應深入基層巖石16m。按照本(ben)(ben)工(gong)(gong)(gong)程(cheng)(cheng)(cheng)的(de)(de)(de)(de)(de)實際要(yao)求,將(jiang)帷(wei)幕(mu)(mu)的(de)(de)(de)(de)(de)透水率設(she)(she)計(ji)為(wei),并參照試數據制定出科學的(de)(de)(de)(de)(de)施(shi)工(gong)(gong)(gong)方案。采(cai)用(yong)回轉式鉆機,高壓(ya)灌(guan)漿(jiang)泵的(de)(de)(de)(de)(de)額定壓(ya)力為(wei)10MPa。

2 水(shui)利工程中帷幕灌漿(jiang)施(shi)工技術(shu)的應用分析

2.1 施工(gong)前(qian)的準備工(gong)作

在施(shi)(shi)工(gong)(gong)開始(shi)之前需要做好相(xiang)應(ying)的(de)(de)準備工(gong)(gong)作(zuo)(zuo),保證帷(wei)幕灌(guan)漿(jiang)施(shi)(shi)工(gong)(gong)能(neng)夠正常的(de)(de)進(jin)(jin)行。首先(xian)是對于灌(guan)漿(jiang)材(cai)料的(de)(de)準備,根據水(shui)利工(gong)(gong)程(cheng)(cheng)的(de)(de)實際情況選取(qu)相(xiang)應(ying)規格(ge)的(de)(de)水(shui)泥(ni)(ni),其(qi)初(chu)凝(ning)時(shi)間、強度等相(xiang)關的(de)(de)因素(su)滿(man)足施(shi)(shi)工(gong)(gong)的(de)(de)要求,檢查水(shui)泥(ni)(ni)的(de)(de)合(he)格(ge)證以及(ji)出廠(chang)證明,保證材(cai)料的(de)(de)質(zhi)(zhi)量。待材(cai)料運(yun)送(song)至施(shi)(shi)工(gong)(gong)現場(chang),分批進(jin)(jin)行檢測工(gong)(gong)作(zuo)(zuo),質(zhi)(zhi)量不(bu)合(he)格(ge)的(de)(de)材(cai)料禁(jin)止應(ying)用在灌(guan)漿(jiang)施(shi)(shi)工(gong)(gong)中。質(zhi)(zhi)量驗(yan)收合(he)格(ge)的(de)(de)材(cai)料還(huan)需做好存放(fang)工(gong)(gong)作(zuo)(zuo),避免在施(shi)(shi)工(gong)(gong)的(de)(de)過(guo)程(cheng)(cheng)中出現材(cai)料固結、質(zhi)(zhi)變的(de)(de)現象。

2.2 鉆孔施工

在(zai)(zai)鉆(zhan)(zhan)(zhan)機安(an)裝(zhuang)時應(ying)保(bao)證穩定(ding)性,避免在(zai)(zai)鉆(zhan)(zhan)(zhan)進的(de)(de)(de)過程中出(chu)現位移的(de)(de)(de)現象。待鉆(zhan)(zhan)(zhan)機安(an)裝(zhuang)就位之后(hou),首先(xian)進行先(xian)導(dao)孔的(de)(de)(de)鉆(zhan)(zhan)(zhan)進,先(xian)導(dao)孔的(de)(de)(de)分段與整(zheng)(zheng)體分段保(bao)持一致。根據(ju)主帷幕(mu)的(de)(de)(de)設計(ji)深度確定(ding)先(xian)導(dao)孔的(de)(de)(de)深度,一般先(xian)導(dao)孔的(de)(de)(de)深度大于設計(ji)深度5―10m左右。其(qi)次是(shi)灌漿孔的(de)(de)(de)鉆(zhan)(zhan)(zhan)進工作,嚴格(ge)按照施工方案的(de)(de)(de)設計(ji)的(de)(de)(de)要求確定(ding)鉆(zhan)(zhan)(zhan)孔的(de)(de)(de)位置,其(qi)中存在(zai)(zai)的(de)(de)(de)誤差(cha)應(ying)控制在(zai)(zai)100mm之內。在(zai)(zai)鉆(zhan)(zhan)(zhan)進時保(bao)證鉆(zhan)(zhan)(zhan)頭的(de)(de)(de)垂直度,每鉆(zhan)(zhan)(zhan)進10cm左右進行一次孔洞傾斜程度的(de)(de)(de)檢測,一旦出(chu)現傾斜過大的(de)(de)(de)情況,需要及時的(de)(de)(de)進行調整(zheng)(zheng),若傾斜的(de)(de)(de)程度超過了規定(ding)的(de)(de)(de)標準,還(huan)應(ying)該采取(qu)重新鉆(zhan)(zhan)(zhan)孔的(de)(de)(de)處(chu)理措施。

2.3 壓水試驗

在(zai)(zai)帷幕灌漿施(shi)工的(de)過(guo)程中(zhong),為了保證巖石的(de)條件與設計(ji)方案中(zhong)的(de)一(yi)致,還需(xu)要(yao)(yao)(yao)進(jin)行(xing)壓(ya)(ya)水(shui)試(shi)(shi)(shi)驗,一(yi)般間(jian)隔(ge)16m就需(xu)要(yao)(yao)(yao)選取注(zhu)漿孔(kong)和(he)檢查孔(kong)來(lai)(lai)分段試(shi)(shi)(shi)驗。壓(ya)(ya)水(shui)時間(jian)設計(ji)為20min,在(zai)(zai)此過(guo)程中(zhong)要(yao)(yao)(yao)注(zhu)重對壓(ya)(ya)入流量(liang)(liang)的(de)觀察記錄。在(zai)(zai)進(jin)行(xing)正規壓(ya)(ya)水(shui)試(shi)(shi)(shi)驗時,待確保注(zhu)入率(lv)處(chu)于穩定狀態(tai)時,可開(kai)始對注(zhu)入率(lv)進(jin)行(xing)測量(liang)(liang),其中(zhong)測量(liang)(liang)次數(shu)不得低于4次,直(zhi)至試(shi)(shi)(shi)驗結果達到(dao)相(xiang)關(guan)標準之后才(cai)能結束。在(zai)(zai)壓(ya)(ya)水(shui)試(shi)(shi)(shi)驗進(jin)行(xing)的(de)過(guo)程中(zhong),必(bi)須按照相(xiang)關(guan)標準的(de)要(yao)(yao)(yao)求將涉及到(dao)的(de)施(shi)工參數(shu)記錄下(xia)來(lai)(lai)。

2.4 灌漿施工

首先(xian)應(ying)(ying)根據水利工(gong)程的(de)具(ju)體要求(qiu),在充(chong)分了解地質條件(jian)以及各項(xiang)原材料的(de)基礎上確(que)定(ding)水泥漿(jiang)液(ye)的(de)配合比(bi)例。并確(que)定(ding)適當(dang)的(de)拌合時間,若采用高度攪拌機,應(ying)(ying)保(bao)持在30s以上。在確(que)保(bao)水泥漿(jiang)液(ye)的(de)質量(liang)滿(man)足施工(gong)要求(qiu)之后(hou),進行(xing)漿(jiang)液(ye)的(de)輸送作業,管道應(ying)(ying)保(bao)持通暢。

3 水利工程(cheng)中帷幕(mu)灌漿施(shi)工的質量(liang)控制措施(shi)

3.1 加強原(yuan)材料的質量控制

原(yuan)材料(liao)(liao)對(dui)(dui)于(yu)帷(wei)幕灌漿(jiang)(jiang)施工(gong)有(you)著重要(yao)的(de)(de)(de)(de)影響(xiang),如果(guo)原(yuan)材料(liao)(liao)的(de)(de)(de)(de)質量(liang)不能(neng)滿(man)足相關(guan)的(de)(de)(de)(de)標準(zhun),將會埋下潛在(zai)(zai)的(de)(de)(de)(de)質量(liang)隱患,因此必須(xu)要(yao)加強對(dui)(dui)于(yu)原(yuan)材料(liao)(liao)質量(liang)的(de)(de)(de)(de)控(kong)制措施。首先體現(xian)在(zai)(zai)原(yuan)材料(liao)(liao)采購的(de)(de)(de)(de)階段,應選擇正規的(de)(de)(de)(de)生產廠家,在(zai)(zai)其運送至施工(gong)現(xian)場之后,還需要(yao)對(dui)(dui)對(dui)(dui)材料(liao)(liao)進行取樣檢測,把好材料(liao)(liao)的(de)(de)(de)(de)質量(liang)關(guan),保(bao)證帷(wei)幕注漿(jiang)(jiang)施工(gong)中(zhong)所用(yong)(yong)的(de)(de)(de)(de)材料(liao)(liao)達到相關(guan)標準(zhun)的(de)(de)(de)(de)要(yao)求(qiu)。其次(ci)是在(zai)(zai)原(yuan)材料(liao)(liao)使用(yong)(yong)的(de)(de)(de)(de)過(guo)程(cheng)中(zhong)也需要(yao)定期檢測原(yuan)材料(liao)(liao)的(de)(de)(de)(de)質量(liang),避免(mian)在(zai)(zai)存放(fang)的(de)(de)(de)(de)過(guo)程(cheng)中(zhong)出現(xian)質量(liang)的(de)(de)(de)(de)變化。對(dui)(dui)于(yu)在(zai)(zai)灌漿(jiang)(jiang)施工(gong)中(zhong)的(de)(de)(de)(de)所用(yong)(yong)的(de)(de)(de)(de)水,應與(yu)水工(gong)混凝(ning)土用(yong)(yong)水的(de)(de)(de)(de)要(yao)求(qiu)保(bao)持一(yi)致,禁止(zhi)應用(yong)(yong)含有(you)雜(za)質或者油類有(you)機物(wu)的(de)(de)(de)(de)水源。

3.2 鉆孔施(shi)工的質(zhi)量(liang)控制(zhi)

在進(jin)(jin)行(xing)鉆孔(kong)(kong)(kong)施(shi)(shi)工(gong)的(de)(de)工(gong)程中,應(ying)(ying)確保孔(kong)(kong)(kong)洞(dong)的(de)(de)位置(zhi)滿足施(shi)(shi)工(gong)方(fang)(fang)(fang)案設計的(de)(de)要(yao)求,為了(le)方(fang)(fang)(fang)便管理需做好序號的(de)(de)標(biao)(biao)記。為了(le)確定孔(kong)(kong)(kong)洞(dong)巖石(shi)的(de)(de)各項指標(biao)(biao),一(yi)般應(ying)(ying)按照規(gui)定的(de)(de)標(biao)(biao)準對檢(jian)查孔(kong)(kong)(kong)進(jin)(jin)行(xing)鉆取芯(xin)樣的(de)(de)處理方(fang)(fang)(fang)式,并形成相應(ying)(ying)的(de)(de)書面(mian)文(wen)件,以方(fang)(fang)(fang)便后期的(de)(de)查閱。若在孔(kong)(kong)(kong)洞(dong)鉆進(jin)(jin)的(de)(de)過(guo)程中出(chu)(chu)現(xian)(xian)(xian)(xian)孔(kong)(kong)(kong)洞(dong)坍塌或者(zhe)漏水(shui)的(de)(de)問題,可先采取灌漿處理的(de)(de)措施(shi)(shi),待達到標(biao)(biao)準之后在繼(ji)續(xu)進(jin)(jin)行(xing)鉆進(jin)(jin)作業,對于出(chu)(chu)現(xian)(xian)(xian)(xian)的(de)(de)漏水(shui)現(xian)(xian)(xian)(xian)象應(ying)(ying)分析其出(chu)(chu)現(xian)(xian)(xian)(xian)的(de)(de)具(ju)體原因。在灌漿孔(kong)(kong)(kong)清洗(xi)施(shi)(shi)工(gong)完畢之后,應(ying)(ying)及時(shi)開展灌漿作業,防(fang)止出(chu)(chu)現(xian)(xian)(xian)(xian)中斷(duan)時(shi)間過(guo)長(chang)的(de)(de)現(xian)(xian)(xian)(xian)象。

3.3 灌漿(jiang)施工的(de)質量控制

根據灌(guan)(guan)漿(jiang)(jiang)施(shi)工的(de)(de)實際(ji)情況確定漿(jiang)(jiang)液的(de)(de)濃度(du),在(zai)不同的(de)(de)階段(duan)來適當的(de)(de)調整漿(jiang)(jiang)液的(de)(de)濃度(du)。如(ru)果在(zai)灌(guan)(guan)漿(jiang)(jiang)時出(chu)現壓力或者注入率突(tu)變(bian)的(de)(de)情況,必須及時的(de)(de)采取(qu)(qu)相(xiang)(xiang)(xiang)應的(de)(de)處理(li)措(cuo)施(shi)。當注入率在(zai)0.4l/min以(yi)(yi)內時,再持(chi)續(xu)注漿(jiang)(jiang)60min以(yi)(yi)后(hou),方可停止灌(guan)(guan)漿(jiang)(jiang)施(shi)工。待孔(kong)洞(dong)內部的(de)(de)漿(jiang)(jiang)液達到相(xiang)(xiang)(xiang)關的(de)(de)標(biao)準(zhun)之(zhi)后(hou),需要采取(qu)(qu)封孔(kong)處理(li)的(de)(de)措(cuo)施(shi),封填料所選用的(de)(de)水泥砂漿(jiang)(jiang)的(de)(de)水灰比控制在(zai)0.6以(yi)(yi)內,砂石的(de)(de)粒徑應小于(yu)(yu)0mm,并對(dui)回填料進行適當的(de)(de)密(mi)實。對(dui)于(yu)(yu)在(zai)灌(guan)(guan)漿(jiang)(jiang)施(shi)工中可能出(chu)現的(de)(de)返漿(jiang)(jiang)、返砂等問題,應對(dui)其進行具體(ti)分析之(zhi)后(hou),采取(qu)(qu)相(xiang)(xiang)(xiang)應的(de)(de)處理(li)措(cuo)施(shi)。

4 結束語

篇9

Abstract: the construction of now, there are many kinds of curtain wall, one of the main curtain wall glass curtain wall, including aluminium &granite curtain walls, stone curtain wall, etc. Due to the characteristics of curtain wall, determine the construction method and construction process and other building professional construction are different. With China's curtain wall construction of rapid development, construction project management of curtain wall puts forward new requirements, curtain wall construction to high quality, high benefit, we must in construction project management fluctuation kongfu. This paper mainly discusses the contemporary curtain wall construction enterprise project management present situation, the future trend of a brief narration.

Keywords: curtain wall construction; Project management; The present situation; The future trends of the

中圖分類號:C29文(wen)(wen)獻(xian)標識碼:A 文(wen)(wen)章編(bian)號:

隨(sui)著(zhu)新技(ji)術的(de)運用(yong)(yong)和建筑(zhu)材料的(de)更(geng)新換代(dai),建筑(zhu)事業(ye)迎來了(le)(le)快速的(de)發展。幕墻作(zuo)為建筑(zhu)施工(gong)(gong)的(de)重(zhong)要組成部(bu)分,也(ye)經歷(li)了(le)(le)由大眾(zhong)化向特(te)色化方向發展的(de)階段。在目前的(de)建筑(zhu)幕墻施工(gong)(gong)中(zhong),許(xu)多(duo)幕墻施工(gong)(gong)已經實現了(le)(le)建筑(zhu)物幕墻與節能(neng)減排目標的(de)有效結合(he),使幕墻發揮了(le)(le)更(geng)大的(de)作(zuo)用(yong)(yong)。

一、幕(mu)墻施工(gong)企業項目管理的現狀

目前(qian)幕墻施工(gong)企業(ye)項(xiang)目管理(li)經過了多年的發展,已經總結出了獨有的發展模式,當(dang)前(qian)幕墻施工(gong)企業(ye)項(xiang)目管理(li)主要呈現以下狀態:

1、目(mu)前幕墻施(shi)工企業(ye)項(xiang)目(mu)管理權(quan)力(li)相(xiang)對集中(zhong)

當代幕墻(qiang)施工(gong)企(qi)業(ye)(ye)的(de)規模(mo)已經(jing)由起初的(de)中小型分散企(qi)業(ye)(ye)發展(zhan)成為大(da)(da)中型的(de)集(ji)約化(hua)企(qi)業(ye)(ye),在這些企(qi)業(ye)(ye)中,已經(jing)形成了獨(du)具特色的(de)管(guan)理(li)模(mo)式(shi)。由于(yu)幕墻(qiang)施工(gong)企(qi)業(ye)(ye)規模(mo)較大(da)(da),在建筑施工(gong)中,涉及環(huan)節多(duo),包括材料(liao)采購、人(ren)員組織、設(she)備租用、工(gong)資支(zhi)付等等。對于(yu)這些環(huan)節,多(duo)數的(de)幕墻(qiang)施工(gong)企(qi)業(ye)(ye)采取的(de)管(guan)理(li)模(mo)式(shi)是管(guan)理(li)權(quan)力(li)集(ji)中化(hua)。這種管(guan)理(li)模(mo)式(shi)的(de)好(hao)處在于(yu)公(gong)司可以(yi)對施工(gong)環(huan)節進行有效的(de)管(guan)控,可以(yi)最大(da)(da)程(cheng)度發揮管(guan)理(li)效力(li)。

2、目(mu)前幕(mu)墻施工企業項(xiang)目(mu)管理(li)注重對(dui)施工方法的總結

由于(yu)幕(mu)墻種類很多(duo),可以分為玻璃幕(mu)墻、鋁(lv)板幕(mu)墻,石材幕(mu)墻等,對這些幕(mu)墻在(zai)施(shi)(shi)(shi)工(gong)(gong)的(de)(de)(de)時(shi)候施(shi)(shi)(shi)工(gong)(gong)方法(fa)(fa)是不(bu)同的(de)(de)(de)。通過長期(qi)的(de)(de)(de)施(shi)(shi)(shi)工(gong)(gong),幕(mu)墻施(shi)(shi)(shi)工(gong)(gong)企業積累了豐富的(de)(de)(de)施(shi)(shi)(shi)工(gong)(gong)經驗,對每一種材質的(de)(de)(de)幕(mu)墻采(cai)取(qu)何種施(shi)(shi)(shi)工(gong)(gong)方法(fa)(fa)均有(you)深入的(de)(de)(de)研究,能(neng)夠做到(dao)按照材質選取(qu)適當的(de)(de)(de)施(shi)(shi)(shi)工(gong)(gong)方法(fa)(fa),做到(dao)施(shi)(shi)(shi)工(gong)(gong)方法(fa)(fa)匹配。因此,在(zai)幕(mu)墻施(shi)(shi)(shi)工(gong)(gong)企業的(de)(de)(de)項(xiang)目管(guan)理中,注重(zhong)了對施(shi)(shi)(shi)工(gong)(gong)方法(fa)(fa)的(de)(de)(de)總結。

3、目前幕(mu)墻施工企業項目管(guan)理采用了項目承包責(ze)任制的管(guan)理模式

由(you)于(yu)幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)是建(jian)筑施(shi)(shi)工(gong)(gong)(gong)的(de)門面(mian)工(gong)(gong)(gong)程,對整個(ge)建(jian)筑影響(xiang)很大,如果幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)質量不(bu)過關,將會(hui)對整個(ge)幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)企業造成惡劣(lie)的(de)影響(xiang)。為了有(you)效保證幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)質量,并且(qie)達到(dao)降低成本提高效益的(de)目的(de),當前(qian)的(de)幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)企業項(xiang)目管(guan)理(li)(li)紛(fen)紛(fen)采用項(xiang)目承包責任(ren)制(zhi)的(de)管(guan)理(li)(li)模式,將項(xiang)目管(guan)理(li)(li)目標層(ceng)層(ceng)分解,落(luo)實到(dao)責任(ren)人,使幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)項(xiang)目中的(de)各個(ge)環節都處于(yu)有(you)效管(guan)理(li)(li)之下。采用隔離承包責任(ren)制(zhi)管(guan)理(li)(li)模式以來,幕(mu)墻(qiang)施(shi)(shi)工(gong)(gong)(gong)企業項(xiang)目管(guan)理(li)(li)得(de)以高效運行(xing)。

二(er)、如(ru)何實(shi)現幕(mu)墻施(shi)工企(qi)業項目管(guan)理的高(gao)效化和優質化

幕(mu)墻施工企業要想實現項(xiang)目(mu)管(guan)(guan)理的(de)高效化和(he)優質化,就要對施工過程進行(xing)優化,提(ti)高項(xiang)目(mu)管(guan)(guan)理的(de)執(zhi)行(xing)力(li)度,提(ti)升項(xiang)目(mu)管(guan)(guan)理的(de)品質。

1、建立完善的項目(mu)管理制度,保證(zheng)幕(mu)墻施工企業項目(mu)管理有(you)制度可依(yi)

幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye)要想(xiang)(xiang)實現項(xiang)(xiang)目(mu)管理(li)(li)(li)的(de)高效化和(he)(he)優(you)質(zhi)化,首先就要從管理(li)(li)(li)制(zhi)(zhi)度(du)入手(shou),建(jian)(jian)立完善的(de)項(xiang)(xiang)目(mu)管理(li)(li)(li)制(zhi)(zhi)度(du)。目(mu)前的(de)幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye),活(huo)源方(fang)面有充足的(de)保(bao)證,對施(shi)工(gong)質(zhi)量(liang)的(de)要求(qiu)逐漸提高,要想(xiang)(xiang)保(bao)證施(shi)工(gong)質(zhi)量(liang),除了要做好質(zhi)量(liang)控制(zhi)(zhi)工(gong)作(zuo)之外,建(jian)(jian)立完善的(de)項(xiang)(xiang)目(mu)管理(li)(li)(li)制(zhi)(zhi)度(du)也是(shi)極其必要的(de)。在幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye)中(zhong),項(xiang)(xiang)目(mu)管理(li)(li)(li)制(zhi)(zhi)度(du)是(shi)綱,是(shi)指導施(shi)工(gong)項(xiang)(xiang)目(mu)管理(li)(li)(li)的(de)依(yi)據,建(jian)(jian)立完善的(de)項(xiang)(xiang)目(mu)管理(li)(li)(li)制(zhi)(zhi)度(du),不但是(shi)幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye)質(zhi)量(liang)工(gong)作(zuo)的(de)需要,也是(shi)幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye)內部項(xiang)(xiang)目(mu)管理(li)(li)(li)的(de)必然要求(qiu),因(yin)此(ci),要想(xiang)(xiang)實現幕(mu)墻(qiang)施(shi)工(gong)企(qi)業(ye)項(xiang)(xiang)目(mu)管理(li)(li)(li)的(de)高效化和(he)(he)優(you)質(zhi)化,就要建(jian)(jian)立完善的(de)項(xiang)(xiang)目(mu)管理(li)(li)(li)制(zhi)(zhi)度(du)。

2、構建完(wan)整的項(xiang)目(mu)管理(li)體系(xi),保證幕墻施工(gong)企(qi)業項(xiang)目(mu)管理(li)高效化(hua)

幕墻(qiang)施工企業(ye)(ye)中,要想使整個項(xiang)(xiang)目(mu)管(guan)理(li)高(gao)效化、優(you)質化,就(jiu)要構建完(wan)整的項(xiang)(xiang)目(mu)管(guan)理(li)體系,發揮項(xiang)(xiang)目(mu)管(guan)理(li)體系的作用,為幕墻(qiang)施工企業(ye)(ye)項(xiang)(xiang)目(mu)管(guan)理(li)服務。構建完(wan)整的項(xiang)(xiang)目(mu)管(guan)理(li)體系,可(ke)以(yi)采取以(yi)下措(cuo)施:

(1)優化施(shi)工項目(mu)組織結構

幕(mu)墻施(shi)工(gong)項(xiang)目(mu)管理(li)(li)的重點(dian)在于要構(gou)建合理(li)(li)的組織(zhi)結構(gou),要對現有的組織(zhi)結構(gou)進(jin)行(xing)優化(hua),成立強有力的施(shi)工(gong)項(xiang)目(mu)經理(li)(li)部,對施(shi)工(gong)人員(yuan)進(jin)行(xing)合理(li)(li)的調(diao)配(pei)和運用,達到提(ti)高(gao)施(shi)工(gong)質(zhi)量,提(ti)高(gao)施(shi)工(gong)效率和提(ti)升施(shi)工(gong)品質(zhi)的目(mu)的。因此,優化(hua)施(shi)工(gong)項(xiang)目(mu)組織(zhi)結構(gou)是(shi)保證幕(mu)墻施(shi)工(gong)項(xiang)目(mu)高(gao)效化(hua)優質(zhi)化(hua)的有效手段。

(2)編制詳細的(de)幕墻施(shi)工組織設計(ji)

施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)組(zu)織(zhi)(zhi)設(she)計(ji)(ji)是指導施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)的(de)綱領性文件,體現了幕墻施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)中的(de)所有(you)施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)細節和施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)方(fang)法(fa),因此,施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)組(zu)織(zhi)(zhi)設(she)計(ji)(ji)中必須對施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)細節和施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)方(fang)法(fa)進行詳(xiang)細的(de)說明(ming),使(shi)(shi)施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)組(zu)織(zhi)(zhi)設(she)計(ji)(ji)成(cheng)為指導幕墻施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)的(de)工(gong)(gong)(gong)(gong)(gong)藝性文件。因此,有(you)必要加強幕墻施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)組(zu)織(zhi)(zhi)設(she)計(ji)(ji)的(de)編制工(gong)(gong)(gong)(gong)(gong)作,使(shi)(shi)施(shi)(shi)(shi)工(gong)(gong)(gong)(gong)(gong)組(zu)織(zhi)(zhi)設(she)計(ji)(ji)盡可能(neng)地(di)詳(xiang)細化。

(3)優化成本管理系統和生產指揮(hui)系統

在幕(mu)墻施工(gong)(gong)(gong)過(guo)程(cheng)中,成本管(guan)理(li)系(xi)(xi)統(tong)(tong)和(he)生產指揮(hui)系(xi)(xi)統(tong)(tong)是兩(liang)大(da)主要系(xi)(xi)統(tong)(tong),要想(xiang)實現幕(mu)墻施工(gong)(gong)(gong)項目(mu)管(guan)理(li)的高效化(hua)(hua)和(he)優質化(hua)(hua),就(jiu)要對這(zhe)兩(liang)個系(xi)(xi)統(tong)(tong)進行優化(hua)(hua)。優化(hua)(hua)成本管(guan)理(li)系(xi)(xi)統(tong)(tong)的目(mu)的在于可(ke)以降低施工(gong)(gong)(gong)成本提高效益,優化(hua)(hua)生產指揮(hui)系(xi)(xi)統(tong)(tong)的目(mu)的在于可(ke)以提高施工(gong)(gong)(gong)效率,提升施工(gong)(gong)(gong)品質。

3、營造以人為(wei)本的(de)項目(mu)管理氛圍,保證幕(mu)墻施工企業項目(mu)管理優質化

幕(mu)墻施工企(qi)業(ye)的(de)管(guan)理(li)(li)(li)制(zhi)度再完善,管(guan)理(li)(li)(li)制(zhi)度再優越(yue),最終都是由(you)人來執行的(de)。所以,幕(mu)墻施工企(qi)業(ye)需(xu)要加強對員工的(de)管(guan)理(li)(li)(li),營造以人為(wei)本的(de)項目管(guan)理(li)(li)(li)氛(fen)圍,使員工能夠(gou)發揮積極性和(he)主(zhu)動性,主(zhu)動的(de)投入(ru)到幕(mu)墻企(qi)業(ye)的(de)項目管(guan)理(li)(li)(li)中來,為(wei)企(qi)業(ye)的(de)項目管(guan)理(li)(li)(li)獻計(ji)獻策,從人員上保證幕(mu)墻施工項目管(guan)理(li)(li)(li)優質(zhi)化。

三(san)、幕墻施工企(qi)業項目管理的(de)未來趨勢

經過近些年的(de)(de)發(fa)(fa)展(zhan),幕墻施工企(qi)業(ye)項目管理(li)已經形(xing)成了自己(ji)的(de)(de)特點,并朝著健康(kang)快(kuai)速的(de)(de)方向發(fa)(fa)展(zhan),主(zhu)要發(fa)(fa)展(zhan)趨(qu)勢分為三(san)個方面:

1、幕墻施工企(qi)業項目管理朝著高效化方向(xiang)發(fa)展(zhan)

幕墻(qiang)施工企(qi)業的(de)(de)(de)(de)項(xiang)目(mu)管(guan)理(li)已經(jing)(jing)經(jing)(jing)過了多年的(de)(de)(de)(de)發(fa)展(zhan)(zhan),無論是(shi)制度方面(mian)還是(shi)執行力方面(mian)都(dou)取(qu)得了良(liang)好的(de)(de)(de)(de)效果,經(jing)(jing)歷過長期的(de)(de)(de)(de)發(fa)展(zhan)(zhan),幕墻(qiang)施工企(qi)業的(de)(de)(de)(de)項(xiang)目(mu)管(guan)理(li)已經(jing)(jing)積累了豐(feng)富的(de)(de)(de)(de)經(jing)(jing)驗,制度建設日趨(qu)完善,管(guan)理(li)體系(xi)日趨(qu)成熟,項(xiang)目(mu)管(guan)理(li)已經(jing)(jing)具備了快(kuai)(kuai)速發(fa)展(zhan)(zhan)的(de)(de)(de)(de)基礎,因此,基于上述條件,幕墻(qiang)項(xiang)目(mu)管(guan)理(li)朝著高效化方向快(kuai)(kuai)速發(fa)展(zhan)(zhan)。

2、幕墻施(shi)工企業項目(mu)管理朝(chao)著優質(zhi)化方向(xiang)發展

幕墻施(shi)工企(qi)(qi)(qi)業(ye)的項(xiang)目管理(li)除了要實(shi)現(xian)高效(xiao)化(hua)發(fa)(fa)(fa)展(zhan)之外,還要實(shi)現(xian)其優(you)(you)質化(hua)發(fa)(fa)(fa)展(zhan),優(you)(you)質化(hua)發(fa)(fa)(fa)展(zhan)是在(zai)(zai)和(he)高效(xiao)化(hua)發(fa)(fa)(fa)展(zhan)之上的更高的目標(biao)和(he)要求。在(zai)(zai)幕墻施(shi)工企(qi)(qi)(qi)業(ye)項(xiang)目管理(li)中,一直強調要實(shi)現(xian)企(qi)(qi)(qi)業(ye)的優(you)(you)質化(hua)服務和(he)高效(xiao)益發(fa)(fa)(fa)展(zhan),企(qi)(qi)(qi)業(ye)的優(you)(you)質化(hua)服務已經成為了建筑施(shi)工企(qi)(qi)(qi)業(ye)的總(zong)(zong)體(ti)發(fa)(fa)(fa)展(zhan)目標(biao)。因此,幕墻施(shi)工企(qi)(qi)(qi)業(ye)也(ye)應根據建筑企(qi)(qi)(qi)業(ye)的總(zong)(zong)體(ti)要求,確定優(you)(you)化(hua)服務為未來的發(fa)(fa)(fa)展(zhan)方向。

3、幕墻施工企業項(xiang)目(mu)管(guan)理(li)朝著(zhu)專業化方向發(fa)展

隨著建筑施(shi)工(gong)(gong)企(qi)(qi)業(ye)的(de)不(bu)斷(duan)發(fa)展(zhan),建筑企(qi)(qi)業(ye)已經(jing)建立起成熟的(de)施(shi)工(gong)(gong)體系和專(zhuan)業(ye)化(hua)的(de)施(shi)工(gong)(gong)隊伍。而幕墻(qiang)施(shi)工(gong)(gong)企(qi)(qi)業(ye)作為建筑施(shi)工(gong)(gong)企(qi)(qi)業(ye)的(de)一(yi)個(ge)分支,也在多(duo)年的(de)發(fa)展(zhan)中對(dui)幕墻(qiang)施(shi)工(gong)(gong)積累了(le)寶(bao)貴(gui)的(de)施(shi)工(gong)(gong)經(jing)驗,具備了(le)成熟的(de)、專(zhuan)業(ye)化(hua)的(de)施(shi)工(gong)(gong)隊伍。依靠(kao)專(zhuan)業(ye)化(hua)的(de)施(shi)工(gong)(gong)隊伍,幕墻(qiang)施(shi)工(gong)(gong)企(qi)(qi)業(ye)實現了(le)健康快速的(de)發(fa)展(zhan),因(yin)此,在未來的(de)發(fa)展(zhan)中,幕墻(qiang)施(shi)工(gong)(gong)企(qi)(qi)業(ye)項目管(guan)理將(jiang)會朝著專(zhuan)業(ye)化(hua)的(de)方向(xiang)發(fa)展(zhan)。

參考文獻:

[1] 劉德堂.簡述玻(bo)璃幕(mu)墻等(deng)的施工管理(li)分析[J].建筑機(ji)械化.2009年09期

篇10

Abstract: how to protect the highway-round coordinated and sustainable development is the company's core problem of the current highway. Through their own experience, put out a comprehensive analysis of the highway construction process and management issues, summed up the current highway maintenance and some measures of management.

Key words: highway; project management; maintenance

中(zhong)圖分(fen)類號:TU2 文(wen)獻標識碼(ma):A 文(wen)章(zhang)編號:2095-2104(2012)

隨(sui)著貴(gui)州(zhou)省(sheng)高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)建(jian)設(she)的(de)快速(su)(su)發展,高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)路(lu)(lu)面(mian)(mian)養護(hu)(hu)管(guan)(guan)理工作(zuo)越來越重(zhong)要(yao),維護(hu)(hu)管(guan)(guan)理工作(zuo)直接關(guan)系到(dao)高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)工程(cheng)的(de)使(shi)用(yong)質量上。如何提高(gao)(gao)高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)工程(cheng)的(de)管(guan)(guan)理維護(hu)(hu)水(shui)平(ping),保證(zheng)高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)的(de)暢(chang)、潔、綠、美,真正實現(xian)安全暢(chang)通(tong)路(lu)(lu)、經濟效益路(lu)(lu)、旅游觀光(guang)路(lu)(lu)的(de)服務目標(biao),能否達到(dao)科(ke)學養護(hu)(hu),能否安全高(gao)(gao)效、高(gao)(gao)質量低成(cheng)本地完成(cheng)養護(hu)(hu)任務成(cheng)為我們十分(fen)關(guan)注(zhu)的(de)重(zhong)要(yao)問題。下面(mian)(mian)簡(jian)要(yao)分(fen)析高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)工程(cheng)施工過程(cheng)與管(guan)(guan)理有關(guan)的(de)問題,并通(tong)過總(zong)結提出(chu)了(le)相應(ying)的(de)方法和高(gao)(gao)速(su)(su)公(gong)路(lu)(lu)維護(hu)(hu)管(guan)(guan)理的(de)一(yi)些對策。

一、施工管理中的常(chang)見問題及對(dui)策(ce)

1、人(ren)為(wei)因素的(de)有效控制(zhi)

建筑施(shi)工(gong)(gong)現場一(yi)般情況下投(tou)入的勞動力都比較多,很(hen)難對(dui)每個(ge)人(ren)(ren)員(yuan)實現有效控(kong)制(zhi)(zhi)。從某(mou)種(zhong)意義來(lai)講,人(ren)(ren)是(shi)決定工(gong)(gong)程質(zhi)量(liang)的關鍵因素。實際上,由于個(ge)別人(ren)(ren)工(gong)(gong)作的違規(gui)(gui)行(xing)為而引起(qi)的工(gong)(gong)程質(zhi)量(liang)問題時有發生。因此,如何將(jiang)施(shi)工(gong)(gong)隊伍中(zhong)的技(ji)術管理人(ren)(ren)員(yuan)和(he)技(ji)術工(gong)(gong)人(ren)(ren)融合為一(yi)個(ge)有機的整體以及實現對(dui)施(shi)工(gong)(gong)操作人(ren)(ren)員(yuan)的有效控(kong)制(zhi)(zhi)是(shi)工(gong)(gong)程施(shi)工(gong)(gong)中(zhong)的關鍵問題之一(yi)。可以說,有效控(kong)制(zhi)(zhi)好人(ren)(ren),就(jiu)等(deng)于有效控(kong)制(zhi)(zhi)好工(gong)(gong)程質(zhi)量(liang)。一(yi)般有以下幾個(ge)方(fang)面(mian)的措施(shi):建立健全各(ge)種(zhong)規(gui)(gui)章(zhang)制(zhi)(zhi)度,沒有規(gui)(gui)矩不成方(fang)圓;完善用(yong)(yong)人(ren)(ren)制(zhi)(zhi)度,知人(ren)(ren)善用(yong)(yong);完善獎罰制(zhi)(zhi)度,賞罰分明;完善崗位職責(ze),明確崗位責(ze)任。

2、物料管(guan)理的(de)全(quan)面(mian)控制與(yu)管(guan)理

一(yi)(yi)個工程項(xiang)目所需的(de)(de)(de)材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)種類繁(fan)多,并且(qie)經常(chang)遇到許(xu)多高新材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)及與(yu)之(zhi)相應(ying)的(de)(de)(de)采(cai)購、供(gong)應(ying)、分類存(cun)放、發放使(shi)用(yong)等問題(ti)。因此,必(bi)(bi)須(xu)嚴格(ge)從每(mei)一(yi)(yi)個環節中著手解決(jue)問題(ti)。在材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)的(de)(de)(de)采(cai)購方(fang)面(mian),貨(huo)比三家,在材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)采(cai)購以(yi)(yi)(yi)前做好(hao)市場(chang)調(diao)查(cha)(cha),對(dui)材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)的(de)(de)(de)價(jia)格(ge)、質(zhi)(zhi)量供(gong)應(ying)商(shang)進(jin)(jin)行(xing)評價(jia),經過充分論證以(yi)(yi)(yi)后才能采(cai)購,采(cai)購必(bi)(bi)須(xu)將數量、品牌、規格(ge)、產地等一(yi)(yi)一(yi)(yi)標識清楚(chu),尺寸材(cai)(cai)(cai)質(zhi)(zhi)模(mo)板等必(bi)(bi)須(xu)一(yi)(yi)次到位,以(yi)(yi)(yi)避免影(ying)響(xiang)(xiang)工程進(jin)(jin)度。在材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)的(de)(de)(de)供(gong)應(ying)方(fang)面(mian),必(bi)(bi)須(xu)根據工程的(de)(de)(de)建筑材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)定額(e)和工程變更(geng)以(yi)(yi)(yi)及調(diao)整(zheng)(zheng)的(de)(de)(de)施工預算及時(shi)調(diao)整(zheng)(zheng)供(gong)料(liao)(liao)(liao)(liao)計劃,從而保證材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)按實際需求給(gei)予供(gong)應(ying),必(bi)(bi)須(xu)完善材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)進(jin)(jin)場(chang)檢(jian)驗制度,安排對(dui)所進(jin)(jin)場(chang)的(de)(de)(de)材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)進(jin)(jin)行(xing)檢(jian)查(cha)(cha),拒絕不合格(ge)材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)進(jin)(jin)場(chang),為工程質(zhi)(zhi)量把好(hao)第一(yi)(yi)關(guan)。建立材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)臺賬(zhang),結合工程實際情(qing)對(dui)材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)的(de)(de)(de)出入(ru)庫進(jin)(jin)行(xing)動(dong)態管理,及時(shi)了(le)解材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)的(de)(de)(de)購買(mai)和使(shi)用(yong)耗(hao)損情(qing)況,避材(cai)(cai)(cai)料(liao)(liao)(liao)(liao)不夠(gou)或者多余,對(dui)工程進(jin)(jin)度或效益造成影(ying)響(xiang)(xiang)。

3、加強工程的成本與質量管理

為了控(kong)制(zhi)工(gong)(gong)(gong)(gong)(gong)程(cheng)成(cheng)(cheng)本,應該建立項目(mu)成(cheng)(cheng)本管理(li)(li)責(ze)任制(zhi)。在(zai)工(gong)(gong)(gong)(gong)(gong)程(cheng)建設(she)開始以前要做(zuo)好預算,在(zai)施工(gong)(gong)(gong)(gong)(gong)過程(cheng)中及時(shi)了解和(he)掌握(wo)市場動態,比如材(cai)料價格(ge)等;加強管理(li)(li),優化施工(gong)(gong)(gong)(gong)(gong)方案,加強工(gong)(gong)(gong)(gong)(gong)程(cheng)質(zhi)量,減少隱性的(de)浪費和(he)不必要的(de)返工(gong)(gong)(gong)(gong)(gong);提(ti)高工(gong)(gong)(gong)(gong)(gong)作效率,通過優化人員(yuan)結(jie)構,采用技術(shu)嫻(xian)熟的(de)施工(gong)(gong)(gong)(gong)(gong)隊伍,采用先進設(she)備和(he)施工(gong)(gong)(gong)(gong)(gong)技術(shu)。項目(mu)管理(li)(li)人員(yuan)在(zai)完成(cheng)(cheng)工(gong)(gong)(gong)(gong)(gong)程(cheng)任務的(de)同時(shi)還應考(kao)慮(lv)成(cheng)(cheng)本責(ze)任的(de)實(shi)現,進一步明確成(cheng)(cheng)本管理(li)(li)責(ze)任,使每個管理(li)(li)者(zhe)都有成(cheng)(cheng)本管理(li)(li)意識,做(zuo)到精打(da)細算。

項目成本(ben)(ben)(ben)管(guan)(guan)理是一(yi)項系(xi)統工(gong)(gong)(gong)(gong)程(cheng)(cheng)(cheng)(cheng),一(yi)般來說成本(ben)(ben)(ben)管(guan)(guan)理包括以下幾個(ge)方面的(de)過(guo)程(cheng)(cheng)(cheng)(cheng):資源計劃過(guo)程(cheng)(cheng)(cheng)(cheng)、成本(ben)(ben)(ben)估算(suan)過(guo)程(cheng)(cheng)(cheng)(cheng)、成本(ben)(ben)(ben)預算(suan)過(guo)程(cheng)(cheng)(cheng)(cheng),成本(ben)(ben)(ben)估算(suan)過(guo)程(cheng)(cheng)(cheng)(cheng),四個(ge)過(guo)程(cheng)(cheng)(cheng)(cheng)相互(hu)影響、相互(hu)作(zuo)用(yong),有時也(ye)與(yu)外界的(de)過(guo)程(cheng)(cheng)(cheng)(cheng)發生交互(hu)影響,根據項目的(de)具體情況,每一(yi)過(guo)程(cheng)(cheng)(cheng)(cheng)由一(yi)人(ren)(ren)或(huo)數人(ren)(ren)或(huo)小組完(wan)成,在(zai)(zai)項目的(de)每個(ge)階段,上(shang)述(shu)過(guo)程(cheng)(cheng)(cheng)(cheng)至少出(chu)現(xian)一(yi)次。加強質(zhi)(zhi)(zhi)量管(guan)(guan)理必(bi)須明確該工(gong)(gong)(gong)(gong)程(cheng)(cheng)(cheng)(cheng)的(de)質(zhi)(zhi)(zhi)量要(yao)求,編制好施(shi)工(gong)(gong)(gong)(gong)組織設計、質(zhi)(zhi)(zhi)量保證措施(shi)及施(shi)工(gong)(gong)(gong)(gong)方安案。在(zai)(zai)施(shi)工(gong)(gong)(gong)(gong)的(de)過(guo)程(cheng)(cheng)(cheng)(cheng)中(zhong)加強內部自檢,執行專職質(zhi)(zhi)(zhi)檢員(yuan)一(yi)票否決(jue)制,對在(zai)(zai)工(gong)(gong)(gong)(gong)程(cheng)(cheng)(cheng)(cheng)中(zhong)出(chu)現(xian)的(de)質(zhi)(zhi)(zhi)量問(wen)(wen)題一(yi)定(ding)要(yao)責(ze)任人(ren)(ren)不(bu)(bu)(bu)受(shou)處(chu)罰不(bu)(bu)(bu)放(fang)過(guo),質(zhi)(zhi)(zhi)量問(wen)(wen)題得不(bu)(bu)(bu)到解(jie)決(jue)不(bu)(bu)(bu)放(fang)過(guo),相關人(ren)(ren)員(yuan)不(bu)(bu)(bu)受(shou)到教育(yu)不(bu)(bu)(bu)放(fang)過(guo)。以工(gong)(gong)(gong)(gong)序(xu)定(ding)崗位,使每項工(gong)(gong)(gong)(gong)序(xu)落實到人(ren)(ren),責(ze)任到人(ren)(ren),從而(er)有效(xiao)地組織好質(zhi)(zhi)(zhi)量管(guan)(guan)理,使工(gong)(gong)(gong)(gong)程(cheng)(cheng)(cheng)(cheng)項目達到優良工(gong)(gong)(gong)(gong)程(cheng)(cheng)(cheng)(cheng)標準(zhun)。

二(er)、高速公路工程的水土保(bao)持問題

1、河岸(an)的防沖刷措施

為(wei)了(le)減少(shao)施(shi)工(gong)過程(cheng)中及施(shi)工(gong)后(hou)的(de)水(shui)土流失,降低工(gong)程(cheng)的(de)環(huan)境成本,以最大限度地實現(xian)(xian)高速(su)公路(lu)工(gong)程(cheng)對(dui)當地環(huan)境影響。高架橋的(de)墩柱位于河(he)道(dao)(dao)內(nei),縮小了(le)河(he)道(dao)(dao)水(shui)流的(de)斷面(mian)面(mian)積,改變了(le)這一(yi)段(duan)面(mian)的(de)水(shui)流方向,易(yi)造(zao)成河(he)岸沖(chong)刷。為(wei)避免(mian)這一(yi)現(xian)(xian)象(xiang)發生(sheng),墩柱施(shi)工(gong)后(hou)在高架橋所(suo)經河(he)道(dao)(dao)兩(liang)岸要增設砌片石護坡,并對(dui)墩柱處(chu)的(de)河(he)道(dao)(dao)進(jin)行清(qing)(qing)淤處(chu)理。這樣將(jiang)增加墩柱段(duan)面(mian)的(de)水(shui)流面(mian)積,減緩河(he)水(shui)的(de)流速(su),因而有效地清(qing)(qing)除了(le)水(shui)流對(dui)兩(liang)側河(he)岸的(de)沖(chong)刷,保護了(le)河(he)岸的(de)穩定。特殊的(de)情況下,將(jiang)橋墩上下游一(yi)定范(fan)圍內(nei)河(he)道(dao)(dao)內(nei)的(de)垃圾或(huo)者堵塞進(jin)行清(qing)(qing)除,保證(zheng)河(he)道(dao)(dao)順暢。

2、路基邊坡的防沖刷措施

由于路(lu)(lu)基、路(lu)(lu)塹(qian)邊(bian)坡地質(zhi)情(qing)況不一,某些土質(zhi)如礫石土等的粘結(jie)性(xing)差,易受沖(chong)刷造成水(shui)土流失(shi),一般來說,大部分路(lu)(lu)基邊(bian)坡沖(chong)刷坍塌等都發生在路(lu)(lu)塹(qian)開(kai)挖(wa)的過程中,所以(yi)在路(lu)(lu)塹(qian)開(kai)挖(wa)之(zhi)前在路(lu)(lu)塹(qian)上方修排(pai)水(shui)溝,減少坡面(mian)匯水(shui)沖(chong)刷邊(bian)坡,路(lu)(lu)基在填(tian)筑過程中優先考慮排(pai)水(shui)措施。對(dui)已成型的路(lu)(lu)塹(qian)邊(bian)坡采用客土噴播進行防護(hu)。客土噴播時植物種(zhong)子(zi)主(zhu)要以(yi)灌木為主(zhu),草、花、喬相結(jie)合的物種(zhong)搭配方式較為適宜,不僅能起到保護(hu)路(lu)(lu)基邊(bian)破,保持水(shui)土穩定的作用,更有美(mei)化環境(jing)的效果。

三、養護(hu)管理(li)工作中的問題(ti)、原(yuan)因(yin)及對策

在現(xian)階段(duan)高速公路養(yang)護(hu)管理(li)工(gong)作中還存在一些問(wen)題,其原因較為(wei)復雜和(he)多元化,諸(zhu)如人為(wei)認識(shi)力(li)度不足、監(jian)管不力(li)以(yi)及(ji)養(yang)護(hu)資金的合理(li)足量供給等問(wen)題都需要(yao)高度重視。

應提高認(ren)識,充分認(ren)識到建設(she)是(shi)發(fa)展,養(yang)護(hu)管理也是(shi)發(fa)展。特(te)別是(shi)在我國高速(su)(su)公(gong)(gong)路路面(mian)早(zao)期損壞(huai)較為嚴(yan)重(zhong)和車流量迅速(su)(su)增加以及(ji)重(zhong)型超載車輛(liang)比重(zhong)過大(da)的(de)(de)情況下,做好及(ji)時有效的(de)(de)養(yang)護(hu)管理工作(zuo),減輕路面(mian)損壞(huai),延長(chang)公(gong)(gong)路的(de)(de)使用(yong)壽命尤為重(zhong)要(yao),這不僅(jin)是(shi)公(gong)(gong)路工程的(de)(de)內在要(yao)求,也是(shi)建設(she)節(jie)約型社會,實(shi)現經濟可持續發(fa)展的(de)(de)戰略(lve)的(de)(de)必然(ran)選擇,意義(yi)重(zhong)大(da)。

要(yao)從(cong)思(si)想認識上貫徹落(luo)實(shi)“建(jian)養并(bing)重”的方針,切實(shi)扭轉長期重建(jian)、輕養、輕管(guan)理的傾向,增加(jia)做(zuo)好養護(hu)管(guan)理工作的責任感和緊(jin)迫感;要(yao)從(cong)行動上落(luo)實(shi)各項(xiang)養護(hu)管(guan)理措族,做(zuo)到領(ling)導力量(liang)到位,養護(hu)資金到位,養護(hu)組織(zhi)到位。

另外,要建(jian)立健(jian)全的(de)監管機制,加強督(du)促檢查。管養分離,提高養護(hu)(hu)隊伍的(de)專(zhuan)業(ye)化程度當前高速公路的(de)管理(li)和(he)養護(hu)(hu)為一(yi)體,所在養護(hu)(hu)作(zuo)業(ye)實行內部單(dan)位行政管理(li),養護(hu)(hu)生產(chan)單(dan)位小面全,擔負(fu)著各種養護(hu)(hu)作(zuo)業(ye)任(ren)務,而每(mei)支隊伍又(you)由很多從地方臨時招收(shou)的(de)人(ren)員組成的(de),技(ji)術水平低(di)下,缺乏較(jiao)強的(de)專(zhuan)業(ye)知識。

高速公路需要(yao)的(de)(de)(de)是高質量(liang)、高效率(lv)的(de)(de)(de)專(zhuan)(zhuan)業養(yang)護(hu)維(wei)護(hu)作業,而這(zhe)樣(yang)的(de)(de)(de)養(yang)護(hu)作業又必須由高效率(lv)、高技術(shu)的(de)(de)(de)隊(dui)(dui)伍完成的(de)(de)(de),如果配備不(bu)(bu)當,必然會造成大型(xing)養(yang)護(hu)機械設備的(de)(de)(de)擱(ge)置,工作效率(lv)的(de)(de)(de)降低(di)。因此,必須管養(yang)分離,把養(yang)護(hu)作業推向(xiang)市場對養(yang)護(hu)作業進行招(zhao)標,這(zhe)樣(yang)不(bu)(bu)僅可以引進專(zhuan)(zhuan)業化的(de)(de)(de)養(yang)護(hu)隊(dui)(dui)伍,而且可以引進先進的(de)(de)(de)科學技術(shu),提(ti)高高速公路管理(li)與維(wei)護(hu)水平,并且會培(pei)養(yang)出一批專(zhuan)(zhuan)業的(de)(de)(de)應用型(xing)人才,以求達到注(zhu)重科技,提(ti)高管理(li)水平,加強機械化養(yang)護(hu)水平的(de)(de)(de)目的(de)(de)(de)。